PART I - THE SCHEDULE

SECTION B

BID SCHEDULE

Contractor shall provide all plant, labor, supervision, equipment, supplies, services and necessary materials to perform all operations in conjunction with Project No. BAEY114444, Paving IDIQ8, at Beale AFB CA, complete and in strict accordance with the terms and conditions of the contract.

BASE YEAR

ITEM
SUPPLIES/SERVICES
BASIS FOR UNIT PRICE
KTR'S BID UNIT PRICE
0001
1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
0002
Same as above
2000-3999 SY
0003
Same as above
4000-5999 SY
0004
Same as above
6000-9999 SY
0005
Same as above
10000 SY & up
0006
1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
0007
Same as above
2000-3999 SY
0008
Same as above
4000-5999 SY
0009
Same as above
6000-9999 SY
0010
Same as above
10000 SY & up
0011
2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
0012
Same as above
2000-3999 SY
0013
Same as above
4000-5999 SY
0014
Same as above
6000 SY & up
0015
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
6000 SY & up
0016
3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
0017
Same as above
2000-3999 SY
0018
Same as above
4000-5999 SY
0019
Same as above
6000 SY & up
0020
Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work.
2000-5000 SY
0021
Same as above
5,000-10,000 SY
0022
Same as above
20,001 SY & up
0023
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5,000-10,000 SY
0024
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20,001 SY & up
0025
Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1.
50-299 SY
0026
Same as above
300-799 SY
0027
Same as above
800-1999 SY
0028
Same as above
2000 SY & up
0029
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
2000 SY & up
0030
Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work.
50-500 SY
0031
Same as above
501-2000 SY
0032
Same as above
2001-5000 SY
0033
Same as above
5001 SY & up
0034
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5001 SY & up
0035
Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work.
500-1999 SY
0036
Same as above
2000-3999 SY
0037
Same as above
4000-5999 SY
0038
Same as above
6000 SY & up
0039
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
1000 SY & up
0040
4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
0041
Same as above
500-2000 SY
0042
Same as above
2001 SY & up
0043
6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
0044
Same as above
500-2000 SY
0045
Same as above
2001 SY & up
0046
6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work.
15 Tons & up
0047
Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work.
45-199 Tons
0048
Same as above
200-1000 Tons
0049
Same as above
1001-2500 Tons
0050
Same as above
2501 Tons & up
0051
Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work.
4 - 20 CY
0052
Same as above
20-100 CY
0053
Same as above
101 CY & up
0054
Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work.
500-2500 SY
0055
Same as above
2501-6000 SY
0056
Same as above
6001 SY & up
0057
Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work.
10 - 80 CY
0058
Same as above
81 CY & up
0059
Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work.
20 - 100 CY
0060
Same as above
100 CY & up
0061
Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work.
3500-6999 LF
0062
Same as above
7000-19999 LF
0063
Same as above
20000 LF & up
0064
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20000 LF & up
0065
2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
0066
4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
0067
12" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
0068
18" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
0069
24" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
0070
Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits.
EA
0071
Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims.
EA
0072
12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
0073
24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
0074
Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier.
1000-5000 SF
0075
Same as above
5001-20,000 SF
0076
Same as above
20,001 SF & up
0077
Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
25-99 LF
0078
Same as above
100 LF & up
0079
Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
50-99 LF
0080
Same as above
100 - 499 LF
0081
Same as above
500 LF & up
0082
Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing.
200-999 SF
0083
Same as above
1000 SF & up
0084
Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing.
100-499 SF
0085
Same as above
500 SF & up
0086
Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal.
100-499 SF
0087
Same as above
500 SF & up
0088
Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal.
200-499 SF
0089
Same as above
500 SF & up
0090
Remove concrete footings including rebar, hauling and disposal.
10 CY & up
0091
Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control
24-99 SF
0092
Same as above
100 SF & up
0093
Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster)
1000-15,000 LF (incl gaps)
0094
Same as above
15,001LF & up (incl gaps)
0095
Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control
1000-15,000 LF
0096
Same as above
15,001LF & up
0097
Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control
1000-15,000 LF
0098
Same as above
15,001LF & up
0099
Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required.
50-300 SF
0100
Same as above
301 SF & up
0101
Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required.
EA
0102
Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control.
1 - 4.99 Miles
0103
Same as above
5 Miles & up
0104
Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control.
100 - 500 EA
0105
Same as above
501-2000 EA
0106
Same as above
2001 EA & up
0107
Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic.
1/2 Day
0108
Same as above
Day
0109
Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below.
EA- One Per Delivery Order
0110
Fee for mobilization to any location on base for each delivery order. See notes below.
EA
0111
Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
0112
Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
15,000 SF & up
0113
Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
40,000 SF & up
0114
Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
0115
Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
20,000 LF & up
0116
Same as above
5000 LF & Up
0117
Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base.
20,000 SY & up
0118
Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed.
100-2000 SF
0119
Same as above
2001 SF & up
0120
Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed.
10 -100 SF
0121
Same as above
101 SF & up
0122
Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work.
10 EA & Up

