Questions and Answers 4.docx

DOCX document 20 KB Posted

Attached to
7 BW/CVM Thunderbolt II A-10C Static Display Shipping Service Federal contract opportunity
Solicitation number
FA466125Q0111
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a Questions and Answers file (Attachment 4) related to the destination location at Dyess Air Force Base for a contract involving an A-10C Thunderbolt II static display transportation project. The Q&A addresses multiple detailed operational aspects of the aircraft reassembly, including site conditions, safety protocols, and logistical considerations. Key clarifications include: the destination site has a serviceable dirt road, room for staging, no underground utilities except an abandoned sprinkler line, and authorization for staging three flatbed trucks and two cranes near the reassembly site for up to one week. The contractor will be responsible for any damages caused during the process, with drilling preferred over welding for hardware removal. Base security, safety, and environmental teams will have limited on-site presence, with the base curator managing most of the offload and reassembly process. Additional details confirm that the aircraft has no engines, all systems are already purged, and standard OSHA regulations will apply.

View the file

Other files for this federal contract opportunity

Other files attached to 7 BW/CVM Thunderbolt II A-10C Static Display Shipping Service, newest first.
File Type Posted
Questions and Answers 5 - Dyess AFB map.jpg JPG image
Questions and Answers 4.docx DOCX document
Questions and Answers 1.docx DOCX document
Attachment 2 FA466125Q0111 Statement of Work (Revised).pdf PDF
Questions and Answers 2.docx DOCX document
Questions and Answers 1.docx DOCX document
RFQ Combo - FA466125Q0111 - Amendment.pdf PDF
Question and Answers 3 - Sheppard AFB site and route.pptx PPTX presentation
Questions and Answers.docx DOCX document
RFQ Combo - FA466125Q0111.pdf PDF
Attachment 1 FA466125Q0111 FAR Provisions and Clauses v2.pdf PDF
Attachment 2 FA466125Q0111 Statement of Work.pdf PDF
Attachment 4 Wage Determinations.pdf PDF
Attachment 3 FA466125Q0111 RFI Questions and Answers.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A: Attachment 4

Questions About Destination Location – Dyess Air Force Base

1. Can current photographs of the destination site be provided, including a site layout showing underground utilities?

Answer: See photos in Appendix 4 of the SOW. Also see new Q&A Attachment 5 for a site map; the site will be the circle labeled “Expansion Site for Future Aircraft.” There is a serviceable dirt road leading up to the site that has changed from the time of this aerial picture. There is room to stage and assemble around the site. There are no underground utilities, except for an abandoned sprinkler line; there is no need to worry about its future.

1. Will the contractor be responsible for any required ground repairs following reassembly?

Answer: The contractor will be liable for any damages they cause. Any inevitable damages suspected should be communicated to the Contracting Officer before proceeding.

1. Will cribbing be necessary to allow safe movement over sidewalks at the reassembly site?

Answer: I do not believe that any cribbing will be required due to the limited area, but their use will not be discouraged.

1. Can the Base Safety Office provide all required safety checklists and operational instructions via email?

Answer: Standard OSHA rules and regulations apply. Coordination with the Base Safety Office can be assisted after award.

1. Will a representative from Base Security Forces be present during offloading and reassembly?

Answer: 7 SFS will only need to be on site if there is a need for traffic control. The base curator will be on site for most of the offload and reassembly and can call 7 SFS if needed.

1. Will a representative from the Base Environmental Support Team be present during offloading and reassembly?

Answer: Arrangements could be made to have a Bio-Engineering team member on station, however, since all systems and batteries are already purged, Bio-Engineering will most likely not need to be on site.

1. Will Dyess AFB authorize the use of an engine stand for reassembly purposes?

Answer: There are no engines in this aircraft, so there should be no need for an engine stand.

1. Will Dyess AFB permit three flatbed trucks and two cranes to be staged near the reassembly site for up to one week?

Answer: Yes. We have several paved parking lots in the area for joggers, visitors, and staging purposes such as this.

1. If a bolt must be welded off during disassembly, will welding it back into place be permitted, provided the final appearance of the aircraft display is not negatively impacted?

Answer: Drilling is the preferred removal method for emergency removal of hardware. Any removal should not damage the surrounding material to ensure proper reassembly.