Handyman Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment__2__AF_3052_-_Construction_Cost_Estimate_Breakdown_PDF.PDF | ||
| TOPR_Attachment__1_Statement_of_Need_MCE_Turnstile.doc | DOC document | |
| TOPR_Attachment__2_Site_Picture.pdf | ||
| Attachment__3_MCE_Turnstile_Task_Order_Proposal_Request.doc | DOC document | |
| FA4686-15-R-0008 _Handyman_Solicitation.doc | DOC document | |
| Attachment__4_DBA_Wage_Determination_CA150009_14_Aug_2015_CA9.pdf | ||
| Attachment___5_Hold_Harmless_Agreement_-_Handyman.docx | DOCX document | |
| Attachment__6_Entry_Authorization_List_(EAL)_Template.xls | XLS spreadsheet | |
| Attachment__7 _Draft_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4686-15-D-00XX
Statement of Work for
Handyman Multiple Award Construction Contract (MACC) Solicitation No: FA4686-15-R-0008 9th CIVIL ENGINEERING SQUADRON
6425 B Street
Beale AFB, CA
13 Aug 15 Table of Contents Section Title
1 Description
2 Definitions
3 Standard vs. Non-Standard Work Hours
4 Contract Start-up and Completion Period
5 Contractor-Provided Materials
6 Task Order Procedures
7 Proposal Submittal
8 Cost Estimate Example
9 Performance of Work by the Contractor
10 Final Inspections and Acceptance
11 Government-Furnished Equipment/Materials (GFE/GFM)
12 Security Requirements
13 Work by the Government
14 Scheduling Work
15 Work Clearance
16 Utilities
17 As-Built Drawings
18 Government-Provided As-Builts
19 Environmental Protection
20 Construction Site Maintenance
21 Grounds Maintenance
22 Construction Signs
23 Barriers and Enclosures
24 Noise Control
25 Equipment On the Site
26 Access Roads and Trucking
27 Elevators
28 Safety and Health
29 Recording and Preserving Historical and Archeological Finds
30 Professional Registration, Certifications, and Contractor Liability
31 Communications
32 Government Liability for Loss or Damage to Contractor Property
33 Construction Requirements
34 Data for Warranty/Guarantee Items
35 Quality Control Program
36 Project Manager
37 Attachments
1. DESCRIPTION:
1.1. The Handyman contract is for a broad range of maintenance, repair, alteration, and minor construction projects on real property at Beale AFB, California and base satellite locations, as required, in support of the 9th Civil Engineering Squadron (9 CES). The Contractor is required to furnish all requirements including but not limited to materials, labor, plans, tools, equipment, transportation, supervision, management, quality assurance, and technical design support in accordance with the basic contract specifications and individual Handyman TO requirements.
1.2. The contract will be a fixed-priced Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract and will require a wide variety of individual construction tasks to be performed as individual projects to be issued as task orders against the basic contract.
1.3. The contracting office will issue a request for proposal (TOPR) and the resulting task orders to the Contractor for accomplishing the identified work. The Contractor shall be required to furnish all equipment, materials, and personnel necessary to complete designs, accomplish construction, and manage the task orders in the time period and to the quality required in the contract.
1.4. The Contractor shall prepare a proposal to include a complete Statement of Work (SOW), construction drawings (if applicable), schedules, and cost estimate. The applicable construction standards in Section 38 shall be used as the minimum standard for building code compliance, quality and general requirements applicable to every project. In preparing the proposal, the Contractor shall research existing record drawings and independently conduct as many site visits as necessary to have a satisfactory knowledge of the site conditions that can affect the work or its cost.
1.5. Work will require expertise in various construction trades to include, but not limited to: carpentry, road repair, roofing, excavation, interior renovation, electrical, plumbing, HVAC, sheet metal, welding, painting, demolition, concrete masonry, asbestos and lead based paint surveys and abatement, and soil remediation.
1.6. Upon issuance of a task order, the Contractor will diligently complete all work within the time frames specified in the task order and approved progress schedules. The Contractor shall perform all necessary quality control functions to ensure the work is executed in compliance with the terms of the task order and this contract.
2. DEFINITIONS:
2.1. The following definitions apply to all work required by this solicitation and the resulting contract:
2.2. As-Built Drawings: Final site drawings prepared by the Contractor in sufficient detail to accurately reflect the project as fully constructed, complete with all changes, modifications, and deletions from prior award drawings. As-Builts will not be required on most projects under this IDIQ. See Section 18 for more information.
2.3. Concept Drawing: Project concept drawings are basic drawings containing sufficient detail to convey the main features of a project.
2.4. Construction Cost Proposal: A detailed construction cost proposal shall be prepared for each task order showing each division of work, line items under the division, quantity and cost. The cost proposal shall be accomplished by the Contractor from approved drawings and/or the Government-provided Statement of Need (SON).
2.5. Controlled Areas: See Restricted Work Areas, Section 2.21 below.
2.6. Drawings: Graphical representations documenting the work required by each Government project. See Sections 4 and 21 for more information.
2.7. Government-Furnished Equipment / Government-Furnished Property (GFE / GFP): Items provided by the Government to the Contractor for use in performance of this contract. Any Government Furnished Items will be identified per task order. See SOW Section 12 and SOW Section 21. Any request for trailers shall be coordinated through 9 CONS.
2.8. Negotiations: A reasonable number of meetings between the Government and the Contractor as necessary to come to full agreement on all project aspects including pricing, appropriate line items and quantities, technical requirements, and performance required for each identified construction project.
2.9. Notice to Proceed (NTP): Formal notification from the Contracting Officer to the Contractor to begin performance on a specified project, to include ordering of materials. The NTP identifies the effective start date of the project performance and the scheduled completion date and/or number of days remaining in the performance time.
2.10. Pre-Construction Conference: A meeting attended by designated representatives of the Government and the Contractor after project award but before the start of work to discuss all aspects of the required work for a specific project.
2.11. Pre-Final Inspection: An examination requested by the Contractor, with Government representatives present, to identify and correct all work discrepancies prior to requesting a final inspection by the Government.
2.12. Progress Meeting: A meeting attended by designated representatives of the Government and Contractor to discuss progress on existing and/or potential projects as well as the basic contract performance.
2.13. Proposal Package: The Contractor’s technical and cost proposals provided in response to the Contracting Officer’s Request for Proposal (TOPR). See Section 12 for details on the proposal package.
2.14. Redline Drawings: One set of E size (24”x36”) drawings maintained by the Contractor at the work site where all changes are recorded, to include any hidden or subsurface data discovered during construction.
2.15. Restricted Work Areas: Areas of performance on Government property with increased security requirements within which the Contractor is not allowed free access to the work site, cannot enter and exit freely, and will be required to be under escort during performance of the project. Personnel and equipment entry will be subject to delays due to security processing.
2.16. Scope of Work: A Government-produced rough description of work tasks to be accomplished. This differs from the Contractor-produced Statement of Work, which is a more detailed description of exactly how the Contractor will complete the project.
2.17. Scoping Meetings: A reasonable number of meetings attended by representatives of the Government and the Contractor to discuss and define the work requirements of each project in sufficient detail to allow the Government to develop a Statement of Need (SON) and the Contractor to prepare a Statement of Work (SOW), required drawings, material submittal forms, and all else necessary to successfully complete the project.
2.18. Site Visits: A reasonable number of investigative visits to a location at which work has been proposed by the Government to be done by the Contractor. The purpose of the visit is for the Contractor to gather enough information to prepare the Statement of Work, drawings, and construction cost proposal, and for the Government to prepare or revise a Scope of Work.
2.19. Statement of Work (SOW): A specific written description (in the quality, detail, and professionalism necessary) documenting the specific work required for each Government project. The SOW is prepared by the Contractor from a Government-supplied general Statement of Need (SON).
3. STANDARD VS. NON-STANDARD WORK HOURS:
3.1. Standard Working Hours: The Contractor shall generally be prepared to pursue contracted tasks during the standard working period of 0700 to 1700 hours (7:00 a.m. to 5 p.m.), Monday through Friday, excluding federal holidays. The Contractor may elect to work hours other than standard duty hours provided that:
3.1.1. The request is submitted in writing at least three (3) workdays in advance.
3.1.2. The Contracting Officer approves the request.
3.1.3. Work performed outside standard working hours or on weekends or federal holidays that the Contractor chooses to perform during non-standard hours will be considered and charged as standard hours.
3.2. Non-Standard Working Hours: Work required by the Government at other than standard duty hours will be considered nonstandard working hours, that is, Monday through Friday from 1700 to 0700 hours, Saturdays, Sundays, and federal holidays.
4. CONTRACT START-UP AND COMPLETION PERIOD:
4.1. The contractor’s proposal will determine the time period reasonably necessary to perform all elements of the Task Order to include materials and labor.
4.2. Although the Government may issue task orders against this contract through the final date of the contract period of performance, the Contractor must physically complete all work outlined in any task order within 120 days after the date of contract end.
4.3. The Contractor is required to vacate any and all areas provided to him, including any office areas and individual work sites or storage yards, and remove all Contractor-owned equipment, within three (3) days of the conclusion of the final task order issued under this contract, whether by termination or natural completion, or within (14) calendar days of being notified in writing by the Contracting Officer at any other period during performance.
4.4. After the contract completion period, within 7 days, the Government will conduct a walkthrough of the Contractor’s formerly occupied areas. Any discrepancies, damages, and required cleanup will be notified to the Contractor in writing. The Contractor will have 48 hours to resolve the notification(s) from the Government. If the Contractor fails to resolve adequate cleanup or repair of damages, the cost for identified items may be completed by the Government or services procured from a third party, and charges billed to the Contractor.
5. CONTRACTOR-PROVIDED MATERIALS:
5.1. All Contractor-provided materials shall become the sole property of the Government.
5.2. Software Programs, Licenses, and Upgrades: Any software, licenses, manuals, or system upgrades as a result of construction on Beale AFB shall become sole property of the Government.
6. TASK ORDER PROCEDURES:
6.1. As the need exists for performance under the terms of this contract, the Contracting Officer (CO) will notify the Contractor of a potential performance requirement.
6.2. 9 CES will submit a project package to the Contracting Officer including a Statement of Need (SON) and AF Form 813 (Request for Environmental Impact Analysis), among other documents. The CO will then forward the Contractor a Task Order Proposal Request (TOPR).
6.2.1. If the project incorporates any additional project items as optional CLINs, the SON will describe the anticipated details of that aspect of performance including performance period, consideration of mobilization and/or demobilization activities, progressive flow of construction activities, and the impact of additional performance on the task order (TO) as a whole.
