Atch_3_-_Schedule_of_Material_Submittals.xls
XLS spreadsheet 59 KB Posted
- Attached to
- Repair Airfield Pavements at March ARB CA
- Solicitation number
- FA4664-15-R-0012
About this file
Schedule of Material Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_4_-_Revised_Locator_map.pdf | ||
| Atch_1_-_Wage_Decision_8-14-15.doc | DOC document | |
| Atch_2_-_Airfield_Pavement_SOW_dtd_15_August15.doc | DOC document | |
| Atch_7_-_Questions_ _Answers.doc | DOC document | |
| Atch_4_-_Revised_Flightline_Road.pdf | ||
| FA4664-15-R-0012_0001.doc | DOC document | |
| Atch_4_-_C-17_ramp_repair.jpg | JPG image | |
| Site_Walk_Notes_-_Airfield_Paving.pdf | ||
| Atch_4_-_Drawing_Locator.pdf | ||
| Atch_4_-_drawing_PDPG130268_Taxiway_Alpha.pdf | ||
| Atch_4_-_drawing_-_PDPG130268_2317.pdf | ||
| Atch_6_-_Security_Pamphlet_-_1_October_2014.doc | DOC document | |
| Atch_4_-_drawing_PDPG130268_Flightline_Road.pdf | ||
| Atch_1_-_General_Decision_Number_7-10-15.doc | DOC document | |
| FA4664-15_R-0012.doc | DOC document | |
| Atch_5_-_Specifications.zip | ZIP file | |
| Atch_4_-_drawing_PDPG130268_B440.pdf | ||
| Atch_2_-_Airfield_Pavement_SOW_dtd_28May15.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Sort
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||||
| 3/3/15 | SCHEDULE OF MATERIAL SUBMITTALS | Repair Airfield Pavement | FA4664-15-R-0012 | ||||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||||||||||||||
| LINE NO. | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACUTER'S | RECOMMENDATIONS | MANUFACUTER'S | WARRANTY | CATALOG DATA | OPERATING | INSTRUCTIONS | SEE PARAGRAPH | REFERENCE | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRAC-TOR RE- SUBMIT-TAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | ||||||||||||||||||||||||||
| Contract Closeout | 10 Days | ||||||||||||||||||||||||||
| 1 | 01 78 00 | 2 | after | ||||||||||||||||||||||||
| As Built Drawings | NTP | ||||||||||||||||||||||||||
| Construction Schedule | 10 Days | ||||||||||||||||||||||||||
| 2 | 01 45 10 | 2 | after | ||||||||||||||||||||||||
| Construction Pregress Schedule | NTP | ||||||||||||||||||||||||||
| Demolition Plan | 5 Days | ||||||||||||||||||||||||||
| 3 | 02 41 00 | 2 | After | ||||||||||||||||||||||||
| Demolition | NTP | ||||||||||||||||||||||||||
| Shop Drawings | |||||||||||||||||||||||||||
| 4 | 02 61 13 | 2 | See Specs | ||||||||||||||||||||||||
| Excavation and Handling of Contamnated material | |||||||||||||||||||||||||||
| Work Plan | |||||||||||||||||||||||||||
| 5 | 02 61 13 | 2 | See Specs | ||||||||||||||||||||||||
| Excavation and Handling of Contamnated material | |||||||||||||||||||||||||||
| Closure Report | |||||||||||||||||||||||||||
| 6 | 02 61 13 | 2 | See Specs | ||||||||||||||||||||||||
| Excavation and Handling of Contamnated material | |||||||||||||||||||||||||||
| Tests | |||||||||||||||||||||||||||
| 7 | 02 61 13 | 2 | See Specs | ||||||||||||||||||||||||
| Excavation and Handling of Contamnated material | |||||||||||||||||||||||||||
| Test Reports | |||||||||||||||||||||||||||
| 8 | 03 30 04 | 2 | See Specs | ||||||||||||||||||||||||
| Concrete for Minor Structures | |||||||||||||||||||||||||||
| Certificates | |||||||||||||||||||||||||||
| 9 | 03 30 04 | 2 | See Specs | ||||||||||||||||||||||||
| Concrete for Minor Structures | |||||||||||||||||||||||||||
| Product Data | |||||||||||||||||||||||||||
| 10 | 03 30 04 | 2 | See Specs | ||||||||||||||||||||||||
| Concrete for Minor Structures | |||||||||||||||||||||||||||
| Preconstruction Submittals | |||||||||||||||||||||||||||
| 20 | 31 00 00 | 2 | See Specs | ||||||||||||||||||||||||
| Earthwork | |||||||||||||||||||||||||||
| Product Data | |||||||||||||||||||||||||||
| 21 | 31 00 00 | 2 | See Specs | ||||||||||||||||||||||||
| Earthwork | |||||||||||||||||||||||||||
| Test Reports | |||||||||||||||||||||||||||
| 22 | 31 00 00 | 2 | See Specs | ||||||||||||||||||||||||
| Earthwork | |||||||||||||||||||||||||||
| Certificates | |||||||||||||||||||||||||||
| 23 | 31 00 00 | 2 | See Specs | ||||||||||||||||||||||||
| Earthwork | |||||||||||||||||||||||||||
| Equipment Manufacturer data | |||||||||||||||||||||||||||
| 30 | 32 01 16.17 | 2 | See Specs | ||||||||||||||||||||||||
| Cold Milling of Bituminous Pavements | |||||||||||||||||||||||||||
| 32 | 32 01 19 | 2 | See Specs | ||||||||||||||||||||||||
| Fiedl Molded Sealants for Sealing Joints in Rigid Pavements | |||||||||||||||||||||||||||
| Equipment Manufacturer data | |||||||||||||||||||||||||||
| 33 | 32 01 26.71 | 2 | See Specs | ||||||||||||||||||||||||
| Grooving For Airfield Pavements | |||||||||||||||||||||||||||
| EXCAVATION AND FILL 31 23 00.00 20 | |||||||||||||||||||||||||||
| 34 | SD-06 Test Reports | ||||||||||||||||||||||||||
| 35 | Density Tests | 2 | |||||||||||||||||||||||||
| 36 | Moisture Content Tests | 2 | |||||||||||||||||||||||||
| BITUMINOUS SEAL AND FOG COATS 32 01 13 | Attachment 3 to |
FA4664-15-R-0012
| SD-03 | ||||||||||
| 37 | Waybills and Delivery Tickets | 2 | ||||||||
| 38 | Equipment List | 2 | 2 | |||||||
| 39 | Inspection Reports | 2 | ||||||||
| 40 | SD-06 Test Reports | 2 | ||||||||
| SEALING OF CRACKS IN BITUMINOUS PAVEMENTS 32 01 17.16 | ||||||||||
| 41 | SD-03 Product Data | 2 | ||||||||
| 42 | SD-06 Test Requirements | 2 | ||||||||
| FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS 32 01 19. | ||||||||||
| 43 | Product Data | 2 | ||||||||
| 44 | Equipment | 2 | ||||||||
| PARTIAL DEPTH PATCHING OF RIGID PAVEMENTS 32 01 29.61 | ||||||||||
| 45 | Mix Design | 2 | 2 | |||||||
| 46 | Proprietary Cementitious Products | 2 | 2 | |||||||
| 47 | Test Reports | 2 | ||||||||
| BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING 32 11 16 | ||||||||||
| 48 | Equipment | 2 | ||||||||
| 49 | Waybills and Delivery Tickets | 2 | ||||||||
| 50 | Sampling and Testing | 2 | 2 | |||||||
| 51 | Field Density Tests | 2 | 2 | |||||||
| AGGREGATE AND/OR GRADED-CRUSHED-AGGREGATE BASE COURSE 32 11 23 | ||||||||||
| 52 | Plant, Equipment, and Tools | 2 | 2 | 2 | ||||||
| 53 | Waybills and Delivery Tickets | 2 | ||||||||
| 54 | Sampling and Testing | 2 | 2 | |||||||
| 55 | Field Density Tests | 2 | 2 | |||||||
| BITUMINOUS TACK AND PRIME COATS 32 12 10 | ||||||||||
| 56 | Waybills and Delivery Tickets | 2 | ||||||||
| 57 | Sampling and Testing | 2 | 2 | |||||||
| BITUMINOUS SURFACE TREATMENT 32 12 11 | ||||||||||
| 59 | Waybills and Delivery Tickets | 2 | ||||||||
| 60 | Test Reports | 2 | ||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS 32 12 15.13 | ||||||||||
| 61 | Shop Drawings - Placement Plan | 2 | ||||||||
| 62 | Product Data - Mix Design | 2 | ||||||||
| 63 | Product Data - Contractor Quality Control | 2 | ||||||||
| 64 | Test Reports - Aggregate | 2 | 2 | |||||||
| 65 | Test Reports - QC Monitoring | 2 | ||||||||
| 66 | Certificates - Asphalt Cement Binder | 2 | ||||||||
| 67 | Certificates - Testing Laboratory | 2 | ||||||||
| HOT-MIX ASPHALT (HMA) FOR ROADS 32 12 16 | ||||||||||
| 68 | Mix Design | 2 | 2 | |||||||
| 69 | Contractor Quality Control | 2 | ||||||||
| 70 | Material Acceptance and Percent Payment | 2 | ||||||||
| 71 | Test Report - Aggregate | 2 | ||||||||
| 72 | Test Report - QC Monitoring | 2 | 2 | |||||||
| 73 | Certificate - Asphalt Cement Binder | 2 | ||||||||
| 74 | Certificate - Testing Laboratory | 2 | ||||||||
| CONCRETE PAVEMENT FOR AIRFIELD AND OTHER HEAVY DUTY PAVEMENTS 32 13 13.03 | ||||||||||
| 75 | Product Data - Equipment | 2 | ||||||||
| 76 | Product Data - Proposed Techniques | 2 | 2 | |||||||
| 77 | Product Data - Dowels | 2 | ||||||||
| 78 | Product Data - Dowel Bar Assemblies | 2 | ||||||||
| 79 | Design Data - Proportioning Studies | 2 | ||||||||
| 80 | Test Reports - Sampling and Testing | 2 | 2 | |||||||
| 81 | Certificates - Contractor Quality Control Staff | 2 | Attachment 3 to |
FA4664-15-R-0012
| 82 | Certificates - Laboratory AccredTitation | 2 | |||
| 83 | Certificates - NRMCA Certificate of Conformance | 2 | |||
| 84 | Certificates - Commercial Laboratory | 2 | |||
| PAVEMENT MARKING 32 17 24.00 10 | |||||
| 85 | Product Data - Equipment | 2 | |||
| 86 | Product Data - Composition Requirements | 2 | |||
| 87 | Test Reports - Sampling and Testing | 2 | |||
| 88 | Certificates Colatile Organic Compount | 2 | |||
| . |
Sheet1
| EARTHWORK 31 00 00 |
| EXCAVATION AND FILL 31 23 00.00 20 |
| SD-06 Test Reports |
| Density Tests |
| Moisture Content Tests |
| BITUMINOUS SEAL AND FOG COATS 32 01 13 |
| SD-03 |
| Waybills and Delivery Tickets |
| Equipment List |
| Inspection Reports |
| SD-06 Test Reports |
| COLD MILLING BITUMINOUS PAVEMENTS 32 01 16.17 |
| SEALING OF CRACKS IN BITUMINOUS PAVEMENTS 32 01 17.16 |
| SD-03 Product Data |
| SD-06 Test Requirements |
| FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS 32 01 19. |
| PARTIAL DEPTH PATCHING OF RIGID PAVEMENTS 32 01 29.61 |
| BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING 32 11 16 |
| AGGREGATE AND/OR GRADED-CRUSHED-AGGREGATE BASE COURSE 32 11 23 |
| BITUMINOUS TACK AND PRIME COATS 32 12 10 |
| BITUMINOUS SURFACE TREATMENT 32 12 11 |
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS 32 12 15 |
| HOT-MIX ASPHALT (HMA) FOR ROADS 32 12 16 |
| CONCRETE PAVEMENT FOR AIRFIELD AND OTHER HEAVY DUTY PAVEMENTS 32 13 13.03 |
| PAVEMENT MARKING 32 17 24.00 10 |
File details come from the government source that posted it. Updated .