FA4664-15-R-0012_0001.doc

DOC document 45 KB Posted

Attached to
Repair Airfield Pavements at March ARB CA
Solicitation number
FA4664-15-R-0012
Issued by

About this file

SF30 Amendment

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to repair C-17 Parking Apron at March ARB in accordance with Statement of Work dated 3 April 2015 to The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to repair C-17 Parking Apron at March ARB in accordance with Statement of Work dated 15 August 2015.

CLIN 0002

The CLIN extended description has changed from The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to Repair ACC Airfield Pavements, Multiple Locations, at March ARB in accordance with Statement of Work dated 3 April 2015 to The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to Repair ACC Airfield Pavements, Multiple Locations, at March ARB in accordance with Statement of Work dated 15 August 2015.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

No.

Description

Pages

1 General Wage Decision, CA150035 dated 07/10/2015 08/14/2015

2 Statement of Work Repair Airfield Pavement dated 28 May 201515 August 2015

3 Schedule of Material Submittals

4 Drawings/Plans

5 6

5 Specifications

Table of Contents

01 01 00 General Conditions

01 22 00.00 10 Measurement and Payment

01 33 00 Construction Submittal Procedures

01 33 23 Sample and Shop Drawings

01 35 26 Government Safety Requirements

01 45 10 Contractor Quality Control

01 50 02 Temporary Construction Facilities

01 57 20 Environmental Protection

01 74 19 Construction Waste Management

01 78 00 Closeout Submittals

02 41 00 Demolition

02 61 13 Excavation and Handling of Contaminated Materials

31 00 00 Earthword

31 23 00.00 20 Excavated and Fill

32 01 13 Bituminous Seal and Fog Coats

32 01 16.17 Cold Milling of Bituminous Pavements

32 01 17.16 Sealing of Cracks in Bituminous Pavement

32 01 19 Field Molded Sealants for Sealing Joints in Rigit Pavements

32 01 26.71 Grooving for Airfield Pavements

32 11 16 Base Course for Rigit and Sub base for Flexible Paving

32 11 23 Graded Crushed Aggregate Base Course

32 11 33 Cement Stabilized Base Course for Airfields and Roads

32 12 10 Bituminous Tack and Prime Coats

32 12 11 Bituminous Surface Treatment

32 12 15.13 Hot-Mix Asphalt Airfield Paving

32 12 16 Hot-Mix Asphalt (HMA) for Roads

32 13 11 Concrete Pavement for Airfields and Other Heavy

Duty Pavements

32 13 73 Compression Joint Seals for Concrete Pavements

32 17 24.00 10 Pavement Markings

6 452nd Security Forces Squadron, Security Forces Requirements for Prime/

Sub-Contractor Representatives, Pamphlet dated 1 Octobter 2014

Questions and Answers, 19 August 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .