FA4664-15-R-0012_0001.doc
DOC document 45 KB Posted
- Attached to
- Repair Airfield Pavements at March ARB CA
- Solicitation number
- FA4664-15-R-0012
About this file
SF30 Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_4_-_Revised_Locator_map.pdf | ||
| Atch_1_-_Wage_Decision_8-14-15.doc | DOC document | |
| Atch_2_-_Airfield_Pavement_SOW_dtd_15_August15.doc | DOC document | |
| Atch_7_-_Questions_ _Answers.doc | DOC document | |
| Atch_4_-_Revised_Flightline_Road.pdf | ||
| Atch_4_-_C-17_ramp_repair.jpg | JPG image | |
| Site_Walk_Notes_-_Airfield_Paving.pdf | ||
| Atch_4_-_Drawing_Locator.pdf | ||
| Atch_4_-_drawing_PDPG130268_Taxiway_Alpha.pdf | ||
| Atch_4_-_drawing_-_PDPG130268_2317.pdf | ||
| Atch_6_-_Security_Pamphlet_-_1_October_2014.doc | DOC document | |
| Atch_3_-_Schedule_of_Material_Submittals.xls | XLS spreadsheet | |
| Atch_4_-_drawing_PDPG130268_Flightline_Road.pdf | ||
| Atch_1_-_General_Decision_Number_7-10-15.doc | DOC document | |
| FA4664-15_R-0012.doc | DOC document | |
| Atch_5_-_Specifications.zip | ZIP file | |
| Atch_4_-_drawing_PDPG130268_B440.pdf | ||
| Atch_2_-_Airfield_Pavement_SOW_dtd_28May15.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to repair C-17 Parking Apron at March ARB in accordance with Statement of Work dated 3 April 2015 to The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to repair C-17 Parking Apron at March ARB in accordance with Statement of Work dated 15 August 2015.
CLIN 0002
The CLIN extended description has changed from The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to Repair ACC Airfield Pavements, Multiple Locations, at March ARB in accordance with Statement of Work dated 3 April 2015 to The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to Repair ACC Airfield Pavements, Multiple Locations, at March ARB in accordance with Statement of Work dated 15 August 2015.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
No.
Description
Pages
1 General Wage Decision, CA150035 dated 07/10/2015 08/14/2015
2 Statement of Work Repair Airfield Pavement dated 28 May 201515 August 2015
3 Schedule of Material Submittals
4 Drawings/Plans
5 6
5 Specifications
Table of Contents
01 01 00 General Conditions
01 22 00.00 10 Measurement and Payment
01 33 00 Construction Submittal Procedures
01 33 23 Sample and Shop Drawings
01 35 26 Government Safety Requirements
01 45 10 Contractor Quality Control
01 50 02 Temporary Construction Facilities
01 57 20 Environmental Protection
01 74 19 Construction Waste Management
01 78 00 Closeout Submittals
02 41 00 Demolition
02 61 13 Excavation and Handling of Contaminated Materials
31 00 00 Earthword
31 23 00.00 20 Excavated and Fill
32 01 13 Bituminous Seal and Fog Coats
32 01 16.17 Cold Milling of Bituminous Pavements
32 01 17.16 Sealing of Cracks in Bituminous Pavement
32 01 19 Field Molded Sealants for Sealing Joints in Rigit Pavements
32 01 26.71 Grooving for Airfield Pavements
32 11 16 Base Course for Rigit and Sub base for Flexible Paving
32 11 23 Graded Crushed Aggregate Base Course
32 11 33 Cement Stabilized Base Course for Airfields and Roads
32 12 10 Bituminous Tack and Prime Coats
32 12 11 Bituminous Surface Treatment
32 12 15.13 Hot-Mix Asphalt Airfield Paving
32 12 16 Hot-Mix Asphalt (HMA) for Roads
32 13 11 Concrete Pavement for Airfields and Other Heavy
Duty Pavements
32 13 73 Compression Joint Seals for Concrete Pavements
32 17 24.00 10 Pavement Markings
6 452nd Security Forces Squadron, Security Forces Requirements for Prime/
Sub-Contractor Representatives, Pamphlet dated 1 Octobter 2014
Questions and Answers, 19 August 2015
(End of Summary of Changes)
File details come from the government source that posted it. Updated .