6.2.2. The Contractor may be requested to provide cost and technical proposals or designs within the last quarter of the fiscal year in anticipation of fall out funds (money which is not yet obligated by the Government, but which is expected to become available prior to fiscal year end). In anticipation of this potential work, and the fast turnaround required at fiscal year-end to secure funds should they become available, the Contractor may be asked to provide a cost and technical proposal at no liability to the Government to award the project. In this instance the Contractor will complete a Hold Harmless Agreement prior to their proposal preparation. Please see Attachment 1 for a Sample Hold Harmless Agreement.
6.3. Upon receipt of an TOPR, the Contractor shall respond to the needs of the Government by scheduling a site visit through the CO within the timeline designated in the TOPR, generally three (3) or five (5) days from issuance of the TOPR. The site visit will be conducted in the company of the Contractor, contracting personnel, the end user or facility manager, and 9 CES at the proposed work site. If specific disciplines are needed at the meeting, other base agencies (fire department, safety, communications, etc.) may also be invited to attend.
6.4. Proposals will be evaluated on the basis of Lowest Price, Technically Acceptable methodology. Initially all proposals will be arranged by price. The lowest priced offeror will be reviewed for Technical Acceptability. Material, Labor, and the Scope of Work/SOW will be evaluated to ensure the contractor understands the work, has furnished an effective approach, and is line with the pricing. If the lowest priced is technically acceptable, award may be made to that offeror.
6.5. Note: Any reference to any equipment, material, article or patented process by trade name, make or catalog number requested by the Government shall be regarded as establishing a standard of quality only.
6.6. Contractor will submit questions regarding the project in writing to the CO.
6.7. An amendment to the TOPR will be issued by the CO incorporating any changes to the Scope of Work as determined during the site visit, or as a result of other Contractor questions.
6.8. Upon establishment of the final scope of the individual requirement, the Contractor shall then prepare a proposal package for submission to the Contracting Officer through the contract administrator. See Section 10 for additional instructions on compiling proposal packages.
6.9. The Contractor shall accomplish their proposal package and return it to the Contracting Officer by the suspense date reflected on the Request for Proposal. The suspense date will be determined by the CO based on the magnitude, complexity, and urgency of the project; generally a suspense date of five (5) workdays after the site visit will be determined, taking these factors into consideration. The Contractor shall have enough staff to ensure proposals are completed within the established suspense dates.
6.10. The CO will then forward the proposal to the 9 CES for review. Upon receipt of the Contractor’s proposal, the Government will accomplish a technical evaluation of the proposal. If 9 CES has questions about the Contractor’s proposal, the Contract Administrator may call a fact-finding meeting in order to clarify Government questions and misunderstandings.
6.11. A fact finding and negotiation meeting may be scheduled by the contracting office to discuss and negotiate all variances in quantities, hours, start date, and performance times with the Contractor. 9 CES personnel may also be in attendance if requested by the CO.
6.12. The Contractor will provide a final cost estimate, technical proposal, and Statement of Work (SOW) based on the negotiated terms. The Contractor’s final submittal will be reviewed and approved by 9 CES.
6.13. The finalized price for the proposed project will remain valid for ninety (90) calendar days, unless otherwise negotiated with the Contracting Officer.
6.14. The Contracting Officer will issue a task order against the contract using DD Form 1155 and will distribute the award to all parties. Construction performance will be based on the Contractor’s proposed construction schedule, in coordination with the end users requirements.
6.15. Typically, the work will not be complex and will not require a pre-construction meeting, bonding, a Contract Progress Schedule, or a contract progress report. However, when required, the Contractor, subcontractors, contracting, 9 CES, building manager, and other pertinent base officials (i.e. Safety, Security Forces, Communications) will have a pre-construction meeting to discuss specific issues for the task order. At this meeting the Contractor will provide a construction schedule and timelines on an AF 3064 (Contract Progress Schedule, Attachment 2), if the period of performance is expected to exceed 60 days; Performance and Payment Bonds, as required; an SF 1413 (Statement and Acknowledgment, Attachment 3) for all tier levels of subcontractors needed for project completion; an AF 3000 (Material Approval Submittal, Attachment 4) for any known proposed materials; and any other documents as requested by the CO.
6.16. Actual construction on the site will not occur until an AF Form 103 (Base Civil Engineering Work Clearance Request) has been completed and the CO has approved the proposed start date.
6.17. If required by the SOW or SON, the Contractor will provide bi-weekly progress reports using AF 3065 (Contract Progress Report; Attachment 5), until project completion.
6.18. The Contractor may request a pre-final inspection for the purpose of having the Government assist in identifying potential problems or areas of correction required prior to the final inspection. The Contractor will request the pre-final inspection from the Contracting Officer and a date will be scheduled by the contracting office. Pre-final inspections will typically include the Contracting Officer and Contracting Administrator, 9 CES, Contractor personnel (to include subcontractors), requirements/end user personnel, operations and maintenance personnel, and representatives throughout the installation (fire, safety, security, etc.), as needed.
6.19. The Contractor will request a final inspection from the Contracting Officer three (3) working days prior to the desired date of inspection. The final inspection will typically include 9 CES, the Contractor, the CO, the CA and other base entities as needed. More information regarding final inspections is included in Section 14. 9 CES will have seven (7) working days to inspect the final work and establish acceptance or communicate discrepancies.
6.20. Prior to final invoicing, the Contractor will provide all as-builts, warranty items and documentation, and all other required documentation as outlined in this Statement of Work.
7. PROPOSAL SUBMITTAL:
7.1. The Contractor’s proposal must be supported by adequate documentation to demonstrate that thorough planning has been accomplished to complete the task order, including a cost proposal, technical proposal, Statement of Work (SOW), and additional items as necessary.
7.2. The Contractor’s proposal package will be provided for both initial and final review of CE and Contracting personnel, between which the Contractor will make any necessary and negotiated changes.
7.3. The Contractor’s proposal package shall include, as applicable, but is not limited to:
7.3.1. Cost Proposal / construction estimate: The Contractor shall identify priced line items that address the requirement and the proposed quantities thereof. The Contractor’s cost proposal shall include the specific quantities and costs.
7.3.2. Statement of Work: SOW shall identify and describe in detail the Contractor’s specific tasks, explain any extenuating site conditions/issues, establish performance times, outline material submittals and submittal dates.
7.3.3. Subcontract backup documentation. The Government reserves the right to request Subcontractor pricing cost breakdowns, if necessary. Subcontractors may utilize unit cost estimating software similar to the prime Contractor, or submit a Construction Cost Estimate Breakdown (Attachment 6).
7.3.4. Material submittal documents for known submittal items or proposed dates for future submittals.
7.3.5. The Solid Waste Diversion and Disposal Report (Attachment 7); not less than quarterly, as required by Beale’s Integrated Solid Waste Management program. See Section 19.7.1. Contractors are to use Recology Yuba-Sutter for ordering construction dumpsters and other landfill services.
7.3.6. The BAFB Green Procurement Tracking Form or BAFB Green Procurement Exemption Form (Attachment 8) as required by Beale’s Green Procurement Program. See Section 19.8.
7.3.7. Appropriate maps to include topographic, loading zones, and vicinity to roads, buildings, and other landmarks, if required.
7.3.8. Necessary layout to include floor and demolition plans displaying utility features.
7.3.9. Color boards or fabric samples, if required.
7.3.10. Project-specific Accident Prevention Plan, if required.
7.3.11. Facility Drawings.
7.3.12. Design calculations to substantiate proposed layout and sizing of utilities and structure elements.
7.3.13. Any other requirements cited in the Government’s Scope of Work.
8. COST PROPOSALS / EXAMPLE:
8.1. Bare costs are shown for materials, labor, and equipment needed to complete the Unit Price line item.
8.2. The Davis-Bacon Wage rates which are in effect at the time of award, and at the time each option period is exercised, if option periods are exercised by the Government, will be incorporated into the contract and will be applied to task orders issued within that period of performance.
8.3. Cost estimates are to be generated using bare material, equipment, and labor costs, outlined by division and line item.
9. PERFORMANCE OF WORK BY THE CONTRACTOR:
9.1. In accordance with FAR 52.219-14, Limitations on Subcontracting, the Contractor shall perform at least 15 percent (15%) of the cost of each task order, not including the cost of materials, with its own employees. This percentage may be reduced by a supplemental agreement to this contract or specification per task order, if the Contractor requests a reduction and the CO determines that the reduction would be to the advantage of the Government.
9.2. Contractor shall maintain a professional work area to include their on-site location as well as any job sites. Smoking shall not be allowed except in designated areas. No noxious or harmful fumes shall be allowed to infiltrate occupied facilities or work areas.
9.3. The Contractor shall store all supplies, materials, and equipment in an area approved by the Government. The Contractor must propose a staging area for each task order if one is needed. The Contractor shall be responsible for securing materials and equipment to preclude theft or damage. The site shall be maintained in a neat and orderly manner.
10. FINAL INSPECTIONS AND ACCEPTANCE:
10.1. The Contractor shall request a final inspection in writing at least three (3) working days prior to proposed inspection date. The Contractor shall have a quality control manager inspect the project and ensure all work is complete and meets the terms of the contract prior to the final.
10.2. Any punch list items noted during the final inspection shall be recorded by a Government representative and a copy given to the Contractor within 24 hours of the inspection. The Contractor must provide a written schedule showing completion dates for the punch list items.
10.3. After all discrepancies have been corrected the Contractor shall notify Contracting and request another inspection. Once work has met acceptable standards, as determined by CE and Contracting personnel, the work shall be accepted.
10.4. A maximum of ten percent (10%) of the award price of each task order will be withheld from final payment approval until receipt, acceptance, and approval of all, warranty letters, equipment lists, operation and maintenance manuals, certificates and all other required documents have been received for the task order.
11. GOVERNMENT-FURNISHED EQUIPMENT/MATERIALS (GFE/GFM):
11.1. Government-furnished equipment and material is not to be furnished under this contract unless specifically authorized by the CO.
11.2. The Contractor, with his own forces, shall load and transport all Government-furnished equipment/materials, if any is to be provided, as described on the task order. The equipment/materials shall be transported from the Government storage area to the work site indicated on the task order.
11.3. The Contractor shall follow the instructions of the Contracting Officer’s representative regarding the disposition of all Government-furnished property not consumed in performance of a task order.
12. SECURITY REQUIREMENTS:
12.1. The Contractor shall comply with security regulations imposed by the Installation Commander and the agency occupying the space where work is to be performed, including any necessary security clearances.
12.2. At a minimum, Contractor must submit an Entry Access List Form (EAL, Attachment 9) to be coordinated through Security Forces prior to entering the base. Any person that does not pass EAL screening may not enter the base until approved by Security Forces.
12.3. Prior to mobilization the Contractor shall provide the Contracting Officer or authorized representative a list of personnel requiring authority to work on Beale AFB. The list shall be kept current and the Contracting Office or authorized representative must be notified as to any changes in the list. The Contractor’s employees will be required to obtain and display employee identification as prescribed by Air Force directives. The Contracting Officer shall provide these requirements upon request.
12.4. Whenever facility security is breached to perform work required under this contract, the Contractor will be responsible for providing temporary measures in order to assure security is maintained at the level existing prior to construction. This may include such security items as fencing around a facility or closing all openings in a structure during non-work hours.
13. WORK BY THE GOVERNMENT:
13.1. The Government reserves the right to undertake performance, by whatever means available or necessary, of the same type or similar work as contracted for herein. To do so will not breach or otherwise violate this contract.
14. SCHEDULING WORK:
14.1. Before any work is initiated under an individual task order, the Contractor and Contracting, with the coordination of the CE representative and other base entities as needed, shall agree on a sequence of procedures for execution. Items discussed shall include: means of access to premises and facilities, space for storage of materials and equipment, delivery of materials and use of approaches, use of corridors, stairways, elevators, spaces, and restrooms for the Contractor’s employees.
14.2. Prior to any work being initiated the Contractor shall ensure that an AF Form 103 (Base Civil Engineering Work Clearance Request) has been coordinated and completed in its entirety by CE, and authority to begin work has come from the Contracting Officer. The Contractor shall not, under any circumstances, enter an “N/A” into any blocks on the form.
14.2.1. Ground disturbing work may not be performed within the rainy season; this exclusionary period is designated from 1 November through 1 May.
14.3. Delivery and storage of materials and equipment shall be made with minimum interference to Government operations and personnel.
14.4. The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections or divisions are begun.
14.5. The Contractor shall obtain a permit from the Base Fire Chief for all hot work (use of oxyacetylene gas or welding machine).
15. WORK CLEARANCE:
15.1. The Contractor shall apply for and obtain a properly approved and coordinated AF Form 103 (Base Civil Engineering Work Clearance Request) prior to beginning performance under any task order, including any digging, drilling, or excavation. The Contractor shall obtain digging permits directly from 9 Civil Engineering Squadron. The Contractor may have to provide, at no additional cost, drawings and/or details showing the exact location and description of the type of excavations to be accomplished.
15.2. The Contractor shall request the AF 103 at least fourteen (14) days prior to the expected start date of work; failure to request the AF 103 in a timely manner does not constitute an acceptable delay of the negotiated project period of performance.
15.3. Digging permit markings for a specified area expire thirty (30) days after the issue date. The Contractor must re-apply for a new digging permit to perform excavation in the area if the excavation was not started within the thirty (30) day period. Permits will identify all underground utilities within five (5) feet (1500 mm) of the designated area.
15.4. The Contractor shall insure that the location of all underground utilities, once located and marked by the Government, are adequately maintained to preclude remarking by Government personnel. Should any one of the coordination points indicate an additional underground utility or structure over and above those shown on the contract drawing either by sketch on the Contractor's drawing, by field pointing, or by flagging, the Contractor shall be responsible for protection of each of the items indicated. If the Contractor damages any of the items indicated, he shall be responsible for prompt repair of the damage to return the item to its original workable condition.
16. UTILITIES:
16.1. Available water, electrical and local telephone services at the job site may be used in the performance of work under this contract at no cost to the Contractor. The Government shall not be held liable for interruptions of utilities. Electricity will not be used for heating purposes. The Contractor shall make arrangements for such services with the Contracting Officer or his designated representative.
16.2. At least ten (10) working days prior to a requested outage the Contractor shall request, and the Base Civil Engineer shall approve, all temporary outages of any utility services required for the performance of work under this contract. No outage will be performed without prior written approval from 9 CES.
17. AS-BUILT DRAWINGS:
17.1. Red-line Drawings: During the progress of work, the Contractor shall keep a careful record at the job site of all changes and corrections from the layouts shown on the previously-existing drawings, if applicable. The Contractor shall enter such changes and corrections on contract or record drawings promptly and submit drawings to 9 CES in accordance with the schedule provided in the task order. Certified as-builts will not be required.
18. GOVERNMENT-PROVIDED AS-BUILTS:
18.1. The Contractor may request Government-provided drawings or as-builts from the CE team, as needed; the Government will attempt to accommodate the request but cannot guarantee availability of existing drawings.
18.2. The Contractor should presume that Government-provided drawings and/or as-builts will not be provided. Any Government-provided drawings or as-builts will be used for informational purposes only for development of Contractor’s proposed or final submittals.
18.3. If provided, the Government does not guarantee the accuracy or adequacy of existing as-built drawings that may be made available to the Contractor. It is the Contractor’s responsibility to field-verify all existing conditions prior to submitting proposals for work under any task order.
18.4. After award of a task order, increases in award price shall not be granted based on site conditions that the Government determines could have been verified prior to task order issuance.
19. ENVIRONMENTAL PROTECTION:
19.1. Solid, Liquid, and Gaseous Contaminants. The Contractor shall be responsible for the proper disposal of all solid, liquid, and gaseous contaminants, including asbestos and lead-based paints, in accordance with all applicable Federal, State, and local codes and regulations.
19.2. Disposal of Refuse. The Contractor shall be required to remove all refuse from Beale AFB for task orders unless otherwise approved. The Contractor shall use Recology Yuba-Sutter for all dumpsters and other disposal needs.
19.3. Covered Chutes. All chutes for refuse or other materials disposed of during execution of a task order shall be covered or of such design as to fully confine the material to prevent dissemination of dust.
19.4. Contractor shall not incorporate any asbestos containing material in any work.
19.5. Contractor shall submit the initial asbestos and lead base paint abatement plans as part of the task order design/proposal submittals.
19.6. The applicable items from the list below will be included in the Contractor’s proposed schedule and will be submitted by the Contractor once the task order has been awarded:
19.6.1. Request for use of Ionizing Radiation (if required)
19.6.2. Request for use of Lasers (if required)
19.6.3. Request for use of Radioactive Materials (if required)
19.6.4. Request for use of Radio Frequency radiation (if required)
19.6.5. Request for use of Ultraviolet Radiation (if required)
19.6.6. Environmental Protection Plan (if required)
19.6.7. Contaminated Soil Sampling and Analysis Plan (if required)
19.6.8. Storm Water Pollution Prevention Plan (if required)
19.6.9. Copy of NPDES NOI and EPA approval (if required)
19.6.10. Wetlands Permit (if Contractor-obtained)
19.6.11. Dewatering Permit (if required)
19.6.12. Phase I Environmental Assessment Certificate for Imported Borrow Materials (if required)
19.6.13. Any other Environmental Plans or Permits the Contractor is required to obtain in order to legally perform the work of the task order.
19.7. Integrated Solid Waste Management:
19.7.1. The Contractor must comply with the Beale AFB Integrated Solid Waste Management Plan (ISWMP). The Beale ISWMP requires construction and demolition debris to be recycled, re-used or mulched when possible. Reduction of solid waste through recycling and landfill diversion is mandated by Air Force policy and California law. Disposal of hazardous items (i.e., cleaning products, batteries, drain cleaner, pesticides, herbicides, motor oils, paints, gas, kerosene, etc.) in the solid waste stream is prohibited. Contractors shall report the amount of construction debris disposed of by landfill, and construction debris diverted from landfill by re-use, or recycling. This does not include material that is placed in receptacles provided by the base recology contract. Report by category (asphalt, drywall, wood, concrete, and metal, mixed) the estimated total waste disposed of, and total diverted from landfill, in tons or pounds.
19.7.2. If required, the Contractor shall submit a Solid Waste Diversion and Disposal Report by the 5th day of each quarter (5 Apr, 5 July, 5 Oct, 5 Jan) for the duration of the project. The report will be submitted to 9 CONS and 9 CES/CEAN. See Attachment 6, Solid Waste Diversion and Disposal Report.
19.7.3. The Contractor is required to turn in scrap metals (copper pipe, copper wire, aluminum and sheet metal) to the 9 CES/CEAN Recycling Program for recycling. The Contractor shall contact the 9 CES/CEAN Recycling Program Manager at (530) 634-3176 to arrange for a scrap metal bin to be delivered to the Contractor's work site. The Contractor shall segregate scrap metals into the scrap metal bin, which shall be removed and replaced by 9 CES/CEAN as required. (for >+15-20 CY of recycling.)
19.8. Beale Green Procurement Program:
19.8.1. The Contractor must comply with the Beale Green Procurement Program which requires purchase of EPA-designated recycled content; Bio-based Products; energy efficient products; Alternatively fueled and fuel efficient vehicles, and alternative vehicle fuels; Non-ozone depleting substances; and elimination/minimization of EPA Priority Chemicals. Products. See the EPA Comprehensive Procurement Guidelines (CPG) List for more information. Upon issuance of each task order TOPR the Government may identify items that may be applicable to the project for the Contractors use. The Contractor must then complete and submit an attached BAFB Green Procurement Tracking Form and/or BAFB Green Procurement Exemption Form to the Contracting Office and 9 CES/CEAN to document compliance with the Green Procurement Program; see Attachments 7 and 8. The Contractor is responsible for identifying items that meet the requirement.
19.9. Environmental Management System:
19.9.1. The Contractor must comply with the Environmental Management System. Personnel will begin by completing EMS General Awareness Training prior to project commencement, so they may accurately identify the environmental aspects related to their daily activities. If personnel have already begun work on BAFB they shall complete the training as soon as feasibly possible. Personnel are responsible for maintaining proof of completion for this training. EMS General Awareness Training can be completed at the Environmental, Safety, and Occupational Health Training Network (ESOHTN). Contact 9 CES/CEAN at (530) 634-2642 with any questions.
19.9.2. Instructions for registering at ESOHTN are listed below:
19.9.2.1. Go to the website: http://esohtn.com and click on "Enter"
19.9.2.2. Click on the title of your Command (ACC).
19.9.2.3. At the welcome page, click on "Enter"
19.9.2.4. At the login screen, locate the box on the right side that is labeled, "Register - New Users."
-- Enter esohtn into the Registration Password box.
-- Click on Create an Account.
19.9.2.5. For the next several screens, enter the information in the boxes as requested.
19.9.2.6. Read the disclaimer and if you agree, click on "I Agree" to complete your registration.
20. CONSTRUCTION SITE MAINTENANCE:
20.1. Contractors may request an area for the storage of trailers, but the request may not be granted. If granted, the contractor will be responsible for all costs associated with the maintenance and utilization of the trailer in accordance with Beale AFB policies.
20.2. Storage Trailers and Boxes. All trailers and boxes shall:
20.2.1. Be free from damage to an acceptable condition.
20.2.2. Ensure proper storage of project materials/equipment.
20.2.3. Be free from graffiti.
20.2.4. Be neat and clean in appearance.
20.2.5. All sides of storage trailers/boxes shall have professionally manufactured applicable warning placards mounted for each HAZMAT stored.
20.2.6. All storage trailer/box shall have a 5” x 7” Contractor Identification Placard in a weatherproof holder affixed to the right entrance door indicating:
20.2.6.1. Contractor’s Name.
20.2.6.2. Contract and Task Order Number.
20.2.6.3. Project Number and Title.
20.2.6.4. Contracting Office Point of Contact.
20.2.7. Storage of materials and debris under trailers is prohibited.
20.2.8. All storage trailers/boxes shall be removed from the worksite prior to the final inspection date.
20.3. Laydown/Bulk/Stockpile Storage:
20.3.1. All equipment materials shall be stored on pallets, dunnage and racks as appropriate, and shall not be stored directly on the ground at any time.
20.3.2. All materials sensitive to sunlight shall be covered at all times.
20.3.3. All loose or stockpile material, to include excavated earthworks staged for screening and re-utilization shall be fully covered by tarpaulins and properly staked against winds. Active stock piles will be covered in the same manner at the end of each business day.
20.3.4. Contractor shall enclose the lay-down area with fencing appropriate for the task order. Contractor’s lay-down area shall also be screened from view.
20.4. Refuse / Solid Waste Disposal:
20.4.1. All solid waste materials generated by any work under this contract performed on a Government installation shall be handled, transported, stored, and disposed of by the Contractor and by his/her subcontractors at any time in accordance with these specifications, all applicable Federal, state, or local laws, applicable AFI’s and UFC’s, ordinances, regulations, court orders, or other types of rules or rulings having the same effect of law.
20.4.2. Contractor shall remove and dispose of off-base, in compliance with all federal, state, local, and Beale AFB ordinances, all trash, debris, refuse, and etc., as stated above.
20.4.3. Contractor shall not use installation dumpsters or recycle containers for construction debris or waste.
20.4.4. Contractor shall either include dumpsters as a line item in each task order proposal or, for projects generating small quantities of debris, remove the debris from the job site and dispose of off-base. For Contractor-supplied dumpsters, the Contractor shall post signs on each dumpster stating "(Contractor Name) CONTRACTOR DUMPSTER" and "NOT FOR PUBLIC USE."
20.4.5. Contractor shall immediately clean up any and all spillage from equipment, material, supply, vehicle, container, and/or dumpster removals and/or deliveries, including mud on tires.
20.4.6. Contractor shall ensure any substance that can fall off delivery/pick-up vehicles is securely covered to prevent spillage.
20.5. Daily Cleanup:
20.5.1. Contractor shall maintain a worksite free from accumulation of debris.
20.5.2. Contractor shall empty trash receptacles on a regular basis throughout the day’s activity to avoid overflow or spillage.
20.5.3. Contractor shall perform daily general sweeping/pick-up of debris prior to close of a day’s worksite activity; empty all trash receptacles into worksite refuse containers; and shall comply with protection of existing Government property.
20.6. Salvageable Materials:
20.6.1. All salvageable material to be reused in the construction work shall be stored for reuse in a suitable location within the work area.
20.6.2. All such items shall be marked so as to be reinstalled in their proper locations.
20.6.3. All salvageable material, not to be used in the construction, shall be reviewed by 9 CES to determine if the material is to be retained by the Government. Materials not retained by 9 CES shall be disposed of by the Contractor.
20.7. Unsalvageable Material:
20.7.1. All unsalvageable material shall become the sole property of the Contractor, unless designated otherwise by the Contracting Officer.
20.7.2. Unsalvageable material shall be promptly removed from the site and disposed of.
20.8. Trash Receptacles:
20.8.1. Worksite barrels/carts used for general daily debris accumulation.
20.8.2. Trash receptacles shall be free from graffiti, and shall have “TRASH” stenciled on opposite sides of the receptacle.
20.8.3. Contractor shall provide a minimum of one (1) trash container for each 10,000 square feet of worksite area.
20.9. Demolition/Bulk Debris:
20.9.1. When required, the Contractor shall provide refuse containers for the large accumulation of demolition waste and other debris.
20.9.2. Hauling of demolition/bulk debris to refuse containers shall comply with protection of existing Government property.
20.9.3. Trucks may be utilized for removal of demolition/bulk debris, but shall not be utilized for demolition/bulk debris accumulation.
20.9.4. Contractor shall empty refuse containers and trucks on a regular basis to avoid overflow, spillage, and remain below tonnage allowances for travel on municipal and base roadways in accordance with current local, state, and federal regulations.
20.10. Refuse Containers:
20.10.1. All refuse containers shall be free from graffiti, and be equipped with a securable tarpaulin or cover (NOTE: The cover shall be in place at all times, except when waste is being deposited or removed).
20.11. Trucking:
20.11.1. Contractor shall remove all loose debris on truck sidewalls prior to leaving the worksite.
20.11.2. Shall be loaded in a manner that shall prevent dropping of materials on roadways per in accordance with current local, state and federal ordinances and regulations.
20.11.3. Contractor shall provide suitable covers/tarpaulins over loads prior to leaving the worksite.
20.11.4. Contractor shall be responsible for any clean up, and liable for any resulting damage from any debris that may fall from trucks/refuse containers.
20.12. Sanitation Facilities:
20.12.1. Contractor shall provide self-contained portable/chemical toilet sanitation facilities, with hand cleansing capabilities and self-closing securable doors, for worksites without restroom facilities available unless otherwise specified by the CO.
20.12.2. Sanitation facilities shall be located in an out-of-view location if practical as approved by the Government representative.
20.12.3. When specified, Contractor personnel may be permitted use of existing Government restroom facilities.
20.12.4. If the restrooms at worksites are under Contractors’ full jurisdictions, then such facilities shall be kept neat and clean.
20.12.5. The Contractor shall not use sanitary facilities for cleaning of work tools or equipment.
21. GROUNDS MAINTENANCE:
21.1. Grass:
21.1.1. Contractor shall maintain all grass that is sectioned off within a work site and is not accessible by grounds maintenance.
21.1.2. Maintain all work sites in a presentable manner that is not accessible by grounds maintenance.
21.1.3. Contractor employees, to include subcontractor employees and deliveries, shall not park any vehicle or equipment on grassed areas, unless otherwise authorized by 9 CES. When authorized, parking on grassed areas shall only be for short-term delivery purposes (to include heavy tools, equipment, construction materials etc.), vehicles shall then be promptly removed.
21.1.4. Tire/ track impressions (ruts) created on wet or soft soils by vehicles and/or equipment operated by the Contractor shall be restored to original state by the end of the project, or as otherwise directed by the CO.
21.2. Trees/Shrubs/Bushes: All trees/shrubs/bushes within a worksite that is not accessible by grounds maintenance shall be maintained during growing seasons, and pruned as directed by the CO.
21.3. Vegetation:
21.3.1. All trees, shrubs, bushes, vegetation beds and grass shall be protected from damage at all times.
21.3.2. During painting and stucco operations, or as otherwise directed, all trees, shrubs and bushes shall be tied and/or bundled, and vegetation beds and grass covered to protect from splatter and or damage.
21.4. Damaged Curbs, Pedestrian Walkways, and Roadways: Contractor shall repair/replace all damaged locations resulting from Contractor operations/negligence, to include subcontractors and deliveries, at no additional cost to the Government.
22. CONSTRUCTION SIGNS:
22.1. All construction sites shall have signs posted that say, “Construction Area—Authorized Personnel Only”, “Hard-Hat Area—Construction in Progress”, and “Detour” (with an arrow), as applicable. Signs that comply with OSHA and ANZI standards shall be made of metal or thick plastic with vinyl letters that can be easily read. INFORMATION, SIGNS, OR DIRECTIONS WILL NOT BE PRINTED ON PAPER. Signs used for indoor renovation projects will be large enough to ensure the hazard is easily identified from a safe distance.
23. BARRIERS AND ENCLOSURES:
23.1.1. All worksites with exterior work, i.e., additions, new parking lots, and window replacement, should have safety fencing around the area to prevent base personnel from entering the site, and for safety.
23.2. Erosion Control Fencing: Contractor shall use silt fencing, hay bales or other best management practice during and after construction activities in accordance with local, state and federal regulations where applicable, to prevent site runoff.
24. NOISE CONTROL:
24.1. The Contractor shall comply with all applicable state, local, and installation laws, ordinances, and regulations relative to noise control.
25. EQUIPMENT ON THE SITE:
25.1. The Contractor shall ensure all occupant equipment that is to remain in place within the area of contract operations is covered and protected against damage or loss. Equipment that is removed in the performance of work shall be stored where directed or reused in work as required by drawings and specifications. Equipment temporarily removed shall be protected, cleaned, and replaced equal to or better than its condition prior to starting work. Security for equipment or material that is to be reused and is removed for temporary storage shall be the sole responsibility of the Contractor.
26. ACCESS ROADS AND TRUCKING:
26.1. The Contractor shall be responsible for cleaning up any materials that fall from vehicles associated with a work site operating under this contract. The Contractor shall be solely responsible for any damage caused by debris falling from Contractor or subcontractor-operated vehicles, equipment, and machinery.
26.2. At the end of each day, the Contractor’s Quality Control Manager / Site Inspector shall inspect for and clear all mud, dirt, debris, foreign objects, or spills of any kind from the Contractor’s operations (including subcontractors and suppliers) on streets and parking lots used as access to the work or staging areas. The Contractor shall ensure all taxiways, runways, parking aprons and hard surfaces in or around the airfield, used to access the work or staging areas, remain clean at all times.
26.3. The Contractor shall provide a temporary stabilized construction entrances and exits at transitions from non-paved to paved areas to adequately remove sediment from vehicle tires.
26.3.1. Entrances and exits shall be constructed in accordance with the Sediment and Storm Water Management Plan Permit drawings.
26.3.2. Contractor shall maintain this entrance to function as designed. Stones shall periodically be rotated or exchanged to ensure vehicle tires are clean when exiting the worksite.
26.3.3. The Contractor shall remove and restore soils at all…
This is the start of the file's text. The full file is on GovTribe.