NOTES:

1. Each Delivery Order will be at least $5000.

2. No item will be ordered by itself, therefore each DO will include at least two items.

3. All items include all associated work such as layout, site preparation, materials, equipment, labor, submittals, coordination, dig permit, cones & barricades for traffic control, basic traffic plan, security access for employees and vehicles via Wheatland Gate, clean-up and disposal IAW the specs.

4. The Contractor may schedule work in order to combine work from separate delivery orders such that they may be done at the same time or consecutively.

5. Unit Prices are the cost per unit in the listed quantity range for the respective item.

6. Quantities listed indicate in-place quantities, thicknesses (compacted), square yards, cubic yards, and so forth.

OPTION YEAR 1

ITEM
SUPPLIES/SERVICES
BASIS FOR UNIT PRICE
KTR'S BID UNIT PRICE
1001
1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
1002
Same as above
2000-3999 SY
1003
Same as above
4000-5999 SY
1004
Same as above
6000-9999 SY
1005
Same as above
10000 SY & up
1006
1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
1007
Same as above
2000-3999 SY
1008
Same as above
4000-5999 SY
1009
Same as above
6000-9999 SY
1010
Same as above
10000 SY & up
1011
2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
1012
Same as above
2000-3999 SY
1013
Same as above
4000-5999 SY
1014
Same as above
6000 SY & up
1015
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
6000 SY & up
1016
3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
1017
Same as above
2000-3999 SY
1018
Same as above
4000-5999 SY
1019
Same as above
6000 SY & up
1020
Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work.
2000-5000 SY
1021
Same as above
5,000-10,000 SY
1022
Same as above
20,001 SY & up
1023
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5,000-10,000 SY
1024
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20,001 SY & up
1025
Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1.
50-299 SY
1026
Same as above
300-799 SY
1027
Same as above
800-1999 SY
1028
Same as above
2000 SY & up
1029
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
2000 SY & up
1030
Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work.
50-500 SY
1031
Same as above
501-2000 SY
1032
Same as above
2001-5000 SY
1033
Same as above
5001 SY & up
1034
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5001 SY & up
1035
Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work.
500-1999 SY
1036
Same as above
2000-3999 SY
1037
Same as above
4000-5999 SY
1038
Same as above
6000 SY & up
1039
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
1000 SY & up
1040
4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
1041
Same as above
500-2000 SY
1042
Same as above
2001 SY & up
1043
6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
1044
Same as above
500-2000 SY
1045
Same as above
2001 SY & up
1046
6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work.
15 Tons & up
1047
Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work.
45-199 Tons
1048
Same as above
200-1000 Tons
1049
Same as above
1001-2500 Tons
1050
Same as above
2501 Tons & up
1051
Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work.
4 - 20 CY
1052
Same as above
20-100 CY
1053
Same as above
101 CY & up
1054
Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work.
500-2500 SY
1055
Same as above
2501-6000 SY
1056
Same as above
6001 SY & up
1057
Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work.
10 - 80 CY
1058
Same as above
81 CY & up
1059
Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work.
20 - 100 CY
1060
Same as above
100 CY & up
1061
Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work.
3500-6999 LF
1062
Same as above
7000-19999 LF
1063
Same as above
20000 LF & up
1064
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20000 LF & up
1065
2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
1066
4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
1067
12" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
1068
18" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
1069
24" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
1070
Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits.
EA
1071
Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims.
EA
1072
12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
1073
24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
1074
Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier.
1000-5000 SF
1075
Same as above
5001-20,000 SF
1076
Same as above
20,001 SF & up
1077
Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
25-99 LF
1078
Same as above
100 LF & up
1079
Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
50-99 LF
1080
Same as above
100 - 499 LF
1081
Same as above
500 LF & up
1082
Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing.
200-999 SF
1083
Same as above
1000 SF & up
1084
Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing.
100-499 SF
1085
Same as above
500 SF & up
1086
Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal.
100-499 SF
1087
Same as above
500 SF & up
1088
Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal.
200-499 SF
1089
Same as above
500 SF & up
1090
Remove concrete footings including rebar, hauling and disposal.
10 CY & up
1091
Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control
24-99 SF
1092
Same as above
100 SF & up
1093
Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster)
1000-15,000 LF (incl gaps)
1094
Same as above
15,001LF & up (incl gaps)
1095
Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control
1000-15,000 LF
1096
Same as above
15,001LF & up
1097
Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control
1000-15,000 LF
1098
Same as above
15,001LF & up
1099
Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required.
50-300 SF
1100
Same as above
301 SF & up
1101
Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required.
EA
1102
Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control.
1 - 4.99 Miles
1103
Same as above
5 Miles & up
1104
Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control.
100 - 500 EA
1105
Same as above
501-2000 EA
1106
Same as above
2001 EA & up
1107
Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic.
1/2 Day
1108
Same as above
Day
1109
Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below.
EA- One Per Delivery Order
1110
Fee for mobilization to any location on base for each delivery order. See notes below.
EA
1111
Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
1112
Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
15,000 SF & up
1113
Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
40,000 SF & up
1114
Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
1115
Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
20,000 LF & up
1116
Same as above
5000 LF & Up
1117
Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base.
20,000 SY & up
1118
Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed.
100-2000 SF
1119
Same as above
2001 SF & up
1120
Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed.
10 -100 SF
1121
Same as above
101 SF & up
1122
Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work.
10 EA & Up

See Notes for Base Year above.

OPTION YEAR 2

ITEM
SUPPLIES/SERVICES
BASIS FOR UNIT PRICE
KTR'S BID UNIT PRICE
2001
1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
2002
Same as above
2000-3999 SY
2003
Same as above
4000-5999 SY
2004
Same as above
6000-9999 SY
2005
Same as above
10000 SY & up
2006
1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
2007
Same as above
2000-3999 SY
2008
Same as above
4000-5999 SY
2009
Same as above
6000-9999 SY
2010
Same as above
10000 SY & up
2011
2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
2012
Same as above
2000-3999 SY
2013
Same as above
4000-5999 SY
2014
Same as above
6000 SY & up
2015
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
6000 SY & up
2016
3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
2017
Same as above
2000-3999 SY
2018
Same as above
4000-5999 SY
2019
Same as above
6000 SY & up
2020
Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work.
2000-5000 SY
2021
Same as above
5,000-10,000 SY
2022
Same as above
20,001 SY & up
2023
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5,000-10,000 SY
2024
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20,001 SY & up
2025
Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1.
50-299 SY
2026
Same as above
300-799 SY
2027
Same as above
800-1999 SY
2028
Same as above
2000 SY & up
2029
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
2000 SY & up
2030
Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work.
50-500 SY
2031
Same as above
501-2000 SY
2032
Same as above
2001-5000 SY
2033
Same as above
5001 SY & up
2034
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5001 SY & up
2035
Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work.
500-1999 SY
2036
Same as above
2000-3999 SY
2037
Same as above
4000-5999 SY
2038
Same as above
6000 SY & up
2039
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
1000 SY & up
2040
4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
2041
Same as above
500-2000 SY
2042
Same as above
2001 SY & up
2043
6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
2044
Same as above
500-2000 SY
2045
Same as above
2001 SY & up
2046
6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work.
15 Tons & up
2047
Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work.
45-199 Tons
2048
Same as above
200-1000 Tons
2049
Same as above
1001-2500 Tons
2050
Same as above
2501 Tons & up
2051
Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work.
4 - 20 CY
2052
Same as above
20-100 CY
2053
Same as above
101 CY & up
2054
Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work.
500-2500 SY
2055
Same as above
2501-6000 SY
2056
Same as above
6001 SY & up
2057
Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work.
10 - 80 CY
2058
Same as above
81 CY & up
2059
Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work.
20 - 100 CY
2060
Same as above
100 CY & up
2061
Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work.
3500-6999 LF
2062
Same as above
7000-19999 LF
2063
Same as above
20000 LF & up
2064
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20000 LF & up
2065
2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
2066
4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
2067
12" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
2068
18" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
2069
24" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
2070
Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits.
EA
2071
Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims.
EA
2072
12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
2073
24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
2074
Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier.
1000-5000 SF
2075
Same as above
5001-20,000 SF
2076
Same as above
20,001 SF & up
2077
Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
25-99 LF
2078
Same as above
100 LF & up
2079
Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
50-99 LF
2080
Same as above
100 - 499 LF
2081
Same as above
500 LF & up
2082
Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing.
200-999 SF
2083
Same as above
1000 SF & up
2084
Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing.
100-499 SF
2085
Same as above
500 SF & up
2086
Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal.
100-499 SF
2087
Same as above
500 SF & up
2088
Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal.
200-499 SF
2089
Same as above
500 SF & up
2090
Remove concrete footings including rebar, hauling and disposal.
10 CY & up
2091
Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control
24-99 SF
2092
Same as above
100 SF & up
2093
Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster)
1000-15,000 LF (incl gaps)
2094
Same as above
15,001LF & up (incl gaps)
2095
Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control
1000-15,000 LF
2096
Same as above
15,001LF & up
2097
Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control
1000-15,000 LF
2098
Same as above
15,001LF & up
2099
Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required.
50-300 SF
2100
Same as above
301 SF & up
2101
Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required.
EA
2102
Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control.
1 - 4.99 Miles
2103
Same as above
5 Miles & up
2104
Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control.
100 - 500 EA
2105
Same as above
501-2000 EA
2106
Same as above
2001 EA & up
2107
Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic.
1/2 Day
2108
Same as above
Day
2109
Fee for administration, digging permit, notifications, and all coordination for each delivery order - regardless of scope or location. See notes below.
EA- One Per Delivery Order
2110
Fee for mobilization to any location on base for each delivery order. See notes below.
EA
2111
Furnish & place white reflective paint on Runway, including markings, numbers, beads, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
2112
Furnish & place black outline non-reflective paint on Runway around markings or numbers, including layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
15,000 SF & up
2113
Furnish & place yellow reflective paint on airfield taxiways, including 6"wide taxilines, layout, clean-up, and coordination. Work to be performed after hours, on weekends, or when the airfield is closed.
40,000 SF & up
2114
Remove runway rubber deposits from runway concrete surface, including disposal, coordination, test strip, and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
100,000 SF & up
2115
Reseal airfield concrete joints & cracks including removal of old joint materials, refacing joint, backer rod, coordination and clean-up. Work to be performed after hours, on weekends, or when the airfield is closed.
20,000 LF & up
2116
Same as above
5000 LF & Up
2117
Profile Grind concrete street/pavement including removing reflectors and paint, traffic control, hauling and disposal of all waste materials off base.
20,000 SY & up
2118
Completely remove paint on airfield concrete pavement such as 4 to 6-inch wide yellow taxi lines, including hazardous material testing, disposal of all waste, and all associated work. Work to be performed after hours, on weekends, or when the airfield is closed.
100-2000 SF
2119
Same as above
2001 SF & up
2120
Repair spalls in airfield concrete including saw-cutting outside perimeter of spall, jack-hammering to remove failed concrete, disposal of all debris, epoxy concrete and binder, forming new joint and sealant. Work to be performed after hours, on weekends, or when the airfield is closed.
10 -100 SF
2121
Same as above
101 SF & up
2122
Install galvanized steel Bollards IAW plans including 2 footings, 2 sleeves, reflective tape, cable, 2 padlocks, powdercoat finish, 6”deep x20”wide concrete band, traffic control barricades and signs, and all associated work.
10 EA & Up

OPTION YEAR 3

ITEM
SUPPLIES/SERVICES
BASIS FOR UNIT PRICE
KTR'S BID UNIT PRICE
3001
1” thick Asphalt Concrete overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
3002
Same as above
2000-3999 SY
3003
Same as above
4000-5999 SY
3004
Same as above
6000-9999 SY
3005
Same as above
10000 SY & up
3006
1-1/2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
3007
Same as above
2000-3999 SY
3008
Same as above
4000-5999 SY
3009
Same as above
6000-9999 SY
3010
Same as above
10000 SY & up
3011
2” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
3012
Same as above
2000-3999 SY
3013
Same as above
4000-5999 SY
3014
Same as above
6000 SY & up
3015
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
6000 SY & up
3016
3” thick Asphalt Concrete on base course and/or overlay including tack coat, removal and spraying of weeds with herbicide, removal and disposal of reflectors, removal of debris, placing and removal of temporary reflectors (floppies), cones and barricades for traffic control, basic traffic plan, and all incidental work.
500-1999 SY
3017
Same as above
2000-3999 SY
3018
Same as above
4000-5999 SY
3019
Same as above
6000 SY & up
3020
Type I Slurry Seal in accordance with CalTrans specifications, including: cleaning; preparation; removal and spraying of weeds; traffic control using cones, signs and barricades; pneumatic tire roller compaction; and all associated work.
2000-5000 SY
3021
Same as above
5,000-10,000 SY
3022
Same as above
20,001 SY & up
3023
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5,000-10,000 SY
3024
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20,001 SY & up
3025
Repair/Patch AC Pavement per specs Section 02200-3.4, multiple locations (at least 1 SY ea), including sawcutting, excavation, disposal, layout, aggregate base, and all associated work as listed in item 1.
50-299 SY
3026
Same as above
300-799 SY
3027
Same as above
800-1999 SY
3028
Same as above
2000 SY & up
3029
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
2000 SY & up
3030
Remove existing asphalt concrete by grinding, 4’ minimum width, 2” maximum depth, including hauling and disposal off base and all associated work.
50-500 SY
3031
Same as above
501-2000 SY
3032
Same as above
2001-5000 SY
3033
Same as above
5001 SY & up
3034
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
5001 SY & up
3035
Furnish and place paving fabric for AC overlay IAW CalTrans Specs and manufacturer's recommendations, including cleaning and prep, tack coat, cones and barricades for traffic control, and all associated work.
500-1999 SY
3036
Same as above
2000-3999 SY
3037
Same as above
4000-5999 SY
3038
Same as above
6000 SY & up
3039
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
1000 SY & up
3040
4” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
3041
Same as above
500-2000 SY
3042
Same as above
2001 SY & up
3043
6” thk AB course including layout, subgrade prep, spreading, grading, watering, and compaction.
100-499 SY
3044
Same as above
500-2000 SY
3045
Same as above
2001 SY & up
3046
6” thk layer drain rock course (1"-2 1/2" crushed) including all associated work.
15 Tons & up
3047
Furnish & place AB shoulder backing including grading, compacting, cones, barricades, working around signs and delineators, and all associated work.
45-199 Tons
3048
Same as above
200-1000 Tons
3049
Same as above
1001-2500 Tons
3050
Same as above
2501 Tons & up
3051
Trenching for pipe or culverts in gravel or soil areas including backfill (in such a manner as to protect pipe), 90% compaction, restoration, and all associated work.
4 - 20 CY
3052
Same as above
20-100 CY
3053
Same as above
101 CY & up
3054
Prepare, grade, water, compact (90%) existing gravel or ground, for paving, slab or gravel lot, 6" max. cut and/or fill, including all associated work.
500-2500 SY
3055
Same as above
2501-6000 SY
3056
Same as above
6001 SY & up
3057
Load gravel or earth from pile at Beale AFB, haul (8 miles round trip max), place and compact ("fill"), including removal of surface rocks larger than 2", and all associated work.
10 - 80 CY
3058
Same as above
81 CY & up
3059
Excavate existing gravel or ground ("cut"), load, haul (8 miles round trip max), and stock pile at designated location at Beale AFB, including removal of surface rocks larger than 2", and all associated work.
20 - 100 CY
3060
Same as above
100 CY & up
3061
Crack or Joint Sealing in AC or Concrete Road - including air blast cleaning, burning or removal of weeds, measurement of daily lineal footage, and all associated work.
3500-6999 LF
3062
Same as above
7000-19999 LF
3063
Same as above
20000 LF & up
3064
Same as above item to be performed on airfield shoulders after hours, on weekends, or when airfield is closed.
20000 LF & up
3065
2" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
3066
4" PVC sch 40 pipe including sand bedding (2"min around pipe), adapters and connections to existing water main, not including trenching & backfill.
100 LF & up
3067
12" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
3068
18" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
3069
24" CSP x 16 ga including couplings and connections, not including trenching & backfill.
20 LF & up
3070
Valve/utility box, (Christy B3 or approved equal) including lid, 12" extension, earthwork and connection to two conduits.
EA
3071
Raising of valve box, utility box, or manhole frame & cover 1" to 3" as req'd for AC overlay, including concrete grade rings and/or shims.
EA
3072
12" square or round drain box (Christy V1, V9, or approved equal) including cast iron grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
3073
24" square catch basin (Christy U22 or approved equal) including cast iron traffic grate, 12" extension, excavation, backfill, compaction, and connection to two pipes.
EA
3074
Hydroseeding, Native Erosion Control Seed Mix (brome, lupine, clover) 1 lb per 1000 SF (9#/1000SY), including wood fiber and tackifier.
1000-5000 SF
3075
Same as above
5001-20,000 SF
3076
Same as above
20,001 SF & up
3077
Construct 6”X14” Concrete Vertical Curb including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
25-99 LF
3078
Same as above
100 LF & up
3079
Construct 6"high X 36”wide Concrete Curb & Gutter, vertical or rolled, including forms, cure, joints, excavation up to 12" deep, backfill behind curb with excavated mat'l, layout, and all associated work.
50-99 LF
3080
Same as above
100 - 499 LF
3081
Same as above
500 LF & up
3082
Construct concrete sidewalk or patio, 4” thick on 2” sand base, including layout, excavation up to 12" deep, subgrade prep, formwork, joints, finishing, and curing.
200-999 SF
3083
Same as above
1000 SF & up
3084
Construct concrete slab, 6” thick on 4” aggregate base with 6 mil plastic vapor barrier, including layout, excavation up to 12" deep, formwork, subgrade prep, finishing, joints, and curing.
100-499 SF
3085
Same as above
500 SF & up
3086
Remove concrete slabs/sidewalk 3"-5" thick, including hauling and disposal.
100-499 SF
3087
Same as above
500 SF & up
3088
Remove concrete slabs 6"-8" thick or curb & gutter (curb w/ 2.5 ft gutter = 3 SF/LF) including hauling and disposal.
200-499 SF
3089
Same as above
500 SF & up
3090
Remove concrete footings including rebar, hauling and disposal.
10 CY & up
3091
Pavement markings such as crosswalks and stop lines using heated thermoplastic material including layout and traffic control
24-99 SF
3092
Same as above
100 SF & up
3093
Paint broken centerline-- thermoplastic, 4" wide yellow, including layout, cones and traffic control (7' dashes w/17' gaps <35 mph zones; 12' gaps w/ 36' gaps 35 mph zones or faster)
1000-15,000 LF (incl gaps)
3094
Same as above
15,001LF & up (incl gaps)
3095
Paint double yellow centerlines-- thermoplastic, two 4" yellow lines w/4" black line in middle including layout, cones and traffic control
1000-15,000 LF
3096
Same as above
15,001LF & up
3097
Paint fogline-- thermoplastic, 4" white, including layout, cones and traffic control
1000-15,000 LF
3098
Same as above
15,001LF & up
3099
Paint parking lot striping, such as parking spaces with 4" white lines, non-reflectorized, including layout, cones and barricades as required.
50-300 SF
3100
Same as above
301 SF & up
3101
Paint complete Handicap parking stall, non-reflectorized (not thermoplastic), including layout, cones and barricades as required.
EA
3102
Paint Road Striping, thermoplastic, including two foglines and centerline (double or dashed), layout, cones and traffic control.
1 - 4.99 Miles
3103
Same as above
5 Miles & up
3104
Reflective pavement markers (Ray-O-Lite or approved equal)-- 4" square, one-way or two-way, white or yellow and/or Non-reflective pavement markers/ "buttons" (Diamondback plastic or approved equal)-- 4" round, white or yellow. Includes layout, cones and traffic control.
100 - 500 EA
3105
Same as above
501-2000 EA
3106
Same as above
2001 EA & up
3107
Traffic Control with 2 flag persons, cones, barricades, and signs as req'd to keep two-way traffic open. Note that barricades, detour signs, closed signs, and cones shall be included with respective items of work when roads or lots are closed to traffic.
1/2 Day
3108
Same as above
Day
3109

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to Paving IDIQ FA4686-12-R-0006, newest first.
File Type Posted
Paving IDIQ RFIs Answers.doc DOC document
Attch 1 - Basic Statement of Work Revised.doc DOC document
Amendment 3 to Specs.pdf PDF
Spec Ammendment.pdf PDF
Paving IDIQ Pre-Bid Conference Meeting Attendance.pdf PDF
Request for Entry_AG —
FA4686-12-R-0006 Paving IDIQ Solicitation.doc DOC document
Attch 6 - AF 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attch 1 - Basic Statement of Work.doc DOC document
Attch 4 - Wage Determinations.doc DOC document
Attch 2 - Seed Project SOW.doc DOC document
AF813.pdf PDF
Attch 5 - Past Performance Questionnaire.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .