Atch_4_-_Schedule_Material_Submittals.xls

XLS spreadsheet 61 KB Posted

Attached to
Design-Build Global ASNT Increment 1, Building 470, March ARB CA
Solicitation number
FA466419BA004
Issued by

About this file

Schedule of Material Submittals

View the file

Other files

File Type Posted
FA466419BA004_Amend_0004.pdf PDF
Atch_1_-_General_Decision_dated_26_Jul_19.doc DOC document
Atch_14_-_RFI_responses_30_Jul_19.pdf PDF
FA466419BA004_Amendment_0003_-_SF_30.pdf PDF
FA466419BA0040002_-_SF_30.pdf PDF
Atch_7_-_Drawings_SK-001,_SK-002,_SK-003,_SK-004,_SK-005.pdf PDF
Atch_13_-_RFI_Responses_25_Jul_19.pdf PDF
Atch_2_-_SOW_Global_ASNT_24_July_2019.pdf PDF
Atch_8_-_As_Built_470_-_2.pdf PDF
Atch_12_-_RFI_Responses_19_July_2019.docx DOCX document
Atch_8_-_As_Built_470_-_5.pdf PDF
Atch_8_-_As_Built_470_-_6.pdf PDF
Atch_8_-_As_Built_470_-_1.pdf PDF
Atch_11_-_Pass_Information_Sheet.pdf PDF
Atch_8_-_As_Built_470_-_3.pdf PDF
Atch_8_-_As_Built_470_-_4.pdf PDF
FA466419BA004_Amendment_0001.pdf PDF
Site_Visit_Notes.pdf PDF
Atch_7_-_Drawings_SK-001_SK-002_SK-003_SK-004.pdf PDF
FA466419BA004.pdf PDF
Atch_6_-_Environmental_Protection_Plan._Template.docx DOCX document
Atch_9_-_FEP_March_ARB_June_2016.pdf PDF
Atch_11_-_Bid_Opening-Bid_Delivery_Pass_Sheet.doc DOC document
Atch_2_-_SOW_Global_ASNT_dated_26_Apr_19.docx DOCX document
Atch_5_-_Environmental_Protection_Spec.docx DOCX document
Atch_1_-_General_Decision_dated_5-3-19.doc DOC document
Atch_10_-_Contractor_Security_Pamphlet_-_11_October_2017.pdf PDF
Atch_12_-_RFI_Responses_19_July_2019.docx DOCX document
FA466419BA004_Amendment_0001.pdf PDF
Atch_11_-_Pass_Information_Sheet.pdf PDF
Site_Visit_Pass_Sheet.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule Project Number: PDPG 17-0110 Project Title: Construct Global ASNT B470 Solicitation / Contract Number:

FA466419BA004

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
165% Design Submittals2
295% Design Submittals2
3100% Design Submittals2
4As-Built Drawings2
5O&M Manuals2
6Paint Color Selection22
7Flooring221
8HVAC slit system222122222
9Window222
10Antenna Platform22
Attachment 4 to

FA466419BA004

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)