Attch 2 - Seed Project SOW.doc

DOC document 31 KB Posted

Attached to
Paving IDIQ FA4686-12-R-0006 Federal contract opportunity
Solicitation number
FA4686-12-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Seed Project Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ FA4686-12-R-0006, newest first.
File Type Posted
Paving IDIQ RFIs Answers.doc DOC document
Attch 1 - Basic Statement of Work Revised.doc DOC document
Amendment 3 to Specs.pdf PDF
Spec Ammendment.pdf PDF
Paving IDIQ Pre-Bid Conference Meeting Attendance.pdf PDF
Request for Entry_AG —
FA4686-12-R-0006 Paving IDIQ Solicitation.doc DOC document
Attch 6 - AF 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attch 1 - Basic Statement of Work.doc DOC document
Attch 4 - Wage Determinations.doc DOC document
Attch 3 - Bid Schedule —
AF813.pdf PDF
Attch 5 - Past Performance Questionnaire.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # : FA4686-12-R-0006

Statement of Work for: Remove Rubber & Paint, Restripe Airfield, BAEY 040073

I. GENERAL SCOPE:

A. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to remove airfield rubber and paint, and paint airfield markings and lines at Beale AFB. Work shall be accomplished as listed below in accordance with the contract documents. Location is shown on attached plans and also will be indicated in the field by Beale AFB personnel to the contractor.

B. All work on the airfield must occur after hours (12am to 8am M-F), on weekends, and/or when there is no flying scheduled. Per the specifications, the contractor must closely coordinate with airfield management and plan his schedule accordingly. The contractor must attend a Flightline Driving course given by Beale personnel before driving on the airfield. The contractor must be escorted in restricted areas designated by red lines.

C. All contractor vehicles must enter the base via the Wheatland Gate and be subject to inspection. All contractor personnel must obtain base passes.

D. A performance period later given should be ample time to complete this project.

II. WORK ITEMS:

1. Repair/Patch AC Pavement on airfield shoulders after hours, multiple locations, including sawcutting, excavation, disposal, layout, aggregate base, and all associated work and coordination- approximately 1000 SY, item 0029.

2. Fee for administration, coordination, dig permit, for this delivery order (QTY 1, Item # 0109).

3. Mobilize equipment on low bed trucks (QTY 4 each, Item # 0110).

4. Furnish & place white reflective paint on airfield after hours, including runway markings, numbers, beads, traffic lanes, layout, clean-up, and all associated work and coordination- approximately 25,000 SF, item 0111.

5. Furnish & place yellow reflective paint on airfield after hours for taxiway lines, including beads, layout, clean-up, and all associated work and coordination- approximately 50,000 SF, item 0113.

6. Remove runway rubber deposits from airfield concrete surfaces after hours, including disposal, coordination, testing, and clean-up., and all associated work and coordination- approximately 124,000 SF, item 0114.

7. Remove paint markings and lines from airfield concrete surfaces after hours, including disposal, coordination, testing, and clean-up., and all associated work and coordination- approximately 2500 SF, item 0126.