Atch_12_-_RFI_Responses_19_July_2019.docx

DOCX document 17 KB Posted

Attached to
Design-Build Global ASNT Increment 1, Building 470, March ARB CA
Solicitation number
FA466419BA004
Issued by

About this file

Atch 12 - RFI Responses dated 19Jul19

View the file

Other files

File Type Posted
FA466419BA004_Amend_0004.pdf PDF
Atch_1_-_General_Decision_dated_26_Jul_19.doc DOC document
Atch_14_-_RFI_responses_30_Jul_19.pdf PDF
FA466419BA004_Amendment_0003_-_SF_30.pdf PDF
FA466419BA0040002_-_SF_30.pdf PDF
Atch_7_-_Drawings_SK-001,_SK-002,_SK-003,_SK-004,_SK-005.pdf PDF
Atch_13_-_RFI_Responses_25_Jul_19.pdf PDF
Atch_2_-_SOW_Global_ASNT_24_July_2019.pdf PDF
Atch_8_-_As_Built_470_-_2.pdf PDF
Atch_8_-_As_Built_470_-_5.pdf PDF
Atch_8_-_As_Built_470_-_6.pdf PDF
Atch_8_-_As_Built_470_-_1.pdf PDF
Atch_11_-_Pass_Information_Sheet.pdf PDF
Atch_8_-_As_Built_470_-_3.pdf PDF
Atch_8_-_As_Built_470_-_4.pdf PDF
FA466419BA004_Amendment_0001.pdf PDF
Site_Visit_Notes.pdf PDF
Atch_7_-_Drawings_SK-001_SK-002_SK-003_SK-004.pdf PDF
FA466419BA004.pdf PDF
Atch_6_-_Environmental_Protection_Plan._Template.docx DOCX document
Atch_9_-_FEP_March_ARB_June_2016.pdf PDF
Atch_11_-_Bid_Opening-Bid_Delivery_Pass_Sheet.doc DOC document
Atch_4_-_Schedule_Material_Submittals.xls XLS spreadsheet
Atch_2_-_SOW_Global_ASNT_dated_26_Apr_19.docx DOCX document
Atch_5_-_Environmental_Protection_Spec.docx DOCX document
Atch_1_-_General_Decision_dated_5-3-19.doc DOC document
Atch_10_-_Contractor_Security_Pamphlet_-_11_October_2017.pdf PDF
Atch_12_-_RFI_Responses_19_July_2019.docx DOCX document
FA466419BA004_Amendment_0001.pdf PDF
Atch_11_-_Pass_Information_Sheet.pdf PDF
Site_Visit_Pass_Sheet.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12 to

FA466419BA004

FA466419BA004

Design/Build Global ASNT Building 470

RFI RESPONSES -19 July 2019

1. Per Section J – List of Attachments (Page 29 of 40) of the RFP, Attachment 3, Global ASNT Partial System Footprint, Rev 6, dated February 2019, 84 pages and Attachment 8, As-Built Drawings (For Reference Only), 265 pages, were not included in the list of documents to download on FBO. Please advise.

Answer: The Global ASNT Partial System Footprint is a controlled unclassified locked document located above the solicitation document that list the attachments at FBO. If you have a problem downloading this document submit email notification to martha.odonnell@us.af.mil and norman.macrunnel@us.af.mil. Attachment 8, As-Build drawings were inadvertently omitted at time of solicitation upload and are downloaded at FBO with this amended.

Amendment 0001, 19 April 2019

File details come from the government source that posted it.