Attachment_5_-_Drawings_Repair_Interior_Finishes_Bldg._390.pdf

PDF 1021 KB Posted

Attached to
Repair Interior Finishes Bldg. 390 Federal contract opportunity
Solicitation number
FA466419BA009
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

PASSENGER HOLDING ROOM

MECHANICAL

ELEC

41'-4 1/2" 34'-1 1/4" 47'-1 1/4" 53'-0" 45'-5" 51'-0" 29'-0"

301'-0"

11'-8" 7'-1" 67'-11 1/2" 6'-10" 83'-1 1/2" 7'-2" 12'-0" 17'-2 1/2" 10'-10" 18'-1 1/2" 5'-6 1/2"

6'-0"

6'-0"

INSTALL 6 NEW RECEPTACLES

INSTALL PVC WALL PANELS

BREAKROOM

HALL

FOYER

80ROOMS 80, 115, 126, 135 and 161

FOOD

SERVING

1136469491C Typewritten Text Drawing #1

1136469491C Typewritten Text Install wall protector and paint up to 8' Install six (6) outlets indicated on map

1136469491C Polygonal Line

1136469491C Polygonal Line

1136469491C Line

1136469491C Line

1136469491C Typewritten Text Install gypsum board

1136469491C Line

1136469491C Line

1136469491C Line

Typewritten Text Drawing #2

1136469491C Polygonal Line

1136469491C Polygonal Line

Polygonal Line

Drawing #2a

1136469491C Polygonal Line

1136469491C Polygonal Line

1136469491C Polygonal Line

1136469491C Polygonal Line

1136469491C Typewritten Text Install 6 receptacles

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Typewritten Text 48"

1136469491C Typewritten Text Top Cap

1136469491C Typewritten Text Corner Guards

1136469491C Typewritten Text End Guards

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Line

1136469491C Typewritten Text Drawing #3

1136469491C Typewritten Text No wall covering to go on outside corners

Drawing #4

1136469491C Typewritten Text Contractor responsible to place wall protector and paint behind vending machines.

Drawing #5

1136469491C Typewritten Text Contractor shall place wall protector under approximately 83' x 32" desk on West side of building.

1136469491C Line

1136469491C Typewritten Text Contractor shall paint above desk to ceiling without removing artwork.

1136469491C Line

1136469491C Line

3. Drawings - Bldg 390
1. 390 Drawing #1
1. 390 Drawing #2.pdf
1. 390 Drawing #2a.pdf
1. 390 Drawing #3
1. 390 Drawing #4
1. 390 Drawing #5
3. Specifications BLDG 390
01 11 00
SUMMARY OF WORK
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 AF Form 3064, Contract Progress Schedule And AF Form 3065, Contract
1.4 Work Plan
1.5 AF Form 103 Work Clearance Request
1.6 PROPERTY CONTROL RECORDS
1.7 OCCUPANCY OF PREMISES
1.8 EXISTING WORK
1.9 LOCATION OF UNDERGROUND UTILITIES
1.9.1 Notification Prior to Excavation
PART 2 PRODUCTS
PART 3 EXECUTION
01 30 00
ADMINISTRATIVE REQUIREMENTS
01 30 00 - ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 COLOR BOARDS FOR AIR FORCE PROJECTS
1.4 MINIMUM INSURANCE REQUIREMENTS
1.5 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS
1.6 SUPERVISION
1.6.1 Minimum Communication Requirements
1.6.2 Superintendent Qualifications
1.6.2.1 Duties

1.6.3 Non-Compliance Actions

1.7 PRECONSTRUCTION
1.8 PARTNERING
1.8.1 Formal Partnering

1.9 ELECTRONIC MAIL E-MAIL ADDRESS

01 33 00
SUBMITTAL PROCEDURES
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions SD
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved G
1.3.2 For Information Only
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Submittal Format
1.4.2.1 Format of SD-01 Preconstruction Submittals
1.4.2.2 Format for SD-02 Shop Drawings
1.4.2.2.1 Drawing Identification
1.4.2.3 Format of SD-03 Product Data
1.4.2.3.1 Product Information
1.4.2.3.2 Standards
1.4.2.3.3 Data Submission
1.4.2.4 Format of SD-04 Samples
1.4.2.4.1 Sample Characteristics
1.4.2.4.2 Sample Incorporation
1.4.2.4.3 Comparison Sample
1.4.2.5 Format of SD-05 Design Data
1.4.2.6 Format of SD-06 Test Reports
1.4.2.7 Format of SD-07 Certificates
1.4.2.8 Format of SD-08 Manufacturer's Instructions
1.4.2.8.1 Standards
1.4.2.9 Format of SD-09 Manufacturer's Field Reports
1.4.2.10 Format of SD-10 Operation and Maintenance Data O&M
1.4.2.11 Format of SD-11 Closeout Submittals
1.4.3 Source Drawings for Shop Drawings
1.4.3.1 Source Drawings
1.4.3.2 Terms and Conditions
1.5 QUANTITY OF SUBMITTALS
1.5.1 Number of SD-01 Preconstruction Submittal Copies
1.5.2 Number of SD-04 Samples
1.6 INFORMATION ONLY SUBMITTALS
1.7 PROJECT SUBMITTAL REGISTER
1.7.1 Submittal Management
1.7.2 Preconstruction Use of Submittal Register
1.7.3 Contractor Use of Submittal Register
1.7.4 Approving Authority Use of Submittal Register
1.7.5 Action Codes
1.7.6 Delivery of Copies
1.8 VARIATIONS
1.8.1 Considering Variations
1.8.2 Proposing Variations
1.8.3 Warranting that Variations are Compatible
1.8.4 Review Schedule Extension
1.9 SCHEDULING
1.10 GOVERNMENT APPROVING AUTHORITY
1.10.1 Review Notations
1.11 DISAPPROVED SUBMITTALS
1.12 APPROVED SUBMITTALS
1.13 APPROVED SAMPLES
PART 2 PRODUCTS
PART 3 EXECUTION
01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Competent Person CP
1.2.2 Competent Person, Confined Space
1.2.3 Competent Person, Cranes and Rigging
1.2.4 Competent Person, Excavation/Trenching
1.2.5 Competent Person, Fall Protection
1.2.6 Competent Person, Scaffolding
1.2.7 Competent Person CP Trainer
1.2.8 High Risk Activities
1.2.9 High Visibility Accident
1.2.10 Load Handling Equipment LHE
1.2.11 Medical Treatment
1.2.12 Near Miss
1.2.13 Operating Envelope
1.2.14 Qualified Person QP
1.2.15 Qualified Person, Fall Protection QP for FP
1.2.16 USACE Property and Equipment
1.2.17 Load Handling Equipment LHE Accident or Load Handling Equipment
1.3 SUBMITTALS
1.4 REGULATORY REQUIREMENTS
1.5 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer SSHO
1.5.1.1.1 Additional Site Safety and Health Officer SSHO Requirements and
1.5.1.2 Competent Person Qualifications
1.5.1.2.1 Competent Person for Confined Space Entry
1.5.1.2.2 Competent Person for Scaffolding
1.5.1.2.3 Competent Person for Fall Protection

1.5.1.3 Qualified Trainer Requirements

1.5.2 Personnel Duties
1.5.2.1 Duties of the Site Safety and Health Officer SSHO
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
1.5.3.2 Safety Meetings
1.6 ACCIDENT PREVENTION PLAN APP
1.6.1 Names and Qualifications
1.6.2 Plans
1.6.2.1 Confined Space Entry Plan
1.6.2.2 Multi-Purpose Machines, Material Handling Equipment, and
1.6.2.3 Fall Protection and Prevention FP&P Plan
1.6.2.4 Rescue and Evacuation Plan
1.6.2.5 Hazardous Energy Control Program HECP
1.6.2.6 Site Demolition Plan
1.7 ACTIVITY HAZARD ANALYSIS AHA
1.7.1 AHA Management
1.7.2 AHA Signature Log
1.8 DISPLAY OF SAFETY INFORMATION
1.8.1 Safety Bulletin Board
1.8.2 Safety and Occupational Health SOH Deficiency Tracking System
1.9 SITE SAFETY REFERENCE MATERIALS
1.10 EMERGENCY MEDICAL TREATMENT
1.11 NOTIFICATIONS and REPORTS
1.11.1 Mishap Notification
1.11.2 Accident Reports
1.11.3 LHE Inspection Reports
1.11.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and
1.12 HOT WORK
1.12.1 Permit and Personnel Requirements
1.12.2 Work Around Flammable Materials
1.13 CONFINED SPACE ENTRY REQUIREMENTS
1.13.1 Entry Procedures
1.13.2 Forced Air Ventilation
1.13.3 Sewer Wet Wells
1.13.4 Rescue Procedures and Coordination with Local Emergency Responders

1.14 SEVERE STORM PLAN

PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Worksite Communication
3.1.2 Hazardous Material Exclusions
3.1.3 Unforeseen Hazardous Material
3.2 UTILITY OUTAGE REQUIREMENTS
3.3 OUTAGE COORDINATION MEETING
3.4 CONTROL OF HAZARDOUS ENERGY LOCKOUTTAGOUT
3.4.1 Safety Preparatory Inspection Coordination Meeting with the
3.4.2 Lockout/Tagout Isolation
3.4.3 Lockout/Tagout Removal
3.5 FALL PROTECTION PROGRAM
3.5.1 Training
3.5.2 Fall Protection Equipment and Systems
3.5.2.1 Additional Personal Fall Protection
3.5.2.2 Personal Fall Protection Harnesses
3.5.3 Fall Protection for Roofing Work
3.5.4 Horizontal Lifelines HLL
3.5.5 Guardrails and Safety Nets
3.5.6 Rescue and Evacuation Plan and Procedures
3.6 WORK PLATFORMS
3.6.1 Scaffolding
3.6.2 Elevated Aerial Work Platforms AWPs
3.7 EQUIPMENT
3.7.1 Material Handling Equipment MHE
3.7.2 Load Handling Equipment LHE
3.7.3 Machinery and Mechanized Equipment
3.7.4 Base Mounted Drum Hoists
3.7.5 Use of Explosives
3.8 EXCAVATIONS
3.8.1 Utility Locations
3.8.2 Utility Location Verification
3.8.3 Utilities Within and Under Concrete, Bituminous Asphalt, and Other
3.9 ELECTRICAL
3.9.1 Conduct of Electrical Work
3.9.2 Qualifications
3.9.3 Arc Flash
3.9.4 Grounding
3.9.5 Testing
01 78 00
CLOSEOUT SUBMITTALS
01 78 00 - CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 As-Built Drawings
1.1.2 Record Drawings
1.2 SOURCE DRAWING FILES
1.2.1 Terms and Conditions
1.3 SUBMITTALS
1.4 SPARE PARTS DATA
1.5 WARRANTY MANAGEMENT
1.5.1 Warranty Management Plan
1.5.2 Performance Bond
1.5.3 Pre-Warranty Conference
1.5.4 Warranty Tags
PART 2 PRODUCTS
2.1 CERTIFICATION OF EPA DESIGNATED ITEMS
PART 3 EXECUTION
3.1 AS-BUILT DRAWINGS
3.1.1 Markup Guidelines
3.1.2 As-Built Drawings Content
3.2 FINAL APPROVED SHOP DRAWINGS
3.3 Construction Contract Specifications
3.4 OPERATION AND MAINTENANCE MANUALS
3.5 Transfer And Acceptance Of Military Real Property Form DD1354
3.6 CLEANUP
02 41 00
DEMOLITION
02 41 00 - DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
1.2.1.2 Deconstruction
1.2.1.3 Demolition Plan
1.2.1.4 Deconstruction Plan
1.2.2 Demolition
1.2.3 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 AVAILABILITY OF WORK AREAS
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 FOREIGN OBJECT DAMAGE FOD
1.10 RELOCATIONS
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing
3.1.5.1 Temporary Roofing
3.1.5.2 Reroofing
3.1.6 Masonry
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry
3.1.11 Carpet
3.1.12 Acoustic Ceiling Tile
3.1.13 Airfield Lighting
3.1.14 Patching
3.1.15 Air Conditioning Equipment
3.1.16 Cylinders and Canisters
3.1.17 Locksets on Swinging Doors
3.1.18 Mechanical Equipment and Fixtures
3.1.18.1 Preparation for Storage
3.1.18.2 Piping
3.1.18.3 Ducts
3.1.18.4 Fixtures, Motors and Machines
3.1.19 Electrical Equipment and Fixtures
3.1.19.1 Fixtures
3.1.19.2 Electrical Devices
3.1.19.3 Wiring Ducts or Troughs
3.1.19.4 Conduit and Miscellaneous Items

3.1.20 Elevators and Hoists

3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment
3.3.3 Salvaged Materials and Equipment
3.3.4 Disposal of Ozone Depleting Substance ODS
3.3.4.1 Special Instructions
3.3.4.2 Fire Suppression Containers
3.3.5 Transportation Guidance
3.3.6 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property

3.6 REUSE OF SALVAGED ITEMS

09 29 00
GYPSUM BOARD
09 29 00 - GYPSUM BOARD
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Ceiling and Wall Systems
1.3.1.2 Adhesives and Sealants
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.2 Storage
1.4.3 Handling
1.5 QUALIFICATIONS
1.6 ENVIRONMENTAL REQUIREMENTS
1.7 FIRE RESISTIVE CONSTRUCTION
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Gypsum Board
2.1.1.1 Regular
2.1.1.2 Foil-Backed
2.1.1.3 Type X Special Fire-Resistant
2.1.1.4 Mold Resistant / Anti-Microbial Gypsum
2.1.2 Gypsum Backing Board
2.1.2.1 Regular
2.1.2.2 Foil-Backed
2.1.2.3 Type X Special Fire-Resistant
2.1.3 Regular Water-Resistant Gypsum Backing Board
2.1.3.1 Regular
2.1.3.2 Type X Special Fire-Resistant
2.1.4 Glass Mat Water-Resistant Gypsum Tile Backing Board
2.1.4.1 Regular
2.1.4.2 Type X Special Fire-Resistant
2.1.5 Predecorated Gypsum Board
2.1.6 Cementitious Backer Units
2.1.7 Joint Treatment Materials
2.1.7.1 Embedding Compound
2.1.7.2 Finishing or Topping Compound
2.1.7.3 All-Purpose Compound
2.1.7.4 Setting or Hardening Type Compound
2.1.7.5 Joint Tape
2.1.8 Fasteners
2.1.8.1 Nails
2.1.8.2 Screws
2.1.8.3 Staples
2.1.9 Adhesives
2.1.9.1 Adhesive for Fastening Gypsum Board to Metal Framing
2.1.9.2 Adhesive for Fastening Gypsum Board to Wood Framing
2.1.9.3 Adhesive for Laminating
2.1.10 Gypsum Studs
2.1.11 Shaftwall Liner Panel
2.1.12 Accessories
2.1.13 Asphalt Impregnated Building Felt
2.1.14 Water
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Framing and Furring
3.1.2 Gypsum Board and Framing
3.1.3 Masonry and Concrete Walls
3.1.4 Building Construction Materials
3.2 APPLICATION OF GYPSUM BOARD
3.2.1 Application of Single-Ply Gypsum Board to Wood Framing
3.2.2 Application of Two-Ply Gypsum Board to Wood Framing
3.2.3 Adhesive Nail-On Application to Wood Framing
3.2.4 Semi-Solid Gypsum Board Partitions
3.2.5 Solid Gypsum Board Partitions
3.2.6 Adhesive Application to Interior Masonry or Concrete Walls
3.2.7 Application of Gypsum Board to Steel Framing and Furring
3.2.8 Arches and Bending Radii
3.2.9 Gypsum Board for Wall Tile or Tile Base Applied with Adhesive
3.2.10 Exterior Application
3.2.11 Glass Mat Covered or Fiber Reinforced Gypsum Sheathing
3.2.12 Floating Interior Angles
3.2.13 Control Joints
3.2.14 Application of Foil-Backed Gypsum Board
3.2.15 Application of Predecorated Gypsum Board
3.2.16 Application of Abuse Resistant Gypsum Board
3.3 APPLICATION OF CEMENTITIOUS BACKER UNITS
3.3.1 Application
3.3.2 Joint Treatment
3.4 FINISHING OF GYPSUM BOARD
3.4.1 Uniform Surface
3.4.2 Metal Trim for Predecorated Gypsum Board
3.5 SEALING
3.5.1 Sealing for Glass Mat or Reinforced Gypsum Board Sheathing
3.6 FIRE-RESISTANT ASSEMBLIES
3.7 PATCHING
3.8 SHAFTWALL FRAMING
09 72 00
WALLCOVERINGS
09 72 00 - WALLCOVERINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Fabrics and Wallcoverings
1.3.1.2 Primers and Adhesives
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 WARRANTY
1.7 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 WALLCOVERINGS AND ACCESSORIES
2.1.1 Product Data
2.1.2 Samples
2.1.2.1 Wallcovering
2.1.2.2 Accessories
2.1.2.3 Wallcovering
2.1.2.4 Wallcovering Mockup Panels
2.1.3 Certificates
2.1.4 Manufacturer's Instructions
2.1.5 Operations and Maintenance Data
2.2 VINYL WALLCOVERING
2.3 TEXTILE WALLCOVERING
2.4 CORNER GUARDS
2.5 PRIMER AND ADHESIVE
2.6 COLOR, TEXTURE, AND PATTERN
PART 3 EXECUTION
3.1 EXAMINATION
3.2 SURFACE PREPARATION
3.3 INSTALLATION
3.3.1 Wallcovering
3.3.1.1 Textile Wallcovering

3.3.2 Corner Guards and Wainscot Cap

3.4 CLEAN-UP

09 90 00
PAINTS AND COATINGS
09 90 00 - PAINTS AND COATINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
1.3.1.1 Paints and Coatings
1.4 APPLICATOR'S QUALIFICATIONS
1.4.1 Contractor Qualification
1.5 QUALITY ASSURANCE
1.5.1 Field Samples and Tests
1.5.1.1 Sampling Procedure
1.5.1.2 Testing Procedure

1.5.2 Textured Wall Coating System

1.6 REGULATORY REQUIREMENTS
1.6.1 Environmental Protection
1.6.2 Lead Content
1.6.3 Chromate Content
1.6.4 Asbestos Content
1.6.5 Mercury Content
1.6.6 Silica
1.6.7 Human Carcinogens
1.7 PACKAGING, LABELING, AND STORAGE
1.8 SAFETY AND HEALTH
1.8.1 Safety Methods Used During Coating Application
1.8.2 Toxic Materials
1.9 ENVIRONMENTAL CONDITIONS
1.9.1 Coatings
1.10 COLOR SELECTION
1.11 LOCATION AND SURFACE TYPE TO BE PAINTED
1.11.1 Painting Included
1.11.1.1 Exterior Painting
1.11.1.2 Interior Painting
1.11.2 Painting Excluded
1.11.3 Mechanical and Electrical Painting
1.11.3.1 Fire Extinguishing Sprinkler Systems
1.11.4 MISCELLANEOUS PAINTING
1.11.5 Definitions and Abbreviations
1.11.5.1 Qualification Testing
1.11.5.2 Batch Quality Conformance Testing
1.11.5.3 Coating
1.11.5.4 DFT or dft
1.11.5.5 DSD
1.11.5.6 EPP
1.11.5.7 EXT
1.11.5.8 INT
1.11.5.9 micron / microns
1.11.5.10 mil / mils
1.11.5.11 mm
1.11.5.12 MPI Gloss Levels
1.11.5.13 MPI System Number
1.11.5.14 Paint
1.11.5.15 REX
1.11.5.16 RIN
PART 2 PRODUCTS
2.1 MATERIALS
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
3.2 REPUTTYING AND REGLAZING
3.3 RESEALING OF EXISTING EXTERIOR JOINTS
3.3.1 Surface Condition
3.3.2 Backstops
3.3.3 Primer and Bond Breaker
3.3.4 Ambient Temperature
3.3.5 Exterior Sealant
3.3.6 Cleaning
3.4 SURFACE PREPARATION
3.4.1 Additional Requirements for Preparation of Surfaces With Existing
3.4.2 Existing Coated Surfaces with Minor Defects
3.4.3 Removal of Existing Coatings
3.4.4 Substrate Repair
3.5 PREPARATION OF METAL SURFACES
3.5.1 Existing and New Ferrous Surfaces
3.5.2 Final Ferrous Surface Condition:
3.5.3 Galvanized Surfaces
3.5.4 Non-Ferrous Metallic Surfaces
3.5.5 Terne-Coated Metal Surfaces
3.5.6 Existing Surfaces with a Bituminous or Mastic-Type Coating
3.6 PREPARATION OF CONCRETE AND CEMENTITIOUS SURFACE
3.6.1 Concrete and Masonry
3.6.2 Gypsum Board, Plaster, and Stucco
3.6.3 Existing Asbestos Cement Surfaces
3.7 PREPARATION OF WOOD AND PLYWOOD SURFACES
3.7.1 New , Existing Uncoated, and Existing Coated Plywood and Wood
3.7.2 Wood Floor Surfaces, Natural Finish
3.7.3 Interior Wood Surfaces, Stain Finish
3.7.4 Water Blasting of Existing Coated Wood Surfaces:
3.8 APPLICATION
3.8.1 Coating Application
3.8.2 Mixing and Thinning of Paints
3.8.3 Two-Component Systems
3.8.4 Coating Systems
3.9 COATING SYSTEMS FOR METAL
3.10 COATING SYSTEMS FOR CONCRETE AND CEMENTITIOUS SUBSTRATES
3.11 COATING SYSTEMS FOR WOOD AND PLYWOOD
3.12 PIPING IDENTIFICATION
3.13 INSPECTION AND ACCEPTANCE
3.14 WASTE MANAGEMENT
3.15 PAINT TABLES
3.15.1 Exterior Paint Tables
3.15.2 Interior Paint Tables
26 20 00
INTERIOR DISTRIBUTION SYSTEM
26 20 00 - INTERIOR DISTRIBUTION SYSTEM
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Fuses
1.4.2 Regulatory Requirements
1.4.3 Standard Products
1.4.3.1 Alternative Qualifications
1.4.3.2 Material and Equipment Manufacturing Date
1.5 MAINTENANCE
1.6 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.2 CONDUIT AND FITTINGS
2.2.1 Rigid Metallic Conduit
2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit
2.2.1.2 Rigid Aluminum Conduit
2.2.2 Rigid Nonmetallic Conduit
2.2.3 Intermediate Metal Conduit IMC
2.2.4 Electrical, Zinc-Coated Steel Metallic Tubing EMT
2.2.5 Plastic-Coated Rigid Steel and IMC Conduit
2.2.6 Flexible Metal Conduit
2.2.6.1 Liquid-Tight Flexible Metal Conduit, Steel
2.2.7 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit
2.2.7.1 Fittings for Rigid Metal Conduit and IMC
2.2.7.2 Fittings for EMT
2.2.8 Fittings for Rigid Nonmetallic Conduit
2.2.9 Liquid-Tight Flexible Nonmetallic Conduit
2.3 SURFACE RACEWAY
2.3.1 Surface Metal Raceway
2.3.2 Surface Nonmetallic Raceway
2.4 BUSWAY
2.4.1 Feeder Busways
2.4.2 Plug-In Busways
2.5 CABLE TRAYS
2.5.1 Basket-Type Cable Trays
2.5.2 Trough-Type Cable Trays
2.5.3 Ladder-Type Cable Trays
2.5.4 Channel-Type Cable Trays
2.5.5 Solid Bottom-Type Cable Trays
2.5.6 Cantilever
2.6 OUTLET BOXES AND COVERS
2.6.1 Floor Outlet Boxes
2.6.2 Outlet Boxes for Telecommunications System
2.6.3 Clock Outlet for Use in Other Than Wired Clock System
2.7 CABINETS, JUNCTION BOXES, AND PULL BOXES
2.8 WIRES AND CABLES
2.8.1 Conductors
2.8.1.1 Aluminum Conductors
2.8.1.2 Minimum Conductor Sizes
2.8.2 Color Coding
2.8.2.1 Ground and Neutral Conductors
2.8.2.2 Ungrounded Conductors
2.8.3 Insulation
2.8.4 Bonding Conductors
2.8.4.1 Telecommunications Bonding Backbone TBB
2.8.4.2 Bonding Conductor for Telecommunications
2.8.5 Service Entrance Cables
2.8.6 Nonmetallic Sheathed Cable
2.8.7 Wire and Cable for 400 Hertz Hz Circuits
2.8.8 Metal-Clad Cable
2.8.9 Armored Cable
2.8.10 Mineral-Insulated, Metal-Sheathed Cable
2.8.11 Flat Conductor Cable
2.8.12 Cable Tray Cable or Power Limited Tray Cable
2.8.13 Cord Sets and Power-Supply Cords
2.9 SPLICES AND TERMINATION COMPONENTS
2.10 DEVICE PLATES
2.11 SWITCHES
2.11.1 Toggle Switches
2.11.2 Switch with Red Pilot Handle
2.11.3 Breakers Used as Switches
2.11.4 Disconnect Switches
2.12 FUSES
2.12.1 Fuseholders
2.12.2 Cartridge Fuses, Current Limiting Type Class R
2.12.3 Cartridge Fuses, High-Interrupting Capacity, Current Limiting Type
2.12.4 Cartridge Fuses, Current Limiting Type Class T
2.13 RECEPTACLES
2.13.1 Switched Duplex Receptacles
2.13.2 Weatherproof Receptacles
2.13.3 Ground-Fault Circuit Interrupter Receptacles
2.13.4 Special Purpose Receptacles
2.13.5 Plugs
2.13.6 Tamper-Resistant Receptacles
2.14 PANELBOARDS
2.14.1 Circuit Breakers
2.14.1.1 Circuit Breaker With Ground-Fault Circuit Interrupter
2.14.1.2 Arc-Fault Circuit Interrupters
2.15 LOCKOUT REQUIREMENTS
2.16 GROUNDING AND BONDING EQUIPMENT
2.16.1 Ground Rods
2.16.2 Ground Bus
2.16.3 Telecommunications and CATVGrounding Busbar
2.17 HAZARDOUS LOCATIONS
2.18 MANUFACTURER'S NAMEPLATE
2.19 FIELD FABRICATED NAMEPLATES
2.20 WARNING SIGNS
2.21 FIRESTOPPING MATERIALS
2.22 WIREWAYS
2.23 SURGE PROTECTIVE DEVICES
2.24 FACTORY APPLIED FINISH
2.25 SOURCE QUALITY CONTROL
2.25.1 Transformer Factory Tests
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Underground Service
3.1.2 Overhead Service
3.1.3 Hazardous Locations
3.1.4 Service Entrance Identification
3.1.4.1 Labels
3.1.5 Wiring Methods
3.1.5.1 Pull Wire
3.1.5.2 Metal Clad Cable
3.1.5.3 Armored Cable
3.1.5.4 Flat Conductor Cable
3.1.6 Conduit Installation
3.1.6.1 Restrictions Applicable to Aluminum Conduit
3.1.6.2 Restrictions Applicable to EMT
3.1.6.3 Restrictions Applicable to Nonmetallic Conduit
3.1.6.4 Restrictions Applicable to Flexible Conduit
3.1.6.5 Underground Conduit
3.1.6.6 Conduit Interior to Buildings for 400 Hz Circuits
3.1.6.7 Conduit for Circuits Rated Greater Than 600 Volts
3.1.6.8 Conduit Installed Under Floor Slabs
3.1.6.9 Conduit Through Floor Slabs
3.1.6.10 Conduit Installed in Concrete Floor Slabs
3.1.6.11 Stub-Ups
3.1.6.12 Conduit Support
3.1.6.13 Directional Changes in Conduit Runs
3.1.6.14 Locknuts and Bushings
3.1.6.15 Flexible Connections
3.1.6.16 Telecommunications and Signal System Pathway
3.1.7 Busway Installation
3.1.8 Cable Tray Installation
3.1.9 Boxes, Outlets, and Supports
3.1.9.1 Boxes
3.1.9.2 Pull Boxes
3.1.9.3 Extension Rings
3.1.10 Mounting Heights
3.1.11 Conductor Identification
3.1.11.1 Marking Strips
3.1.12 Splices
3.1.12.1 Splices of Aluminum Conductors
3.1.13 Covers and Device Plates
3.1.14 Electrical Penetrations
3.1.15 Grounding and Bonding
3.1.15.1 Ground Rods
3.1.15.2 Grounding Connections
3.1.15.3 Ground Bus
3.1.15.4 Resistance
3.1.15.5 Telecommunications System
3.1.16 Equipment Connections
3.1.17 Elevator
3.1.18 Repair of Existing Work
3.1.18.1 Workmanship
3.1.18.2 Existing Concealed Wiring to be Removed
3.1.18.3 Continuation of Service

3.1.19 Surge Protective Devices

3.2 FIELD FABRICATED NAMEPLATE MOUNTING
3.3 WARNING SIGN MOUNTING
3.4 FIELD APPLIED PAINTING
3.5 FIELD QUALITY CONTROL
3.5.1 Devices Subject to Manual Operation
3.5.2 600-Volt Wiring Test
3.5.3 Transformer Tests
3.5.4 Ground-Fault Receptacle Test
3.5.5 Grounding System Test
SECTION 01 57 19 MARCH ARB GUIDE SPECIFICTION ENVIRONENTAL PROTECTION Historic Building Painting
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Class I and II Ozone Depleting Substance (ODS)
1.2.2 Contractor Generated Hazardous Waste
1.2.3 Electronics Waste
1.2.4 Environmental Pollution and Damage
1.2.5 Environmental Protection
1.2.6 Hazardous Debris
1.2.7 Hazardous Materials
1.2.8 Hazardous Waste
1.2.9 Land Application
1.2.10 Municipal Separate Storm Sewer System (MS4) Permit
1.2.11 National Pollutant Discharge Elimination System (NPDES)
1.2.12 Oily Waste
1.2.13 Regulated Waste
1.2.14 Sediment
1.2.15 Solid Waste
1.2.16 Debris
1.2.17 Green Waste
1.2.18 Material not regulated as solid waste
1.2.19 Non-Hazardous Waste
1.2.20 Recyclables
1.2.21 Surplus Soil
1.2.22 Scrap Metal
1.2.23 Wood
1.2.24 Surface Discharge
1.2.25 Wastewater
1.2.26 Stormwater
1.2.27 Waters of the United States
1.2.28 Wetlands
1.2.29 Universal Waste
1.3 SUBMITTALS
1.3.1 SD-01 Pre-contract Submittals – all preconstruction/pre-contract start work submittals shall be submitted as part of the environmental protection plan (EPP) 10 days prior to the start of any activities on March ARB as discussed below:
1.3.1.1 Environmental protection plan (EPP) (see paragraph 4.1 of this section) the contractor shall provide their EPP for approval to 452 MSG/CEV, 10 days prior to the start of any activities on March ARB. A dig/work permit, March ARB form 103, will...
1.3.1.2 Draft documents for application of stormwater notice of intent to include a draft stormwater pollution prevention plan (SWPPP), if required by the state water board and land disturbance is greater than 1 acre (upon approval contractor shall su...
1.3.1.3 Erosion and sediment control certificate (required for disturbance less than 1 acre) to be included in the EPP and must also be attached for approval with the dig/work permit (march arb form 103) submittal as specified in the statement of work;
1.3.1.4 Employee training records to be included in the EPP (as required and as described in the EPP);
1.3.1.5 Environmental manager qualifications to be included in the EPP (as required and as described in the EPP);
1.3.1.6 Hazardous waste management plan to be included in the EPP (as required and as described in the EPP).
1.3.1.7 Solid waste management plan to be included in the EPP (as required and as described in the EPP)
1.3.1.8 Erosion and sediment control inspector qualifications to be included in the EPP (as required and as described in the EPP);
1.3.1.9 Regulatory notifications to be included in the EPP (as required and as described in the EPP);
1.3.2 SD-06 Test Reports
1.3.2.1 Laboratory Analysis if required for work to be accomplished as outlined in EPP; G, CEV
1.3.2.2 Inspection Reports if required for work to be accomplished as outlined in EPP; G, CEV
1.3.2.3 Solid Waste Management Report as outlined in EPP; G , CEV
1.3.3 SD-07 Certificates
1.3.4 SD-11 Closeout Submittals
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.4.1 General:
1.4.2 Conformance with the Environmental Management System
1.5 CONFORMANCE WITH THE ENVIRONMENTAL MANAGEMENT SYSTEM
1.6 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.6.1 Environmental Coordination:
1.6.2 Environmental Planning:
1.6.3 Environmental Audits/Inspections:
1.6.4 Notices of Violations (NOV):
1.7 QUALITY ASSURANCE
1.7.1 Pre-contract Start Survey and Protection of Features
1.7.2 Regulatory Notifications
1.7.3 Environmental Brief/Pre-Installation Conference
1.7.3.1 Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the installation; and types and quantities of wastes/wastewater that may be generated during the Contract.
1.7.3.2 Discuss the results of the Preconstruction Survey at this time.
1.7.3.3 At a minimum a draft Environmental Protection Plan shall be provided 5 days before the meeting for review and discussion at the meeting.
1.7.3.4 Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and o...
1.7.4 Environmental Manager
1.7.4.1 Hazardous material and waste management if hazardous materials will be brought on base or generated during the contract, of at least an 8 hour course. Training or experience must show the ability to accomplish the following duties: ensure was...
1.7.4.2 Erosion and sediment control best practices of at least 8 hours if ground disturbance id over 1 acre or an online course if less than 1 acre
1.7.4.3 Specialized training in asbestos containing materials lead based paints or PCBs if work specified include these materials as required by the March ARB Asbestos Management Plan.
1.7.4.4 Training in the subject matter of any environmental permits required in the contract
1.7.5 Employee Training Records
1.7.6 Non-Compliance Notifications
1.8 ENVIRONMENTAL PROTECTION PLAN (EPP) REQUIREMENTS
1.8.1 General:
1.8.1.1 Descriptions
1.8.2 Duties
1.8.3 Procedures
1.8.4 Communications and Training
1.8.5 Contact Information
1.8.6 General Site Information
1.8.6.1 Drawings
1.8.7 Work Area
1.8.8 Documentation
1.8.9 Protection of Historical and Archaeological Resources
1.8.10 Stormwater Management and Control
1.8.11 Protection of the Environment from Waste Derived from Contractor
1.8.11.2 Solid nonhazardous Waste. Contractor shall include in paragraph 10.1, a project specific plan generally describing what material is to be disposed of, why these materials cannot be recycled, the schedules for disposal, the method of transpor...
1.8.11.3 Recycling Plan. Contractor shall include in paragraph 10.2, a project specific plan detailing procedures for separating wastes for recycling or reuse, including but not limited to, papers, metals and glass.
1.8.11.4 Hazardous Waste Management Plan. Contractor shall include in paragraph 10.3, a project specific plan detailing procedures for hazardous waste to be generated during the contract period. The elements of those procedures coincide with the March...
1.8.11.5 Hazardous Materials. Contractor shall include in paragraph 11 a list of proposed hazardous materials to be used in the contract and attach the Safety Data Sheets for each material, Paint is a hazardous material in the State of California.
1.8.11.6 Map of Hazardous Material Storage Areas. Contractor shall include in paragraph 11.1, storage location for all hazardous materials on a Site map.
1.8.11.7 On-site fueling sources. Contractor shall, by inserting the name of company in paragraph 11.2, agree to the requirements described in paragraph 11.2
1.8.11.8 Aboveground Storage Tank (AST). Contractor shall include in paragraph 11.3 information about any AST to be brought on the base to include:
1.8.11.9 Spill Prevention and Control Plan. Contractor shall complete paragraph 12 by filling in the missing information or attach to the EPP the Contractor’s Spill Prevention and Control Plan for the contract operations in accordance with later para...
1.8.12 Regulatory Notification and Permits
1.8.13 Clean Air Act Compliance
1.8.13.1 Pollution Generating Equipment
1.8.14 Air Pollution-engineering Processes
PART 2
2.9 LICENSES AND PERMITS
2.10 FACILITY HAZARDOUS WASTE GENERATOR STATUS
2.11 PROTECTION OF NATURAL RESOURCES
2.11.1 Flow Ways
2.11.2 Vegetation
2.12 STORM WATER
2.12.1 General:
2.12.2 Storm Water Best Management Practices (BMPs):
2.12.3 Dumping In Storm Water System.
2.12.4 Work Area Limits
2.12.5 Contractor Facilities and Work
2.13 PRESERVATION OF ARCHEOLOGICAL AND HISTORICAL SITES
2.13.1 Historic District
2.14 AIR RESOURCES
2.14.1 General:
2.14.1.1 Fugitive Particulate Control Plan
2.14.2 Coating, Painting, Adhering, and Sealing:
2.14.3 Abrasive Blasting and Corrosion Control:
2.14.4 Use of Portable Equipment Powered by Internal Combustion Engines:
2.14.5 Gasoline/E-85 Storage Tanks:
2.14.6 Burning
2.14.7 Dust and particulate matter emissions
2.14.7.1 Particulates
2.14.8 Odors
2.14.9 Violations:
2.15 SOLID WASTE REQUIREMENTS (Includes, Construction, Demolition, and Deconstruction)
2.15.1 General:
2.15.2 WASTE MINIMIZATION
2.15.3 Salvage, Reuse and Recycle
2.15.4 Nonhazardous Solid Waste Diversion Report
2.16 WASTE MANAGEMENT AND DISPOSAL
2.16.1 Waste Determination Documentation
2.16.1.1 Sampling and Analysis of Waste
2.16.2 Laboratory Analysis
2.16.3 Analysis Type
2.16.4 Solid Waste Management
2.16.4.1 Solid Waste Management Report
2.16.5 Control and Management of Solid Wastes
2.16.6 Generation:
2.16.7 Segregation:
2.16.8 Control and Management of Hazardous Waste
2.16.8.1 Hazardous Waste/Debris Management:
2.16.9 Applicable Rules to All Contracts
2.16.10 Short term Construction and Service Contracts.
2.16.11 March ARB Hazardous Waste Management Plan (HWMP):
2.16.12 Hazardous Waste Disposal
2.16.13 Contractor Disposal Turn-In Requirements
2.16.14 Disposal Documentation for Hazardous and Regulated Waste
2.17 Wastewater
2.17.1 Treatment
2.17.2 Domestic Wastewater:
2.17.2.1 Sanitary Sewer:
2.17.3 Industrial Wastewater:
2.17.3.1 Vehicle and Equipment Wash Water:
2.17.4 Pollutant Spill Supplies and Wastewater Containment Units:
2.18 HAZARDOUS MATERIAL MANAGEMENT
2.18.1 General:
2.18.2 Short Term Construction and Service Contracts Hazardous Material Reporting Requirements:
2.19 PREVIOUSLY USED EQUIPMENT
2.20 CONTROL AND MANAGEMENT OF ASBESTOS-CONTAINING MATERIAL (ACM)
2.21 CONTROL AND MANAGEMENT OF LEAD-BASED PAINT (LBP)
2.22 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING
2.22.1 Used Oil Management
2.22.2 Oil Storage Including Fuel Tanks
2.22.2.1 Spill Prevention Control and Countermeasure Plan (SPCC):
2.22.3 Reporting:

2.22.4 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS WASTES

2.23 Mercury Materials
2.24 SPILL OR RELEASE AND CLEANUP REQUIREMENTS
2.24.1 General:
2.24.2 Notification:
2.24.3 Reporting of Spills:
2.24.4 Response to a Spill:
2.24.5 March ARB, HWMP:
2.25 ENVIRONMENTAL TRAINING REQUIREMENTS
2.26 GREEN PROCUREMENT PROGRAM (GPP) REQUIREMENTS
2.26.1 General:
2.26.2 GPP:
2.26.3 Mandatory Products:
2.26.4 Contracts over $100,000:
2.27 ENERGY USAGE REQUIREMENTS
2.27.1 General:
2.27.2 Optimize Energy Performance:
2.28 NOISE.
2.29 DEMOLITION.

PART 3 ATTACHMENT 1. ENVIRONMENTAL PROTECTION PLAN TEMPLATE

SECTION 01 57 19 - Attachment 1 Environmental Protection Plan. Template
1. General:
1.1 Introduction:
1.2 Project Description (Provide a short description of the project, usually found in the general introduction to the contract Statement of Work):
Personnel Duties
Procedures
Communications and Training
Contact Information
General Site Information
1.3 Drawings
1.4 Work Area
1.5 Documentation
Management of Natural Resources
1.6 Land resources
1.7 Tree protection
1.8 Replacement of damaged landscape features
1.9 Wildlife resources
Protection of Historical and Archaeological Resources
Stormwater Management and Control
Protection of the Environment from Waste Derived from Contractor.
1.10 Solid nonhazardous Waste:
1.11 Recycling and Waste Minimization Plan
1.12 Hazardous Waste Management Plan
Hazardous Material Storage, Transportation, Disposal and Prevention of Releases to the Environment
1.13 Storage of hazardous materials.
1.14 On-site fueling sources
1.15 AST Information:
Spill Control Plan
1.16 Releases to the Environment
1.17 Reporting of Spills:
1.18 Response to a Spill:
1.19 Materials and Equipment
Regulatory Notification and Permits
Clean Air Act Compliance
1.20 Haul Route
1.21 Pollution Generating Equipment
1.22 Stationary Internal Combustion Engines
1.23 Refrigerants
1.24 Air Pollution-Engineering Processes
1.25 Compliant Materials
Wastewater Management Plan.
Signatures.