Attachment_2 _Drawings.pdf
PDF 44 MB Posted
- Attached to
- Repair Base Water Mains Phase III Federal contract opportunity
- Solicitation number
- FA4661-14-R-0014
About this file
Attachment 2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS_AND_ANSWERS.pdf | ||
| QUESTIONS_AND_ANSWERS.pdf | ||
| Amendment_1 _Attachment_5 _Question_Submission.pdf | ||
| FA4661-14-R-0014 _Amendment_1_(CWMIII).pdf | ||
| Amendment_1 _Attachment_5 _Question_Submission.pdf | ||
| Attachment_3 _Past_Performance_Questionaire.pdf | ||
| Attachment_4 _Site_Visit_Registration.pdf | ||
| Attachment_5 _Question_Submission.pdf | ||
| Attachment_1 _SOW.pdf | ||
| FA4661-14-R-0014 _RFP_(CWMIII).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLAN
SCALE: 1" = 650' - 0"
KEY PLAN AND LEGEND
G-1
REPAIR CRITICAL
WATER MAINS
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
N
NEW WATER LINE WITH BELL
RESTRAINT HARNESSES AT BELL
AND SPIGOT JOINTS (1)
NEW WATER LINE IN TRENCH UNDER ASPHALT
OR CONCRETE PAVEMENT (3)
NEW WATER LINE WITH M.J. FITTING AND
THRUST BLOCK AT CHANGE IN
DIRECTION
NEW WATER LINE IN CASING UNDER EXISTING
PAVEMENT. CASING TO BE INSTALLED USING
JACK AND BORE METHOD (2)
EXISTING SANITARY SEWER WASTEWATER LINE
WITH GRADE CLEANOUT
PIV
WAT
POST INDICATOR VALVE IN WATER LINE
FENCE
EXISTING COMMUNICATIONS PEDESTAL
SYMBOL LEGEND NOTES:
1. THE "X'S" SHOWN IN A NEW WATER LINE ARE NOT INTENDED TO INDICATE
SPECIFIC RESTRAINT HARNESSES, BUT THAT ALL JOINTS WITHIN THE
INDICATED SPAN ARE TO HAVE RESTRAINT HARNESSES.
2. WHERE JACK AND BORE INSTALLATION IS REQUIRED, THE WORK WILL BE
REFERENCED BY "DETAIL INDICATOR" OR A "HEX" NOTE.
3. WHERE REMOVAL AND REPLACEMENT OF PAVEMENT IS REQUIRED (WITH
EXCAVATION AND BACKFILL) THE WORK WILL BE REFERENCED BY A "DETAIL
INDICATOR" OR A "HEX" NOTE.
402 404
2 170
11960
11958
11959
11913
11970
11981
11980
11905
Cantonment Area
104/102
108/106
112/110
116/114
120/118
124/122
128/126
/1
/1
/1
/1
/1
/1
119/117
115/113
111/109
107/105
103/101
104/102
108/106
112/110116/114
111/109
107/105
103/101
8 1
/1
/1
144/142
/1
/1
/1
/1
/1
104/102
103/101
110/108
114/112
3 111/109
107 105
11964
11955
11904
11751
11750
11751
AREA 8
AREA 11
AREA 10
AREA 9
AREA 12
A
AREA 1A
B C D E F G H I J K
1C
1B
2B
2C
3B
4B 4C
4D
5C
5B
6B
6D
6E
7F
7E
7D
7B
6F
8A
8C
8D
8E
8F
9A
9B
9D
9E
13K
12K
10E
10B
10A
11C
12C
13B
2D
9C
10D
10C
8B
5D
6C
7C
12B
13C
3D
3C
Y Z
3A
3Z
3Y
12D
REPAIR CRITICAL
WATER MAINS
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
CONSTRUCTION
SEQUENCE NOTES
G-2
NOTES:
1. THE ABSENCE OF REFERENCE (IN THESE "CONSTRUCTION
SEQUENCE NOTES") TO ANY/ALL ITEMS OF WORK INDICATED OR
CALLED FOR ELSEWHERE IN THESE DOCUMENTS SHALL NOT RELIEVE
THE CONTRACTOR FROM PROVIDING ANY/ALL SUCH WORK AS MAY
BE INDICATED/CALLED FOR ELSEWHERE IN THESE DOCUMENTS.
2. UNLESS SPECIFICALLY INDICATED OTHERWISE, OR AUTHORIZED BY
THE CONTRACTING OFFICER, ALL VALVE OPERATIONS (OPENING OR
CLOSING) OF VALVES CONNECTED TO ACTIVE WATER LINES SHALL
BE PERFORMED BY GOVERNMENT PERSONNEL. ALL DRAINING WORK
AFTER ISOLATION OF A LINE OR LINE SEGMENT SHALL BE
PERFORMED BY THE CONTRACTOR.
3. REFER TO "GENERAL NOTES", SHEET C-1 FOR LEAK AND PRESSURE
TESTING REQUIREMENTS.
AREA 12 (REFER TO SHEET G-7):
1. WORK LOCATION: SOUTHWEST FLIGHT LINE (SSN61) AND CONTINUING WEST TO EXISTING FIRE HYDRANT(SSN63).
A. REMOVE EXISTING FIRE HYDRANT, VALVE BOXES, AND VALVES INDICATED TO BE REMOVED.
B. PLUG ALL ABANDONED LINES AT LEVEL OF BURIAL.
CONSTRUCTION SEQUENCE NOTES:
ALL WORK IS TO BE PROVIDED BY AREA IN NUMERICAL SEQUENCE EXCEPT THE AREA 10 WORK IS TO BE PERFORMED AFTER THE AREA 8 WORK AND
BEFORE THE AREA 9 WORK.
AREA 10 (REFER TO SHEET G-6):
1. WORK LOCATION: AVENUE B FROM FOURTH STREET TO FLIGHT LINE (SSN44,45,46,48).
A. PROVIDE NEW 10" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK ALONG AVE. B FROM THE NEW 10" MAIN ON FOURTH
ST. TO THIRD ST. (SSN45,46,48).
B. PROVIDE NEW 10" MAIN FROM THIRD ST. TO SECOND ST. (SSN45). PROVIDE NEW 8" MAIN FROM SECOND ST. TO THE FLIGHT LINE
(SSN43,44).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
2. WORK LOCATION: AVENUE D FROM FOURTH ST. TO SECOND ST.
A. PROVIDE NEW 10" MAIN, SERVICE AND FIRE HYDRANT TAPS AND RELATED WORK FROM THE NEW 10" MAIN ON FOURTH ST. TO SECOND
ST. (SSN39,43,45).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
3. WORK LOCATION: THIRD STREET FROM AVE. B TO AVE. D.
A. PROVIDE NEW 10" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM THE 10" MAIN ON AVE. B TO THE NEW 10" MAIN
ON AVE. D (SSN39,43,45).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
4. WORK LOCATION: UNNAMED NORTH-SOUTH ROADWAY IMMEDIATELY WEST OF BUILDINGS 7004, 7007 AND 7008; FROM AVE. B TO AVE. D.
A. PROVIDE 8" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM NEW 10" MAIN ON AVE. B TO THE NEW 10" MAIN ON
AVE. D (SSN39,,43,45).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
5. WORK LOCATION: SECOND ST. AND FIRST ST. FROM AVE. D TO AVE. D.
A. PROVIDE 10" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM THE NEW 10" MAIN ON AVE. B TO THE NEW 10" MAIN
ON AVE. D (SSN39,43,45).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
AREA 9 (REFER TO SHEET G-5):
1. WORK LOCATION: SECOND ST. NORTH OF AVE. B AND AVE. A-3.
A. PROVIDE NEW 8" MAIN. SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM THE NEW 8" MAIN ON AVE. B TO THE EXISTING
10" MAIN WEST OF FIRST ST. (SSN26,28).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
2. WORK LOCATION: SECOND ST. BETWEEN AVE. A AND AVE. A-3. AVE. A BETWEEN SECOND ST. AND THE EAST SIDE OF THE FLIGHT LINE.
A. PROVIDE NEW 8" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM THE NEW 8" MAIN ON AVE. A-3, NORTH ALONG
SECOND ST. AND THEN WEST ALONG AVE. A TO THE EXISTING 8" MAIN ON THE EAST SIDE OF THE FLIGHT LINE. (SSN28,30,31).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
3. WORK LOCATION: FUEL TANK FARM, BOUNDED BY RAPCON ROAD ON THE NORTH.
A. PROVIDE NEW 8" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FOR THE NEW 8" MAIN; BEGINNING AT AN EXISTING
MAIN SOUTH OF THE SOUTHWEST CORNER OF THE TANK FARM, EXTENDING NORTH TO RAPCON ROAD, EXTENDING EAST ALONG
RAPCON ROAD, AND THEN SOUTH TO CONNECT TO AN EXISTING 8" MAIN NORTH OF BLDG. 9300 (SSN33,35,36).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
4. WORK LOCATION: NORTH ALONG THIRD STREET FROM AVE. A-2 TO RAPCON ROAD.
A. PROVIDE NEW 8" MAIN, SERVICE TAPS, FIRE HYDRANT TAPS AND RELATED WORK FROM AN EXISTING 8" MAIN EAST OF BLDG. 6030C TO
THE NEW 8" MAIN AT RAPCON ROAD (SSN32,34,35,36).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
5. WORK LOCATION: ALONG THIRD ST. FROM THE NEW MAIN SOUTH OF AVE. B TO AN EXISTING MAIN ON THE EAST SIDE OF THIRD ST.
A. PROVIDE NEW 6" MAIN AND RELATED WORK FROM THE NEW 10" MAIN SOUTH SOUTH OF AVE. B (SSN45), ALONG THIRD ST., AND
ACROSS THIRD ST. TO A POINT OF CONNECTION TO AN EXISTING 6" MAIN ON THE EAST SIDE OF THIRD ST.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
AREA 8 (REFER TO SHEET G-4):
1. WORK LOCATION: VICINITY OF BLDGS. 6219/6220 (CHAPEL), BLDG. 6222, WATER TOWER, AND BLDG. 6240. (SSN21,22,23,24)
A. PROVIDE 8" MAIN AND 12" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK ALONG FOURTH STREET
FROM THE EXISTING 10" MAIN SOUTH OF AVE. B (SSN21) TO THE EXISTING 8" MAIN NORTH OF BLDG. 6119 (SSN23).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
B. PROVIDE 6" MAIN AND 12" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE POINT NORTH OF
BLDG. 6119 (REFERENCED IN 1A ABOVE) (SSN23), AROUND THE NORTH AND EAST SIDES OF BLDG. 6240, THEN GENERALLY SOUTH TO
THE SOUTH SIDE OF AVE. B, AND THEN EAST TO THE EXISTING 12" MAIN WEST OF THE TRAFFIC CIRCLE (SSN22).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
2. WORK LOCATION: ELEVATED STORAGE TANK (WATER TOWER). (SSN21,22; DETAIL 1/9-D.1, SSN25.1)
A. PROVIDE 6" ELEVATED TANK DRAIN LINE FROM THE VALVE VAULT (SSN25.1) TO THE NEW FIRE HYDRANT NORTHEAST OF THE
ELEVATED STORAGE TANK (SSN22).
B. OPEN ALL NEW AND EXISTING MAIN VALVES IN THE VICINITY OF THE WATER TOWER TO INSURE THAT "LOOPED" WATER SERVICE IS
PROVIDED TO ALL MAINS WHEN THE MAIN SHUT-OFF VALVE IN THE VALVE VAULT (SSN25.1) IS CLOSED.
C. CLOSE THE MAIN SHUT-OFF VALVE IN THE VALVE VAULT, ISOLATING THE WATER TOWER FROM THE BASE WATER DISTRIBUTION
SYSTEM.
D. OPEN THE DRAIN VALVE IN THE VALVE VAULT (SSN25.1).
E. OPEN THE NEW FIRE HYDRANT NORTHEAST OF THE WATER TOWER (SSN22) AND DRAIN THE ELEVATED STORAGE TANK (WATER
TOWER).
F. DEMOLISH THE EXISTING 12" PIPING, COUPLING, MEGA-LUG, ETC. AT THE 12" MAIN ENTRY TO THE VALVE VAULT AS SHOWN ON DETAIL
2/9-D.1. DEMOLISH A PORTION OF THE EXISTING 12" MAIN WEST OF THE VALVE VAULT AS REQUIRED TO ALLOW ROUTING OF THE NEW
12" MAIN INTO THE VAULT.
G. PROVIDE THE NEW 12" MAIN FROM THE VALVE VAULT TO VALVE #3-20E ON THE WEST SIDE OF FOURTH STREET AS SHOWN ON DETAIL
1/9-D.1. (VALVE #3-20E TO HAVE BEEN PROVIDED AS PART OF THE AREA 8, ITEM 1.A WORK.)
H. PROVIDE NEW 12" MAIN PIPING FROM THE NEW MAIN DESCRIBED IN "G" ABOVE, THRU NEW VALVE #001N TO VALVE #3-21S AS SHOWN
ON DETAIL 1/9-D.1 AND SHEET 9-E. (SSN22) (VALVE #3-21S TO HAVE BEEN PROVIDED PREVIOUSLY AS PART OF THE AREA 8, 1.B WORK.)
I. PROVIDE CIPP LINER FOR THE EXISTING 12" SUPPLY LINE FROM THE ELEVATED TANK'S VERTICAL RISER TO THE VAULT (DETAIL 1/9-D.1).
J. (REFER TO "I" ABOVE). PRESSURE TEST, LEAK TEST, AND DISINFECT THE VERTICAL RISER.
K. COORDINATE THE RE-FILLING OF THE ELEVATED STORAGE TANK WITH WATER SHOP PERSONNEL THRU THE CONTRACTING OFFICER'S
REPRESENTATIVE.
L. PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
3. WORK LOCATION: FIFTH ST. FROM TEXAS DRIVE TO THE TRAFFIC CIRCLE, AND VICINITY OF BLDGS. 7401, 7402, 7403, 7407, 7409, ETC.
(SSN16,18,20)
A. PROVIDE 10" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE EXISTING 12" MAIN SOUTH OF
THE INTERSECTION OF FIFTH ST. AND TEXAS DRIVE, (SSN16) TO THE EXISTING 12" MAIN SOUTH OF THE TRAFFIC CIRCLE (SSN20).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
B. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK BEGINNING AT THE NEW 10" MAIN ON
FIFTH ST. (EAST OF BLDG. 7316) (SSN18) AND EXTENDING ON A EASTERLY AND NORTHERLY DIRECTION, LOOPING AROUND BLDGS. 7409, 7407, 7401, 7402, 7403, AND THEN WESTERLY, TERMINATING AT THE NEW 10" MAIN ON FIFTH ST. (SSN20).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
4. WORK LOCATION: FOURTH ST. FROM AVE. B TO THE EXISTING 12" MAIN SOUTH OF AVE. D; AVE. D FROM FOURTH ST. TO FIFTH ST.
(SSN15,16,17,19,21)
A. PROVIDE 10" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK ALONG FOURTH ST., BEGINNING AT THE
NEW 12" MAIN SOUTH OF AVE. B (SSN21) (REFER TO ITEM 1.A ABOVE) AND EXTENDING SOUTH TO THE EXISTING 10" MAIN SOUTH OF
AVE. D (SSN16).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
B. PROVIDE 10" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK ON THE SOUTH SIDE OF FOURTH ST., AVE. D FROM FOURTH ST. TO FIFTH ST. (SSN15,16)
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
5. WORK LOCATION: VICINITY OF BLDGS. 7301, 7339, AND 7340. (SSN17,18,19).
A. PROVIDE 10" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM FOURTH ST. EAST TO A POINT
SOUTHEAST OF BLDG. 7301 (SSN19). PROVIDE 8" MAIN PIPING ETC. FROM THE ABOVE POINT SOUTH TO AVE. C. (SSN17) PROVIDE 8"
MAIN PIPING ALONG THE NORTH SIDE OF AVE. C BETWEEN FOURTH ST. AND FIFTH ST. (SSN17).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
AREA 11 (REFER TO SHEET G-7):
1. WORK LOCATION: AVENUE E FROM SECOND ST. TO THIRD ST; THEN SOUTH ALONG FIRST ST.; THEN WEST TO THE FLIGHT LINE. (SSN50,51,55)
A. PROVIDE 10" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE EXISTING MAIN AT THIRD ST.
AND AVE. E TO SECOND ST. AND AVE. E.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
B. PROVIDE 8" AND 6" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE NEW MAIN AT SECOND
ST. AND AVE. N. (REFER TO ITEM 1.A ABOVE) TO THE EXISTING MAIN ALONG THE EAST SIDE OF THE FLIGHT LINE.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
2. WORK LOCATION: THIRD ST. FROM AVE. D TO AVE. E. (SSN55,58,60)
A. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE NEW MAIN AT THIRD ST. AND
AVE. D TO THE NEW MAIN AT THIRD ST. AND AVE. E.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
3. WORK LOCATION: SECOND ST. FROM AVE. D TO AVE. E. (SSN54,57,59)
A. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE NEW MAIN AT SECOND ST. AND
AVE. D TO THE NEW MAIN AT SECOND ST. AND AVE. E.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
4. WORK LOCATION: ALONG A ROUTE SOUTH OF BLDGS. 5201, 5202, AND 5142; FROM THE EXISTING MAIN AT THE FLIGHT LINE TO THE NEW MAIN
ALONG SECOND ST. (SSN53,54)
A. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE EXISTING MAIN AT THE FLIGHT
LINE TO THE NEW MAIN ON SECOND ST, NORTH OF AVE. E.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
AREA 11 CONTINUED (REFER TO SHEET G-7):
5. WORK LOCATION: ALONG AVE. D-2 FORM THE EXISTING MAIN AT THE FLIGHT LINE TO THE NEW MAIN ALONG SECOND ST. ALSO FROM THE
ABOVE NEW MAIN, SOUTH ON SECOND ST. AND THEN EAST TO THE NEW MAIN ALONG SECOND ST. (SSN56,57)
A. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE EXISTING MAIN AT THE FLIGHT
LINE TO THE NEW MAIN ALONG SECOND ST.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
B. PROVIDE 6" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE NEW MAIN ALONG AVE. D-2 TO
THE NEW MAIN ALONG SECOND ST.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
6. WORK LOCATION: BEGINNING AT THE NEW MAIN AT THE SOUTHEAST CORNER OF BLDG. 5202, THEN NORTH AND EAST TO THE NEW MAIN ALONG
SECOND ST. AND TO THE NEW MAIN NORTH OF BLDG. 5110. (SSN54,57)
A. PROVIDE 8" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANT TAPS, AND RELATED WORK FROM THE NEW MAIN SOUTHEAST OF
BLDG. 5202. EXTEND THE NEW MAIN PIPING TO THE NEW MAIN ALONG SECOND ST. AND TO THE NEW MAIN NORTH OF BLDG. 5110.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7).
STANDARD ITEMS OF WORK:
THE FOLLOWING ITEMS OF WORK ARE STANDARD/TYPICAL FOR EACH AREA WHERE WATER MAIN
PIPING IS TO BE REPLACED. THESE ITEMS SHALL BE PROVIDED WHERE/WHEN REFERENCED IN THE
"CONSTRUCTION SEQUENCE NOTES"
(1) ALL NEW LINES WHEN INSTALLED SHALL BE ISOLATED FROM EXISTING ACTIVE LINES AND
SHALL REMAIN ISOLATED UNTIL SAID NEW LINES HAVE BEEN DISINFECTED AND
HYDROSTATICALLY TESTED. REFER TO PARAGRAPH "TESTING PROCEDURE" OF SECTION
33 11 00 FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
(2) PRESSURE TEST, LEAK TEST, AND DISINFECT THE NEW PIPING.
(3) PROVIDE WORK AS INDICATED AND/OR REQUIRED TO CONNECT THE NEW PIPING TO THE
EXISTING PIPING AND TO PLACE THE NEW PIPING IN SERVICE.
(4) PROVIDE NEW LATERALS, BUILDING SERVICES, FIRE HYDRANTS, AND RELATED WORK AS
INDICATED/REQUIRED. PRESSURE TEST, LEAK TEST, DISINFECT THE NEW WORK, AND
PLACE IN SERVICE. (REFER TO NOTE (1) ABOVE).
(5) DEMOLISH ALL EXISTING FIRE HYDRANTS, VALVE BOXES, AND VALVES THAT HAVE BEEN
RENDERED INACTIVE BY THE WORK OF THIS PROJECT.
(6) DEPRESSURIZE AND DISCONNECT ALL MAIN PIPING WHICH HAS BEEN RENDERED
INACTIVE BY THE WORK OF THIS PROJECT (AND IS INDICATED TO BE ABANDONED).
(7) PLUG ALL ABANDONED LINES AT THE LEVEL OF BURIAL.
AREA 1A (REFER TO SHEET G-4):
1. WORK LOCATION: FROM THE EXISTING VALVE 6-9 TO THE POINT OF CONNECTION TO THE EXISTING 6" MAIN NORTH OF BLDG. 9201 AND EAST OF
HOSPITAL ROAD (SSN13,14).
A. PROVIDE 6" MAIN PIPING, VALVES, SERVICE TAPS, FIRE HYDRANTS, AND RELATED WORK FROM VALVE 6-9 TO VALVE 6E ALONG WEST
SIDE OF BLDG. 9201.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
2. WORK LOCATION: FROM THE NEW VALVE 6N1 TO THE POINT OF CONNECTION TO THE EXISTING 12" MAIN SOUTHEAST OF BLDG. 9201 HOSPITAL
LOOP (SSN13,14).
A. PROVIDE 6" MAIN FROM VALVE 6N1 (SSN14) TO THE POINT OF CONNECTION TO THE EXISTING 12" MAIN AT HOSPITAL LOOP (SSN13).
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
B. PROVIDE 6" LATERAL TO THE EXISTING BACKFLOW PREVENTER VAULT (SSN13); CLOSE ISOLATION VALVE IN VAULT, MAKE
CONNECTIONS TO EXISTING PIPING IN AT VAULT, THEN REOPEN ISOLATION VALVE IN BACKFLOW PREVENTER VAULT TO RESTORE
SERVICE.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
C. PROVIDE 6" LATERAL TO THE EXISTING BACKFLOW PREVENTER SERVING STEAM PLANT AT BLDG. 9216; CLOSE ISOLATION VALVE AT
BACKFLOW PREVENTER, MAKE CONNECTIONS TO EXISTING PIPING IN AT BACKFLOW PREVENTER, THEN REOPEN ISOLATION VALVE AT
BACKFLOW PREVENTER TO RESTORE SERVICE.
(1) PROVIDE "STANDARD ITEMS OF WORK" (1) THRU (7) AS APPLICABLE.
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
WATER MAIN PRESSURE AND LEAKAGE TEST FORM BUILDING SERVICE PRESSURE AND LEAKAGE TEST FORM
A. LOCATION:
B. DATE:
C. INITIAL TEST OR RE-TEST: INITIAL TEST RE-TEST
D. NUMBERS OF VALVES AT "ENDS"
OF LINE (SEGMENT) BEING TESTED:
E. PIPE SIZE:
F. APPROXIMATE LENGTH OF SEGMENT:
G. TEST START TIME:
H. INITIAL PRESSURE READING: 200 PSI
I. TEST END TIME(1):
J. TEST DURATION (MIN. 2 HR.):
K. ENDING PRESSURE READING(2): PSI
1. TEST PERIOD SHALL BE NOT LESS THAN TWO (2) HOURS IN DURATION.
2. ENDING PRESSURE RATING SHALL BE NOT LESS THAN BEGINNING PRESSURE RATING.
IF THE ENDING PRESSURE RATING IS LESS THAN THE BEGINNING PRESSURE RATING,
THE CONTRACTING OFFICER SHALL BE NOTIFIED IMMEDIATELY AND CORRECTIVE
ACTIONS TO LOCATE AND REPAIR THE LEAK SHALL BE BEGUN IMMEDIATELY.
3. AFTER CORRECTIVE ACTIONS ARE PERFORMED, A RE-TEST SHALL BE PERFORMED
AND DOCUMENTED, SAME AS THE ORIGINAL TEST.
4. A COMPLETED COPY OF THIS FORM SHALL BE PROVIDED TO THE CONTRACTING
OFFICER NOT MORE THAN 24 HOURS AFTER COMPLETION OF THE TEST OR RE-TEST.
5. A FULL SET OF COMPLETED TEST FORMS (IN DATE ORDER AND BOUND) SHALL BE
SUBMITTED TO THE CONTRACTING OFFICER AT THE COMPLETION OF THE PROJECT.
NOTES:
CERTIFICATION:
I HEREBY CERTIFY THAT THE ABOVE TEST WAS PERFORMED IN ACCORDANCE
WITH PARAGRAPH "FIELD QUALITY CONTROL" OF THE SECTION 02510 SPECIFICATIONS AND
THAT THE RESULTS ARE AS ENTERED ABOVE.
SIGNATURE
PRINTED NAME
FIRM
COMMENTS:
A. FACILITY/SERVICE NO.:
B. DATE:
C. INITIAL TEST OR RE-TEST: INITIAL TEST RE-TEST
D. SERVICE SIZE:
E. APPROXIMATE LENGTH OF SERVICE:
F. TEST START TIME:
G. INITIAL TEST PRESSURE READING: 200 PSI
H. TEST END TIME (1):
I. TEST DURATION (MIN. 2 HR.): HR., MIN.
J. ENDING PRESSURE READING (2): PSI
K. PRESSURE AT INLET SIDE OF
REGULATOR AFTER SERVICE LINE
IS RE-PRESSURIZED FROM THE MAIN: PSI
1. TEST PERIOD FOR SERVICES SHALL BE NOT LESS THAN TWO (2) HOURS IN
DURATION.
2. ENDING PRESSURE RATING SHALL BE NOT LESS THAN BEGINNING PRESSURE RATING.
IF THE ENDING PRESSURE RATING IS LESS THAN THE BEGINNING PRESSURE RATING,
THE CONTRACTING OFFICER SHALL BE NOTIFIED IMMEDIATELY AND CORRECTIVE
ACTIONS TO LOCATE AND REPAIR THE LEAK SHALL BE BEGUN IMMEDIATELY.
3. AFTER CORRECTIVE ACTIONS ARE PERFORMED, A RE-TEST SHALL BE PERFORMED
AND DOCUMENTED, SAME AS THE ORIGINAL TEST.
4. A COMPLETED COPY OF THIS FORM SHALL BE PROVIDED TO THE CONTRACTING
OFFICER NOT MORE THAN 24 HOURS AFTER COMPLETION OF THE TEST OR RE-TEST.
5. A FULL SET OF COMPLETED TEST FORMS (BOUND IN NUMERICAL ORDER) SHALL BE
SUBMITTED TO THE CONTRACTING OFFICER AT THE COMPLETION OF THE PROJECT.
NOTES:
CERTIFICATION:
I HEREBY CERTIFY THAT THE ABOVE TEST WAS PERFORMED IN ACCORDANCE
WITH PARAGRAPH "FIELD QUALITY CONTROL" OF THE SECTION 02510
SPECIFICATIONS AND THAT THE RESULTS ARE AS ENTERED ABOVE.
SIGNATURE
PRINTED NAME
FIRM
COMMENTS:
TEST FORMS
G-3
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
CONSTRUCTION
SEQUENCE PLAN
AREAS 1A AND 8
G-4
9-16
9-15
9-18
9-14
9-20
9-21
6-9
P.I.V.
6-7
6" AC
12"
6-3
6-6
12"
6"
P.I. VALVE
6" A.C.
9-20
9-19
6" AC
EX. BACKFLOW
PREVENTER
6"
6"
6"
6"
6"
9-14
6"
9-15
6"
9-16
6"
6"
6"
6"
6N2
6NW
6S
6N1
6W
6"
6"
CONSTRUCTION SEQUENCE - AREA 1A
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
NOTE:
1. TEXT IN BLOCKS (I.E. ) REFERENCE
"CONSTRUCTION SEQUENCE" NOTES. REFER
TO SHEET G-2.
1A
CONSTRUCTION SEQUENCE - AREA 8
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
7-12
7-4
7-8
6-35
6-21
6-20
6-18
6-17
7-6
7-1
7-22
7-17
7-19
7-14
7-9
7-10
7-5
7-15
7-16
7-13
7-29
7-64
7-27
7-26
7-25
7-30
7-32
7-31
7-33
7-2
8" AC
8.00" AC
10" AC
1-1/2"
1-1/2"
4-45B
4"
3"
3"
3"
8"
4"
3-12A
4-29A
4-45
6-36
6-37
3-11
4-71
4-73
(NOT LOCATED)
4-78A
4-20
3-3
12"
10"
4-54
4-28A
6-28B
6-28A
6-28
2"
6"
4-40
4-29B
RECENTLY INSTALLED
12" C900 LINE FROM
MULTI-FAMILY HOUSING
AREA
12"
12"
ELEVATED
STORAGE
TANK
8.00" AC
10" AC
7-63
6"
7-29
2" WAT
WAT
12"
7-61
PIV
7-62
PIV
4-76
PIV
PIV
PIV
7-11
6"
3" WAT
3-83
NOT
FOUND
PIV
8.00" AC
2"Ø COPPER
PIPE UP
THRU FLOOR
2-1/2"
PVC O.D.
2 VALVES, POOL
FILL VALVE BOX
W V
2"Ø PIPE @
FAUCET
6"
2"
1-1/4"Ø @
VALVEBOX
1"Ø COPPER
AT W.H.
1"Ø COPPER
AT W.H.
3"
10"
10"
10"
8.00" AC
8"
10"
8.00" AC
PIV
PIV
2"
3"
8"
8"
2"
8"
6"
1"Ø COPPER
AT W.H.
6"
6"
6"
6"
6"
6"
2"
2-1/2"
2-1/2"
2"
2"
2-1/2"
1"
1-1/2"
1-1/2"
2"
6"
6"
2"
7-12
6"
8"
6"
1"
6"
7-13
10"
10"
7-11
7-10
3"
7409A
7-5
7407B
6"
6"
7-9
3"
7407A
8"
10"
10"
7340B
8"
6"
7-4W
6"
7-4
7-2
7-3
7-3
7-8
7421A
7422A
7-6
4-20W
7-19
7340A
7-63
6-28
6-17
6-18
7-25
7-27
7-64
4-55E
7-61
4-40W
7-45
10"
10"
10"
2"
2"
10"
10"
7-17
7-16
10"
10"
12"
12"
12"
6-20
6-37
6-35
2-1/2"
6-36
12"
6"
6"
12"
12"
8"
12"
6"
2"
2"
2"
3"
8"
2"
2"
2"
1-1/2"
6"
6"
7301A
7-22
8"
8"
8"
6"
10"
8"
PIV
6"
7-29
4-71
10"
3-20N
3-20E
3"
5DN
2"
8"
8"
2"
1"
8"
1"
1"
8"
4"
2"
8"
1-1/2"
2"
8"
8"
8"
8"
4-54
8"
8"
8"
6220A
5DW
10"
6"
8"
7-1
7-1
6"
4"
6"
4"
PIV
2-1/2"
2"
10"
6"
10"
10"
10"
6"
6"
4-78A
10"
10"
10"
6"
10"
8"
7-15
10"
10"
10"
8"
8"
10"
7-62
10"
4-40E
6"
10"
10"
4-29C
4-55S
1"
8"
10"
6"
6"
12"
6"
6"
6"
3-21S
3-21E
6"
6"
10"
6"
3-11
4-55N
10"
CAP
7421,7422
12"
12"
8"
4-45N
6"
2"
4"
4-73
6220B
3-21N
3-20S
5DS
4-20S
4-20N
4-45W
4-45E
001N
4DN
4DS
4DW
10"
7-4N
5CDN
5CDS
5CDE
4BCN
4BCS
45BCN
7301W
7-17S
5-BCS
5-BCN
5-BCE
7403N
4BE
4BW
4BN
8"
3-12N
3-12W
3-12S
3"
6"
6"
PIV
4"
6"
8"
4CS
7-18
7-18
PIV
8"
6"
8"
45CW
45CE
45CN
4CS
6"
6"
PIV
2"
7301B
6-28A
1-1/2"
6-19
6-15
5BW
7-24
7-24
7-60
7-65
7-65
6"
2A
2B
2C
3B
1B
1A
4B
4A
3A
5A
3A
4A
5A
5A
1A
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
CONSTRUCTION
SEQUENCE PLAN
AREA 9
G-5
CONSTRUCTION SEQUENCE - AREA 9
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
NOTE:
1. TEXT IN BLOCKS (I.E. ) REFERENCE
"CONSTRUCTION SEQUENCE" NOTES. REFER
TO SHEET G-2.
1A
6030C
9-48
4-6
4-9
6-2
9-8
9-49
9-10
9-11
9-6
6-10
6-1
6-5
6-4
6-6
6-8
6-7
9-3
4-56
4-3A
4-4
4-3
4-5
6-3
3-42
8"
8"
3-70B
8"
8"
8"
3-78
2"
8"
8"
3-70
8"
3-70A
8"
6"
3-78A
3-76
3-75
3-74
3-57
3-56
3-58A
3-53
3-32
3-52A
3-43
3-44
3-46
3-61A
3-61
3-59A
3-60
3-59
3-38
8"
MH #6-13G
8"
3-73
9-12
6"
6030B
EX. WTR SERV.
TO BLDG. 9190
8"
3-69
NOT FOUND
PIV
PIV
10" AC
8"
3"
6" FIRE
1-1/4"
10"
10"
10"
PIV
4-7
REMOVE/SALVAGE EX.
PURGE STATION;
DEMOLISH BOLLARDS
(NOT LOCATED)
4-55
6-43
PIV
6-40
6-42
PIV
REMOVE AND RELOCATE EX. PURGE
STATION WITH BOLLARD; REFER
SHEET 11-B FOR CONTINUATION
PIV
6-44
EX. 2" PIPE
RISER WITH
FAUCET
PIV
EX. PIPE
RISER WITH
FAUCET
EX. 1" PIPE
RISER WITH
FAUCET
EX. EMERGENCY
EYE WASH STATION
9-40
EX. EMERGENCY
EYE WASH STATION
PIV
6"
6"
6"
2"
2"
6"
6"
6"
2-1/2"
6030A
2"
2"
2"
2"
2"
6"
2-1/2"
1-1/2"
4"
PIV
4"
4"
6"
6"
2"
2"
2"
6-4
6-3
6-2
6-5
8"
8"
10"
10"
10"
10"
8"
8"
8"
10"
8"
8"
8"
8"
8"
6"
6"
6-42
6-40
8"
3-42
6"
6-44
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
6"
6"
1-1/2"
6"
6"
6"
6"
6"
6"
6"
6"
9-48
9-8
3/4"
8"
8"
8"
8"
10"
10"
6"
6030A
6030B
6-43
6"
2"
6"
6030C
6"
6"
6"
6"
8"
2"
6"
8"
6"
6"
4-7
4-6
8"
8"
8"
8"
6"
6"
6"
8"
9-49
6"
9-6
6"
2"
1-1/2"
1"
1"
6"
6"
6"
PIV
6"
6"
6"
6"
6"
2-1/2"
1-1/2"
2-1/2"
6"
6"
6"
10"
8"
3-46N
3-46W
3-46S
3-60N
3-60S
3-60E
6"
3"
6"
9-10
9-40
2-1/2"
9-11
PIV
6"
6"
6"
8"
10"
7004A
8"
6"
2-1/2"
PIV
6"
6"
3-73S
3-73N
3-74S
3-74N
3-74E
3-69N
3BS
3BE
3BN
3BW
23BS
23BW
23BE
2BE
2BS
2BW
2BN
2ABN
2ABE
3A
3RS
3RE
3RW
9328S
3-ARN
3-ARS
PIV
PIV
PIV
6"
4"
10"
10"
PIV
10"
10"
10"
2"
1A3S
1BN
1A3E
10"
6"
6"
6"
6"
6"
6"
6"
2"
10"
10"
A3N
2"
8"
8"
3-52A
6"
6"
4"
PIV
RELOCATED
PURGE STATION
WITH BOLLARDS
6"
3-73E
8"
PIV
PIV
6-26
6-11
6-9
A3W
3-56
3-77N
9-41
9-41
9-42
9-42
9-44
9-50
9-51
6-41
6-41
4-51
6-31
6-31
6-31
6-39
6-39
6-38
4-54
4-54
4-52
4A
3A
2A
1A
5A
3A
4A
3A
4A
2A
2A
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
CONSTRUCTION
SEQUENCE PLAN
AREA 10
G-6
CONSTRUCTION SEQUENCE - AREA 10
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
NOTE:
1. TEXT IN BLOCKS (I.E. ) REFERENCE
"CONSTRUCTION SEQUENCE" NOTES. REFER
TO SHEET G-2.
1A
7-43
7-50
4-9
4-10
7-53
7-51
6-2
7-22
6-1
7-41
7-42
7-36
7-37
7-35
7-29
7-64
7-27
7-26
7-25
6-5
6-4
7-39
7-40
7-48
7-49
7-30
7-32
7-31
7-44
7-38
7-47
7-46
7-45
7-33
5-1
7-54
4-19
4-17
4-16
4-15
4-14
4-14A
5-3
5-5
6-25
7-52
10" AC
6-3
1-1/2"
6"
6"
1-1/2"
3"
4"
1-1/2"
4-45B
4"
3"
2"
4-86A
3"
3"
4-86B
6"
6"
3-32
3-52A
4-166
3-43
3-44
4-142
4-15
4-141
4-45
4-86
4-79A
3-19
4-71
4-73
(NOT LOCATED)
4-78A
4-54
4-98
2"
6"
6"
10" AC
10" AC
4"
7-29
7-
PIV
PIV
4-76
PIV
PIV
8"
8"
PIV
F.H. SET IN
CENTER OF
CONCRETE
ISLAND
EX. MANHOLE
COVERS
CRUSHED RISER
ONLY; NO COVER,
FILLED WITH DIRT
NEW F.H. NO
ISOLATION VALVE
PIV
NEWLY REPLACED
F.H. W/SHUT-OFF
COVER IN SIDEWALK
NO WATER
AT CANOPY
PIV
PIV
NOT FOUND
ABANDONED
VALVEBOX
DEMOLISH
EXISTING
DRINKING
FOUNTAIN
NOT
FOUND
PIV
EX. PIV
FIRE PUMP
HOUSE
PIV
8.00" AC
PIV
5-4
PIV
PIV
PIV
4-43
PIV
ALUMINUM
RISER W/
LOCKING CAP
4-42
NEWLY REPLACED
F.H. W/SHUT-OFF
BACK TO MAIN
PIV
PIV
10" AC
10" AC
3"
PIV
PIV
2"
PIV
8"
6"
2-1/2"
2-1/2"
2"
7-25
7-27
7-64
4-55E
7-6
7-45
7-46
4-102N
4-103N
7-47
7-54
4-141N
2"
10"
10"
10"
10"
10"
10"
12"
2-1/2"
7301A
7-22
10"
8"
PIV
6"
7-29
4-71
10"
10"
10"
10"
10"
6"
3-19N
2"
4-54
PIV
4-7
2"
2"
2"
3"
6"
6"
8"
6"
3"
2"
2"
PIV
1-1/2"
6"
PIV
1-1/2"
3"
6"
PIV
2-1/2"
6"
6"
6"
6"
6"
2"
2" WAT. TO
COOLING
TOWER
6"
2-1/2"
2"
4"
4"
PIV
6"
6"
2"
8"
2"
6"
2-1/2"
PIV
2-1/2"
8"
EX. EMERGENCY
EYE WASH STATION
1-1/2"
PIV
2-1/2"
6"
6"
6"
6"
1-1/2"
4"
PIV
4"
1-1/2"
4"
6"
6"
2"
3"
1-1/2"
6"
6"
6"
1-1/2"
PIV
6"
4-17
4-16
4-15
7008A
7008B
7008D
7-53
7-44
4-98E
7-51
7-42
7-50
7-41
4-86E
7-40
7004B
7-39
2"
6-4
6-3
6-2
6-5
6-25
7-52
4-142W
4-142S
5-4
5-5
10"
10"
10"
10"
10"
10"
10"
2-1/2"
6"
6"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
10"
10"
10"
10"
10"
10"
10"
8"
8"
10"
10"
8"
10"
10"
8"
8"
8"
8"
10"
7-48
7-49
4-48
6"
3"
2"
4-15
6"
PIV
PIV
3"
3"
8"
10"
4"
6"
4"
3"
2"
1-1/2"
PIV
2-1/2"
8"
6"
2"
10"
6"
10"
10"
10"
6"
4-78A
10"
10"
10"
6"
10"
8"
10"
10"
10"
8"
4-11
7-43
1-1/2"
6"
10"
4-55S
10"
6"
6"
2"
2"
6"
10"
5-3
4-102E
4-103W
4-103S
10"
10"
10"
10"
10"
6"
6"
6"
10"
4-55N
6"
4-166
8"
7008C
6"
4-142N
2"
4-45N
PIV
3"
10"
7004A
8"
6"
2-1/2"
PIV
DEMOLISH
EXISTING
DRINKING
FOUNTAIN
6"
6"
6"
2"
4"
4-73
6"
4-141W
4-141E
3-19W
3-19E
4-45W
4-45E
4-86N
4-86S
4DN
4DS
4DW
4BCN
4BCS
45BCN
4BE
4BW
4BN
3BS
3BE
3BN
3BW
23BS
23BW
23BE
2BE
2BS
2BW
2BN
2BCN
2BCW
2BCS
23BCN
4-98N
4-98S
1DN
1CN
1BCW
4216W
PIV
PIV
PIV
6"
4"
10"
10"
PIV
10"
10"
2"
1BN
10"
6"
3"
10"
10"
8"
6"
6"
4"
6"
8"
4CS
7-18
7-18
4CS
6"
1-1/2"
A3N
2"
8"
8"
3-52A
6"
6"
PIV
6"
PIV
4"
PIV
PIV
1-1/2"
PIV
PIV
PIV
6-32
6-19
6-26
A3W
23CDN
FL6E
7-24
7-24
6-31
6-31
6-31
8-27
7-60
6-39
6-39
6-38
4-40
4-40
4-41
4-41
4-54
4-54
4-52
4-45
4-45
5A
4A
3A
1B
2A
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
CONSTRUCTION
SEQUENCE PLAN
AREA 11
G-7
CONSTRUCTION SEQUENCE - AREA 11
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
NOTE:
1. TEXT IN BLOCKS (I.E. ) REFERENCE
"CONSTRUCTION SEQUENCE" NOTES. REFER
TO SHEET G-2.
1A
3-141
8-16
8-18
8-19
8-9
8-10
8-17
8-24
8-23
8-22
8-21
8-20
5-1
7-54
8-14
8-7
8-6
8-8
8-15
5-9
5-14
5-13
5-3
5-21
5-22
5-21
5-19
10" AC
6" AC
8" AC
4"
M.H. #8-8A
RIM 1769.50
INV 1765.99
4-137
4-137A
5-11
4-128
8-34
4-130
4-142
4-141
6" AC
8" HDPE
6"
6"
6"
4-111A
10"
10" AC
10" AC
8" AC
PIV
EX. MANHOLE
COVERS
CRUSHED RISER
ONLY; NO COVER,
FILLED WITH DIRT
NEW F.H. NO
ISOLATION VALVE
PIV
8-38
PIV
8-37
NOT FOUND
NOT IN
SERVICE
PIV
PIV
5-8
5-63
8-35
PIV
PIV
PIV
8-30
OLD PORT.
BLDG. SITE
(VACANT)
PIV
PIV
PIV
8-32
PIV
PIV
5-6
RISER W/ ALUMINUM
JACKET ABOVE GRADE
8-12
8-13
PIV W/
CONTROL
EYE WASH
STATION
AQUA SHIELD
BOX COVER W/
B.F. PREVENTER
PURGE STATION
WITH BOLLARDS
6" AC
ABOVE GRADE
DOUBLE CHECK
W/ VALVE BOX
PIV
PIV
1-1/2"
8" AC
6"
3"
6"
2"
2"
6"
8" AC
5-62
2"
6"
2"
EX. FIRE LINE
VALVE PIT
4-103N
7-54
4-141N
10"
10"
8-20
8-21
8-22
8-23
8-38
8-12
8-6
8-13
8-14
8-7
8-16
8-8
8-15
8-10
8-17
8-24
8-19
8-37
5-8
5-63
8-35
8-34
8-30
8-32
5-62
5-6
4-142W
4-142S
8030B
PIV
6"
5162A
5162B
8"
2-1/2"
6"
8"
8"
8"
2"
2"
2"
2-1/2"
3"
PIV
3"
4-127N
4-128W
PIV
6"
3"
3"
6"
8"
2-1/2"
8"
8"
8"
8"
8"
6"
5-9
8"
8"
8"
8"
8"
6"
PIV
8"
3"
8"
6"
8"
1-1/2"
EX. 1-1/2" PIPE
RISER WITH
F.P. FAUCET
1-1/2"
8"
8"
2"
2"
1-1/2"
2"
6"
1-1/2"
8"
4-127S
2"
6"
6"
6"
1-1/2"
6"
6"
6"
6"
8"
8"
8"
8"
8"
8"
8"
10"
10"
10"
10"
10"
4-111E
10"
8"
6"
8"
8"
8"
8"
8"
8"
8"
8"
6"
1"
2"
2-1/2"
1-1/2"
PIV
6"
3"
1-1/2"
3/4"
1-1/4"
3/4"
4"
6"
6"
6"
8015B
8015A
2"
8019A
2"
6"
6"
6"
1-1/2"
2"
2"
2"
2"
6"
8030A
1-1/2"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
2"
6"
6"
2"
6"
6"
8"
2"
2-1/2"
8"
8"
8"
8"
8"
PIV
6"
6"
1-1/2"
6"
8-5
8-11
PIV
ABANDONED
5-3
4-103W
4-103S
10"
8"
6"
6"
2-1/2"
6"
8"
RELOCATED
PURGE STATION
WITH BOLLARDS
6"
6"
6"
4-137
2"
3"
6"
5-1
6"
6"
PIV
4-142N
2"
8"
2"
8"
8"
6"
6"
6"
4-130W
2"
2-1/2"
2-1/2"
6"
2"
4-141W
4-141E
4-130N
4-130S
4-111S
4-111W
3-141N
3-141E
3-141W
4-128N
4-128S
2D2W
2D2N
2D2S
1D2S
1D2E
E1S
2ESE
2ESN
2ESW
8019B
23ES
3E1
3E2
3E3
3DEN
3DEW
3DES
1D3W
1D3E
1D3S
1D4N
1D4S
1D4W
2ENN
2ENS
2ENW
2DEE
1D23N
1D23E
12D2W
12D2S
2.00" EYEWASH
STATION
EX. 1" PIPE
RISER WITH
F.P. FAUCET
6"
1-1/2"
6"
6"
6"
6"
6"
12D2N
2-1/2"
PIV
PIV
8-18
2"
PIV
FL2E
FL1E
FL3E
FL4E
FL5E
5-46
8-39
8-39
8-33
5-64
5-64
5-61
5-60
8-40
8-40
5-51
2"
6"
2"
5-2
5-3
3-1
CONSTRUCTION SEQUENCE - AREA 12
SCALE 1" = 200'-0"
N
0 200
SCALE IN FEET
AREA 10
AREA 11
1B
1A
4A
2A
3A
5B
5A
4A
6A
6A
6A
3A
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
G-8
WATER ISOLATION VALVE
SCHEDULES
AREA 8 WATER ISOLATION VALVE SCHEDULE
DESIGNATION GENERAL LOCATION SHEET NO.
GPS LOCATION (1) SIZE IN
INCHES MATERIAL NOTES
LATITUDE LONGITUDE
4-40E 4TH & AVE. B 6-E 10 CI
4-40W 4TH & AVE. B 6-E 10 CI
4DN 4TH & AVE. B 6-E 10 CI
4DS 4TH & AVE. B 6-E 10 CI
4DW 4TH & AVE. B 6-E 10 CI
4-29C SOUTH OF 5TH & TEXAS 6-F 10 CI
5DN 5TH & AVE. D 6-F 10 CI
5DS 5TH & AVE. D 6-F 10 CI
5DW 5TH & AVE. D 6-F 10 CI
4-54 4TH @ BLDG. 7215 7-E 6 CI
4-55E 4TH @ BLDG. 7201 7-E 8 CI
4-55N 4TH @ BLDG. 7201 7-E 10 CI
4-55S 4TH @ BLDG. 7201 7-E 10 CI
45CE AVE. C @ BLDG. 7340 7-E 8 CI
45CN AVE. C @ BLDG. 7340 7-E 8 CI
45CW AVE. C @ BLDG. 7340 7-E 8 CI
4CS 4TH @ BLDG. 7339 7-E 8 CI
7-17S BETWEEN BLDG. 7339 & BLDG.
7340 7-E 8 CI
4-20N 5TH & AVE. C 7-F 10 CI
4-20S 5TH & AVE. C 7-F 10 CI
4-20W 5TH & AVE. C 7-F 8 CI
5CDE 5TH @ BLDG. 7316 7-F 8 CI
5CDN 5TH @ BLDG. 7316 7-F 10 CI
5CDS 5TH @ BLDG. 7316 7-F 10 CI
7-4N F.H. 7-4 EAST OF BLDG. 7407 7-F 8 CI
45BCN BLDG. 7301 8-E 10 CI
4-76A 4TH & AVE. C 8-E 10 CI
4BC 4TH @ BLDG. 7106 8-E 10 CI
4BCE 4TH @ BLDG. 7110 8-E 10 CI
4BCN 4TH @ BLDG. 7110 8-E 10 CI
4BCS 4TH @ BLDG. 7110 8-E 10 CI
7301W BLDG. 7301 8-E 8 CI
5BCE 5TH @ BLDG. 7350 8-F 8 CI
5BCN 5TH @ BLDG. 7350 8-F 10 CI
5BCS 5TH @ BLDG. 7350 8-F 10 CI
6-28 5TH SOUTH OF TRAFFIC CIRCLE 8-F 10 CI
6-28A 5TH SOUTH OF TRAFFIC CIRCLE 8-F 12 CI
7403N BLDG. 7403 8-F 8 CI
3-20E 4TH @ WATER TOWER (WEST) 9-D 12 CI
3-20N 4TH @ WATER TOWER (WEST) 9-D 8 CI
3-20S 4TH @ WATER TOWER (WEST) 9-D 12 CI
4BE 4TH & AVE. B 9-D 10 CI
4BN 4TH & AVE. B 9-D 12 CI
4BW 4TH & AVE. B 9-D 10 CI
001N WATER TOWER 9-E 12 CI
3-21E 4TH @ WATER TOWER (NORTH) 9-E 12 CI
3-21N 4TH @ WATER TOWER (NORTH) 9-E 6 CI
3-21S 4TH @ WATER TOWER (NORTH) 9-E 12 CI
5BW AVE. B. WEST OF TRAFFIC CIRCLE 9-E 12 CI
3-12N 4TH @ BLDG. 6240 10-D 6 CI
3-12S 4TH @ BLDG. 6240 10-D 8 CI
3-12W 4TH @ BLDG. 6240 10-D 8 CI
AREA 1A WATER ISOLATION VALVE SCHEDULE
DESIGNATION GENERAL LOCATION SHEET NO.
GPS LOCATION (1) SIZE IN
INCHES MATERIAL NOTES
LATITUDE LONGITUDE
6N2 BLDG. 9201 (SOUTHEAST) 12-K 6 CI
6NW BLDG. 9201 (NORTHEAST) 13-K 6 CI
6N1 BLDG. 9201 (NORTHWEST) 13-K 6 CI
6S BLDG. 9201 (NORTHWEST) 13-K 6 CI
6W BLDG. 9201 (NORTHWEST) 13-K 6 CI
AREA 9 WATER ISOLATION VALVE SCHEDULE
DESIGNATION GENERAL LOCATION SHEET NO.
GPS LOCATION (1) SIZE IN
INCHES MATERIAL NOTES
LATITUDE LONGITUDE
1BN 1ST ST. & AVE. B 8-B 10 CI
A3N AVE. A-3 @ BLDG. 4201 9-B 6 CI TAPPING SLEEVE @ 10"
MAIN
A3W AVE. A-3 @ BLDG. 4201 9-B 8 CI TAPPING SLEEVE @ 10"
MAIN
3-52A FLIGHT LINE @ BLDG. 4201 9-A 8 CI TAPPING SLEEVE @ 8"
MAIN
3-46N 2ND ST. & AVE. A-3 9-B 8 CI
3-46S 2ND ST. & AVE. A-3 9-B 8 CI
3-46W 2ND ST. & AVE. A-3 9-B 8 CI
2ABN 2ND ST. SOUTHWEST OF BLDG.
6030 9-B 8 CI
2ABE 2ND ST. SOUTHWEST OF BLDG.
6030 9-B 6 CI
1A3E 1ST ST. & AVE. A-3 9-B 10 CI
1A3S 1ST ST. & AVE. A-3 9-B 10 CI
3-56 FLIGHT LINE @ BLDG. 4101 10-A 8 CI TAPPING SLEEVE @ 8"
MAIN
3-60E 2ND ST. & AVE. A 10-B 8 CI
3-60N 2ND ST. & AVE. A 10-B 8 CI
3-60S 2ND ST. & AVE. A 10-B 8 CI
3-42 3RD ST. WEST OF BLDG. 6142 10-C 8 CI
3A 3RD ST. & AVE. A 10-C 8 CI
3-73E 3RD ST. & AMMO RD 11-C 8 CI
3-73N 3RD ST. & AMMO RD 11-C 8 CI
3-73S 3RD ST. & AMMO RD 11-C 8 CI
3ARN 3RD ST. @ DRAINAGE DITCH 11-C 8 CI NORTH OF DRAINAGE
DITCH
3ARS 3RD ST. @ DRAINAGE DITCH 11-C 8 CI SOUTH OF DRAINAGE
DITCH
3-69N SOUTHWEST OF FUEL TANK FARM 12-B 8 CI
3RE 3RD ST. & RAPCON RD 12-B 6 CI
3RS 3RD ST. & RAPCON RD 12-B 8 CI
3RW 3RD ST. & RAPCON RD 12-B 8 CI
3-74E 3RD ST. @ BLDG. 9304 12-C 8 CI
3-74N 3RD ST. @ BLDG. 9304 12-C 8 CI
3-74S 3RD ST. @ BLDG. 9304 12-C 8 CI
3-77N EAST OF BLDG. 9304 12-C 6 CI
9328S SOUTHEAST OF BLDG. 9328 12-D 6 CI TAPPING SLEEVE @ 8"
MAIN
NOTES:
1. THE CONTRACTOR SHALL SECURE THE SERVICES OF A REGISTERED PUBLIC SURVEYOR
TO DETERMINE THE LOCATION OF ALL NEW VALVES INSTALLED UNDER THIS PROJECT
AND ALL EXISTING VALVES LISTED ABOVE, USING GLOBAL POSITIONING SYSTEM (GPS)
EQUIPMENT AND TECHNOLOGY. THE GPS EQUIPMENT/TECHNOLOGY USED SHALL BE OF
THE "REAL TIME KINEMATICS (RTK) FLOAT POSITIONS" TYPE AND SHALL PROVIDE
ACCURACY OF 20cm-1.0m. EQUIPMENT SHALL CONSIST OF TWO(2) RECEIVER STATIONS
WITH A RADIO LINK. LATITUDE AND LONGITUDE VALUES FOR ALL NEW VALVE LOCATIONS
SHALL BE RECORDED IN THE SPACES PROVIDED IN THE SCHEDULES ON THIS SHEET.
THIS INFORMATION SHALL BE PROVIDED IN THE CONTRACTOR'S RECORD DRAWINGS ("AS
BUILT") SUBMISSION. THE SURVEYOR SHALL PROVIDE AS SIGNED AND SEALED LETTER
ATTESTING TO THE ACCOMPLISHMENT AND ACCURACY OF THIS LOCATION WORK. THIS
LETTER SHALL BE PROVIDED WITH THE COMPLETED SCHEDULES.
2. ANY ADDITIONAL ISOLATION VALVES (NEW OR EXISTING VALVES INDICATED TO REMAIN)
WHICH ARE NOT LISTED IN THIS SCHEDULE, BUT APPEAR ON THE DRAWINGS, SHALL BE
LOCATED AND ADDED TO THIS SCHEDULE.
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
G-9
WATER ISOLATION VALVE
SCHEDULES
AREA 10 WATER ISOLATION VALVE SCHEDULE
DESIGNATION GENERAL LOCATION SHEET NO.
GPS LOCATION (1) SIZE IN
INCHES MATERIAL NOTES
LATITUDE LONGITUDE
4-142N 2ND ST. & AVE. D 6-C 10 CI
4-142S 2ND ST. & AVE. D 6-C 8 CI
4-142W 2ND ST. & AVE. D 6-C 10 CI
4-141E AVE. D & SERVICE RD 6-C 10 CI
4-141N AVE. D & SERVICE RD 6-C 8 CI
4-141W AVE. D & SERVICE RD 6-C 10 CI
23CDN SERVICE RD & BLDG. 7008 6-C 8 CI
4-98E 3RD ST. @ BLDG. 7008 6-C 6 CI
4-98N 3RD ST. @ BLDG. 7008 6-C 8 CI
4-98S 3RD ST. @ BLDG. 7008 6-C 8 CI
1CN 1ST ST. @ BLDG. 5003 6-C 10 CI
1DN 1ST ST. @ BLDG. 5001 6-C 10 CI
4-103N 3RD ST. & AVE. D (SOUTH) 6-D 10 CI
4-103S 3RD ST. & AVE. D (SOUTH) 6-D 8 CI
4-103W 3RD ST. & AVE. D (SOUTH) 6-D 10 CI
4-102E 3RD ST. & AVE. D (NORTH) 6-D 10 CI
4-102N 3RD ST. & AVE. D (NORTH) 6-D 8 CI
4-45E AVE. D @ BLDG. 7221 6-D 10 CI
4-45N AVE. D @ BLDG. 7221 6-D 6 CI
4-45W AVE. D @ BLDG. 7221 6-D 10 CI
1BCW 1ST ST. @ BLDG. 7040 7-B 10 CI
4216W 1ST ST. @ BLDG. 4216 7-B 8 CI
4-15 1ST ST. @ BLDG. 4311 7-C 10 CI
4-86E 3RD ST. @ BLDG. 7007 7-C 6 CI
4-86N 3RD ST. @ BLDG. 7007 7-C 8 CI
4-86S 3RD ST. @ BLDG. 7007 7-C 8 CI
FL6E FLIGHT LINE @ BLDG. 4216 8-B 8 CI TAPPING SLEEVE @ EX.
MAIN
4-166 1ST ST. @ BLDG. 4218 8-B 8 CI
2BN 2ND ST. (WEST) & AVE. B 8-B 8 CI
2BW 2ND ST. (WEST) & AVE. B 8-B 8 CI
2BE 2ND ST. (EAST) & AVE. B 8-C 10 CI
2BS 2ND ST. (EAST) & AVE. B 8-C 10 CI
2BCN 2ND ST. @ BLDG. 7040 8-C 10 CI
2BCS 2ND ST. @ BLDG. 7040 8-C 10 CI
2BCW 2ND ST. @ BLDG. 7040 8-C 10 CI
23BE AVE. B & SERVICE RD 8-C 10 CI
23BS AVE. B & SERVICE RD 8-C 8 CI
23BW AVE. B & SERVICE RD 8-C 10 CI
23BCN SERVICE RD @ BLDG. 7004 8-C 8 CI
23BCE SERVICE RD @ BLDG. 7004 8-C 8 CI SERVES FIRE PUMP HOUSE
3BE 3RD ST. & AVE. B 8-C 10 CI
3BN 3RD ST. & AVE. B 8-C 6 CI
3BS 3RD ST. & AVE. B 8-C 8 CI
3BW 3RD ST. & AVE. B 8-C 10 CI
4-73 BLDG. 7110 (SOUTH) @ A.W.
TRACK 8-D 6 CI
3-19E AVE. B @ BLDG. 6127 (SOUTH) 9-D 10 CI
3-19N AVE. B @ BLDG. 6127 (SOUTH) 9-D 6 CI
3-19W AVE. B @ BLDG. 6127 (SOUTH) 9-D 10 CI
AREA 11 WATER ISOLATION VALVE SCHEDULE
DESIGNATION GENERAL LOCATION SHEET NO.
GPS LOCATION (1) SIZE IN
INCHES MATERIAL NOTES
LATITUDE LONGITUDE
FL1E MARION RD (SOUTHEAST) 1-C 6 CI TAPPING SLEEVE TO F.H.
FL2E MARION RD @ BLDG. 5270 3-B 6 CI TAPPING SLEEVE @ EX.
MAIN
E1S 1ST ST. & AVE. E-1 3-C 6 CI
2ESE 2ND ST. & AVE. E (SOUTH) 3-C 10 CI
2ESN 2ND ST. & AVE. E (SOUTH) 3-C 8 CI
2ESW 2ND ST. & AVE. E (SOUTH) 3-C 8 CI
23ES AVE. E @ BLDG. 8019 3-D 8 CI
3E1 3RD ST. @ DRAINAGE DITCH 3-D 6 CI NORTH OF DRAINAGE
DITCH
3E2 3RD ST. @ DRAINAGE DITCH 3-D 6 CI SOUTH OF DRAINAGE
DITCH
3E3 3RD ST. @ SOUTH END 3-D 6 CI
FL3E AVE. D-4 @ FLIGHT LINE 4-B 8 CI TAPPING SLEEVE @ EX.
MAIN
FL4E AVE. D-4 @ BLDG. 5201 4-B 6 CI
FL5E AVE. D-3 @ FLIGHT LINE 4-B 6 CI TAPPING SLEEVE @ EX.
MAIN
1D4N 1ST ST. @ BLDG. 5202 4-C 8 CI
1D4S 1ST ST. @ BLDG. 5202 4-C 8 CI
1D4W 1ST ST. @ BLDG. 5202 4-C 8 CI
1D3E 1ST ST. @ BLDG. 5110 4-C 8 CI
1D3S 1ST ST. @ BLDG. 5110 4-C 8 CI
1D3W 1ST ST. @ BLDG. 5110 4-C 6 CI
4-127N NORTH OF BLDG. 5140 4-C 8 CI
4-127S NORTH OF BLDG. 5140 4-C 8 CI
4-128N 2ND ST. @ BLDG. 5140 4-C 8 CI
4-128S 2ND ST. @ BLDG. 5140 4-C 8 CI
4-128W 2ND ST. @ BLDG. 5140 4-C 8 CI
2DEW 2ND ST. @ BLDG. 5142 4-C 6 CI
2DEE 2ND ST. @ BLDG. 8016 4-C 8 CI
2ENN 2ND ST. & AVE. E (NORTH) 4-C 8 CI
2ENS 2ND ST. & AVE. E (NORTH) 4-C 8 CI
2ENW 2ND ST. & AVE. E (NORTH) 4-C 8 CI
3-141E 3RD ST. (WEST) & AVE. E 4-D 10 CI
3-141N 3RD ST. (WEST) & AVE. E 4-D 8 CI
3-141W 3RD ST. (WEST) & AVE. E 4-D 10 CI
4-111E 3RD ST. (EAST) & AVE. E 4-D 10 CI
4-111S 3RD ST. (EAST) & AVE. E 4-D 6 CI
4-111W 3RD ST. (EAST) & AVE. E 4-D 10 CI
3DEN 3RD ST. @ BLDG. 8080 4-D 8 CI
3DES 3RD ST. @ BLDG. 8080 4-D 8 CI
3DEW 3RD ST. @ BLDG. 8080 4-D 6 CI
4-137 AVE. D-2 @ FLIGHT LINE 5-B 8 CI TAPPING SLEEVE @ EX.
MAIN
4-130N 2ND ST. @ NEW BLDG. 5-C 8 CI
4-130S 2ND ST. @ NEW BLDG. 5-C 8 CI
4-130W 2ND ST. @ NEW BLDG. 5-C 8 CI
12D2N AVE. D-2 @ BLDG. 5013 5-C 6 CI
12D2S NORTH OF BLDG. 5162 5-C 8 CI
12D2W NORTH OF BLDG. 5162 5-C 6 CI
1D23E 1ST ST.@ BLDG. 5107 5-C 6 CI
1D23N 1ST ST. @ BLDG. 5107 5-C 6 CI
1D2E 1ST ST. @ AVE. D-2 5-C 8 CI
1D2S 1ST ST. @ AVE. D-2 5-C 6 CI
2D2N 2ND ST. & AVE. D-2 5-C 8 CI
2D2S 2ND ST. & AVE. D-2 5-C 8 CI
2D2W 2ND ST. & AVE. D-2 5-C 8 CI
2DW 2ND ST. @ BLDG. 8032 5-C CI
3DW 3RD ST. @ BLDG. 8008 5-D 6 CI
NOTES:
1. THE CONTRACTOR SHALL SECURE THE SERVICES OF A REGISTERED PUBLIC SURVEYOR
TO DETERMINE THE LOCATION OF ALL NEW VALVES INSTALLED UNDER THIS PROJECT
AND ALL EXISTING VALVES LISTED ABOVE, USING GLOBAL POSITIONING SYSTEM (GPS)
EQUIPMENT AND TECHNOLOGY. THE GPS EQUIPMENT/TECHNOLOGY USED SHALL BE OF
THE "REAL TIME KINEMATICS (RTK) FLOAT POSITIONS" TYPE AND SHALL PROVIDE
ACCURACY OF 20cm-1.0m. EQUIPMENT SHALL CONSIST OF TWO(2) RECEIVER STATIONS
WITH A RADIO LINK. LATITUDE AND LONGITUDE VALUES FOR ALL NEW VALVE LOCATIONS
SHALL BE RECORDED IN THE SPACES PROVIDED IN THE SCHEDULES ON THIS SHEET.
THIS INFORMATION SHALL BE PROVIDED IN THE CONTRACTOR'S RECORD DRAWINGS ("AS
BUILT") SUBMISSION. THE SURVEYOR SHALL PROVIDE AS SIGNED AND SEALED LETTER
ATTESTING TO THE ACCOMPLISHMENT AND ACCURACY OF THIS LOCATION WORK. THIS
LETTER SHALL BE PROVIDED WITH THE COMPLETED SCHEDULES.
2. ANY ADDITIONAL ISOLATION VALVES (NEW OR EXISTING VALVES INDICATED TO REMAIN)
WHICH ARE NOT LISTED IN THIS SCHEDULE, BUT APPEAR ON THE DRAWINGS, SHALL BE
LOCATED AND ADDED TO THIS SCHEDULE.
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
G-10
AREA 1A - BUILDING WATER SERVICE SCHEDULE
FACILITY ORIGIN CATALOG NAME STREET STREET SHEET GPS LOCATION (1) SERVICE AREA NOTES
NUMBER NUMBER NUMBER NAME NUMBER LATITUDE LONGITUDE SIZE
9201 HOSPITAL RD 1A
1A 1A
AREA 8 - BUILDING WATER SERVICE SCHEDULE
FACILITY ORIGIN CATALOG NAME STREET STREET SHEET GPS LOCATION (1) SERVICE AREA NOTES
NUMBER NUMBER NUMBER NAME NUMBER LATITUDE LONGITUDE SIZE
6219 AVENUE B 9E 1-1/2" 8
6220 AVENUE B 9E 2" 8
6220 AVENUE B 9E 6" 8 FIRE SERVICE
6222 AVENUE B 9E 2" 8
6240 4TH ST 9D 3" 8
7206 AVENUE C 7E 2-1/2" 8
7210 4TH ST 7E 2" 8
7298 AVENUE B 9D 1-1/2" 8
7301 4TH ST 8E 2-1/2" 8
7301 4TH ST 8E 2" 8
7301 4TH ST 8E 6" 8 FIRE SERVICE
7302 AVENUE B 8E 8" 8
7312 AVENUE C 7E 2" 8
7316 5TH ST 7F 3" 8
7318 AVENUE D 6E 2" 8
7320 AVENUE D 6E 2" 8
7320 AVENUE D 6E 6" 8 FIRE SERVICE
7339 4TH ST 7E 8" 8
7339 4TH ST 7E 6" 8 FIRE SERVICE
7340 5TH ST 7E 2-1/2" 8
7340 5TH ST 7F 8" 8 FIRE SERVICE
7400 5TH ST 8F 2" 8
7401 5TH ST 8F 2" 8
7402 5TH ST 8F 2" 8
7402 5TH ST 8F 6" 8 FIRE SERVICE
7403 5TH ST 8F 1-1/2" 8
7406 5TH ST 8F 4" 8
7407 5TH ST 7F 3" 8
7407 5TH ST 7F 6" 8 FIRE SERVICE
7409 5TH ST 7F 3" 8
7409 5TH ST 7F 6" 8 FIRE SERVICE
7416 5TH ST 7F 1" 8
7420 5TH ST 8F 1" 8
7421 5TH ST 8F 1" 8
7422 5TH ST 8F 1" 8
AREA 9 - BUILDING WATER SERVICE SCHEDULE
FACILITY ORIGIN CATALOG NAME STREET STREET SHEET GPS LOCATION (1) SERVICE AREA NOTES
NUMBER NUMBER NUMBER NAME NUMBER LATITUDE LONGITUDE SIZE
4111 AVENUE A-3 9B 2" 9
4112 AVENUE A-3 9B 2" 9
4170 AVENUE A-3 9B 6"
4201 AVENUE A-3 9B 2" 9
4225 AVENUE A-3 9B 4" 9
4230 AVENUE A-3 9B 2" 9 EXISTING
6015 2ND ST 8B 2" 9
6030A 3RD ST 10B 6" 9
6030B 3RD ST 10B 3" 9
6030C 3RD ST 9C 2" 9
6030C 3RD ST 9B 6" 9 FIRE SERVICE
9006 RAPCON RD 12B 2" 9
9047 3RD ST 12B 2-1/2" 9
9320 RAPCON RD 12C 1-1/2" 9
9328 RAPCON RD 12D 1-1/4" 9
9328 RAPCON RD 12C 6" 9 FIRE SERVICE
AREA 10 - BUILDING WATER SERVICE SCHEDULE
FACILITY ORIGIN CATALOG NAME STREET STREET SHEET GPS LOCATION (1) SERVICE AREA NOTES
NUMBER NUMBER NUMBER NAME NUMBER LATITUDE LONGITUDE SIZE
4216 1ST ST 8B 3" 10
4216 1ST ST 8B 6" 10 FIRE SERVICE
4217 1ST ST 8B 2" 10
4217 1ST ST 8B 6" 10 FIRE SERVICE
4218 1ST ST 8B 2" 10
4309 1ST ST 7C 2" 10
4311 1ST ST 7C 3" 10
4311 1ST ST 7C 6" 10 FIRE SERVICE
4314 1ST ST 7B 3" 10
4317 1ST ST 7B 6" 10 FIRE SERVICE
5001 1ST ST 6C 6" 10
5003 1ST ST 6C 1-1/2" 10
5003 1ST ST 6C 6" 10 FIRE SERVICE
5004 1ST ST 6C 1-1/2" 10
5005 1ST ST 6C 3" 10
5005 1ST ST 6C 6" 10 FIRE SERVICE
5020 1ST ST 6C 3" 10
6999 2ND ST 8C 8" 10
7000 AVENUE B 8C 6" 10
7002 2ND ST 7C 2-1/2" 10
7002 2ND ST 7C 6" 10 FIRE SERVICE
7004 3RD ST 8C 2" 10
7004 3RD ST 8C 2" 10
7004 3RD ST 8C 8" 10 FIRE SERVICE
7007 3RD ST 7C 4" 10
7008 3RD ST 7C 2" 10
7008 3RD ST 6C 2" 10
7008 3RD ST 6C 1-1/2" 10
7008 3RD ST 6C 2-1/2" 10
7008 3RD ST 6C 8" 10 FIRE SERVICE
7010 3RD ST 7C 1-1/2" 10
7010 3RD ST 7C 8" 10 FIRE SERVICE
7040 2ND ST 7C 6" 10
7101 AVENUE B 8C 4" 10
7104 AVENUE B 8C 4" 10
7104 AVENUE B 8C 6" 10 FIRE SERVICE
7106 AVENUE B 9D 4" 10
7106 AVENUE B 9D 8" 10 FIRE SERVICE
7109 4TH ST 8D 4" 10
7110 4TH ST 8D 2" 10
7115 AVENUE C 8D 2" 10
7115 AVENUE C 8D 4" 10 FIRE SERVICE
7122 AVENUE C 8D 1-1/2" 10
BUILDING WATER SERVICE
VALVE SCHEDULES
NOTES:
1. THE CONTRACTOR SHALL SECURE THE SERVICES OF A REGISTERED PUBLIC SURVEYOR
TO DETERMINE THE LOCATION OF ALL NEW SERVICE VALVES INSTALLED, AND LISTED
ABOVE. SAID LOCATIONS SHALL BE DETERMINED USING GLOBAL POSITIONING SYSTEM
(GPS) EQUIPMENT AND TECHNOLOGY. THE GPS EQUIPMENT/TECHNOLOGY USED SHALL
BE OF THE "REAL TIME KINEMATICS (RTK) FLOAT POSITIONS" TYPE AND SHALL PROVIDE
ACCURACY OF 20cm-1.0m. EQUIPMENT SHALL CONSIST OF TWO(2) RECEIVER STATIONS
WITH A RADIO LINK. LATITUDE AND LONGITUDE VALUES FOR ALL NEW VALVE LOCATIONS
SHALL BE RECORDED IN THE SPACES PROVIDED IN THE SCHEDULES ON THIS SHEET.
THIS INFORMATION SHALL BE PROVIDED IN THE CONTRACTOR'S RECORD DRAWINGS ("AS
BUILTS") SUBMISSION. THE SURVEYOR SHALL PROVIDE A SIGNED AND SEALED LETTER
ATTESTING TO THE ACCOMPLISHMENT AND ACCURACY OF THIS LOCATION WORK. THIS
LETTER SHALL BE PROVIDED WITH THE COMPLETED SCHEDULES.
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
BUILDING WATER SERVICE
VALVE SCHEDULES
G-11
NOTES:
1. THE CONTRACTOR SHALL SECURE THE SERVICES OF A REGISTERED PUBLIC SURVEYOR
TO DETERMINE THE LOCATION OF ALL NEW SERVICE VALVES INSTALLED, AND LISTED
ABOVE. SAID LOCATIONS SHALL BE DETERMINED USING GLOBAL POSITIONING SYSTEM
(GPS) EQUIPMENT AND TECHNOLOGY. THE GPS EQUIPMENT/TECHNOLOGY USED SHALL
BE OF THE "REAL TIME KINEMATICS (RTK) FLOAT POSITIONS" TYPE AND SHALL PROVIDE
ACCURACY OF 20cm-1.0m. EQUIPMENT SHALL CONSIST OF TWO(2) RECEIVER STATIONS
WITH A RADIO LINK. LATITUDE AND LONGITUDE VALUES FOR ALL NEW VALVE LOCATIONS
SHALL BE RECORDED IN THE SPACES PROVIDED IN THE SCHEDULES ON THIS SHEET.
THIS INFORMATION SHALL BE PROVIDED IN THE CONTRACTOR'S RECORD DRAWINGS ("AS
BUILTS") SUBMISSION. THE SURVEYOR SHALL PROVIDE A SIGNED AND SEALED LETTER
ATTESTING TO THE ACCOMPLISHMENT AND ACCURACY OF THIS LOCATION WORK. THIS
LETTER SHALL BE PROVIDED WITH THE COMPLETED SCHEDULES.
AREA 11 - BUILDING WATER SERVICE SCHEDULE
FACILITY ORIGIN CATALOG NAME STREET STREET SHEET GPS LOCATION (1) SERVICE AREA NOTES
NUMBER NUMBER NUMBER NAME NUMBER LATITUDE LONGITUDE SIZE
5013 AVENUE D-2 5C 1-1/2" 11
5014 AVENUE D-2 5C 6" 11
5015 AVENUE D-2 5B 2" 11
5016 AVENUE D-2 5B 2" 11
5101 AVENUE D-2 5B 2" 11
5102 AVENUE D-2 5B 2" 11
5105 1ST ST 5B 2-1/2" 11
5108 1ST ST 5B 3" 11
5110 1ST ST 4C 3" 11
5110 1ST ST 4C 8" 11 FIRE SERVICE
5111 1ST ST 4C 2-1/2" 11
5112 1ST ST 4C 3" 11
5114 AVENUE D-4 4C 2" 11
5115 AVENUE D-4 4B 2" 11
5138 1ST ST 4C 8" 11
5140 1ST ST 4C 6" 11 FIRE SERVICE
5142 1ST ST 4C 8" 11
5162 1ST ST 5C 2-1/2" 11
5162 1ST ST 5C 8" 11 TANK SERVICE
5201 AVENUE D-4 4B 2" 11
5202 AVENUE D-4 4C 2" 11
5204 AVENUE E-1 3C 2-1/2" 11
5204 AVENUE E-1 3C 6" 11 FIRE SERVICE
5270 AVENUE E-1 3C 1-1/2" 11
8006 3RD ST 5D 2-1/2" 11
8007 3RD ST 5D 2" 11
8007 3RD ST 5D 6" 11 FIRE SERVICE
8008 3RD ST 5D 2" 11
8008 3RD ST 5D 6" 11 FIRE SERVICE
8011 3RD ST 5D 1-1/2" 11
8014 3RD ST 4D 1-1/2" 11
8015 3RD ST 4D 3" 11
8015 3RD ST 4D 6" 11 FIRE SERVICE
8015 3RD ST 4C 4" 11
8016 AVENUE E 4C 6" 11
8019 AVENUE E 4D 2" 11
8019 AVENUE E 4D 6" 11 FIRE SERVICE
8020 3RD ST 3D 1-1/2" 11
8030 2ND ST 5C 2" 11
8030 2ND ST 5C 2" 11
8031 2ND ST 5C 2" 11
8031 2ND ST 5C 6" 11 FIRE SERVICE
8032 2ND ST 5C 1-1/2" 11
8040 2ND ST 3C 2" 11
8040 AVENUE E-1 3C 8" 11 FIRE SERVICE
8042 2ND ST 3C 2" 11
8045 AVENUE E-1 3C 8" 11 FIRE SERVICE
8080 3RD ST 4D 2" 11
3RD ST 3D 1-1/2" 11 SERVICE SHOP
2ND ST 5C 6" 11 WEST OF 8007
PARTIAL UTILITY PLAN
SCALE: 1" = 50' - 0"
REPAIR CRITICAL
WATER MAINS
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
PARTIAL UTILITY PLAN
12-K
AREA 1A
KEY MAP
A
B C D E F G H I J KZY
9-18
9-19
9-20
9-21
W
A
T
I
R
R
I
R
R
6-9
P.I.V.
6-7
12"
12" A.C.
W
A
T
6-6
W A
T
12"
12"
2"
WAT
6"
P.I. VALVE
WAT
6" A.C.
F 6"
6-4A
6-5
W A
T
W
A
T
9-20
9-19
6-2C
EX. ABOVE GRADE
BACKFLOW
PREVENTER VAULT
WATER METER
IN BELOW
GRADE VAULT
EX. BACKFLOW
PREVENTER
A
E
R
3 50 1
A
E
R
S
L
P
A
E
R
R
P
R
C
HOSPITAL ROAD
N
G
N
G
N
G
N
G
6"
10" V C
10.00"V C
S
S
S
S
S
S
S
S
S
S
9-11
9-8
9-9
S
S
S
S
A
B
N
D
W
T
A
B
N
T
C
A
B
N
T
C O
M
COM
W A
T
C
O
M
COMC
O
M
C
O
M
C O
M
C
O
M
C
O
M
N
G
N
G
C
O
M
COM
U
E
U
E
UE
O
M
U E
UE
UE
U E
U E
S
W
S W
O E
S W
6" AC
S
W
O E
O
E
O
E
O
E
O
E
N
G
A B
N D
W
A T
W A
T
6"
MH #9-9
RIM 1743.00
INV 1737.62
MH #9-10
RIM 1747.28
INV 1738.60
MH #9-11
RIM 1747.72
INV 1739.41
MH #9-8
RIM 1747.12
INV 1736.47
W A
T
6"
6N2
6"
C
O
M
6"
S
MATCH LINE, SHEET 13-K
NOTES INDICATED BY NUMBER IN :
1. REMOVE AND REPLACE SIDEWALK. REFER TO DETAIL 4/D-2.
2. INTERCEPT EXISTING SERVICE AND CONNECT NEW SERVICE TO EXISTING
SERVICE.
3. NEW TAPPING SLEEVE CONNECTION TO EXISTING 12" MAIN. REFER TO
DETAIL 1/D-3.
4. "TEE" THRUST BLOCK. REFER TO DETAIL 5/D-1.
5. INTERCEPT EXISTING 6" WATER LINE AT EXISTING VALVE 6-9 AND INSTALL
COUPLING ADAPTER, 45° ELBOW, ETC. AS REQUIRED TO CONNECT NEW 6"
LINE TO EXISTING 6" LINE.
6. 45° M.J.
7. EVERY PIPE JOINT BETWEEN WITHIN THIS SPAN SHALL HAVE A RESTRAINT
HARNESS OR BE OF THE RESTRAINT JOINT TYPE.
8. ALL JOINTS IN THIS LINE SHALL HAVE RESTRAINT HARNESS OR BE OF THE
RESTRAINT JOINT TYPE.
9. TAKE ALL MEASURES REQUIRED TO PROTECT AND MAINTAIN AT/FP WALL
WHEN INSTALLING NEW WATER LINE AND CASING UNDER WALL. REFER
TO DETAIL 3/D-9.
10. DISCONNECT EXISTING WATER LINE AT EXISTING "TEE" AND PROVIDE
BLIND FLANGE AT "TEE" OUTLET.
11. INSTALL CASING AT SUCH DEPTH AS REQUIRED FOR CASING TO BE
BELOW THE EXISTING WATER LINE.
12. PROVIDE SHORT SOLID SLEEVE M.J. FITTING WITH THRUST RESTRAINT
GLAND ON ONE END ONLY TO ALLOW REQUIRED DEFLECTION IN PIPING
ALIGNMENT.
13. ALL JOINTS FROM THIS POINT TO THE NEW TAPPING SLEEVE AT VALVE 6N2
SHALL HAVE RESTRAINT HARNESS OR BE OF THE RESTRAINT JOINT TYPE.
14. REMOVE EXISTING VALVE, VALVE BOX, AND RELATED WORK. REFER TO
DETAIL 2/D-3.
12-K D-5
SIM.
12-K D-2
12-K D-5
SIM.
12-K D-3
REPAIR CRITICAL
WATER MAINS
BASE CIVIL
ENGINEER
CHIEF OF
ENGINEERING
CHIEF OF
DESIGN
CEO
GROUND
SAFETY
COMMUNICATIONS
BIOENVIRONMENTAL
ENGINEER
SECURITY
POLICE
WTA, INC.
CONSULTING ENGINEERS
WTA 13093
LGT
LGT
BDW 4-30-2014
FIRE CHIEF
CONSTRUCTION
MANAGEMENT
CORROSION
ENGINEER
CEV
USING AGENCY
USING AGENCY
USING AGENCY
THIS IS A GEO-REFERENCED
DRAWING
FNWZ 12-0097
04/30/2014
PARTIAL UTILITY PLAN
13-K
KEY MAP
A
B C D E F G H I J KZY
AREA 1A
9-16
9-15
9-14
6" AC
W
A
T
W A
T
WAT
WAT
W A
T
W A
T
W
A
T
W
T
A
C
6" AC
6-3
AER
P1
P
M
9-665
9-667
A E
R
A
P
A E
R
9-663
9-669
M
R
V
C
S
S
S
S
S
S
9-12
COM
C
O
M
COM
C
O
M
C
O
M
C
O
M
C O
M
C O
M
S
U E
O E
OE
U
E
OE
U E
UE
U E
U E
U
E
O E
ASPHALT ACCESS ROAD
HC
S
S
4"
S
1-1/2"
4"
6"
4"
S
S
S
U
S
T
V
U
T
V
1-1/2"
1-1/4"
4"
4"
U
E
S
E U
E S
E U
E S
E U
E S
E U
E S
SERVICE BUILDING
H O
S P
I T
A L
R
O A
D
H O
S P
I T
A L
R
O A
D
U
E
S
ELECT.
PAD
U
A
T
V
U
E
S
U
E
P
U
E
S
U
E
P
U
E
P
U
T
V
U
T
V
U
T
V
U
T
V
M
U
E
S
6"
S
S
S
S
S
S
S
4"
N1
N2
N3
N4
N5
N6
C1
C2
C3
C4
C5
C6
S1
S2
S3
S4
S5
S6
3"
1-1/2"
4"
1-1/2"
1-1/2"
1-1/4"
4"
1-1/4"
4"
S
2"
2"
6"
2"
6" 6"
1"
PAD MTD.
XFMR "A"
3"
C A
T V
2-1/2"
U
T
V
2"
1-1/4"
1-1/4"
1-1/4"
U
E
S
C A
T V
6"
SW
S
W
S
W
O
E
O
E
9-13
S
S
S
EX. BACKFLOW
PREVENTER
W A
T
W A
T
6"
6"
6"
6"
9-14
6"
9-15
6"
9-16
EX. MH
RIM 1744.20
INV 1739.80
EX. MH
RIM 1743.80
INV 1740.50
EX. MH
RIM 1746.50
INV 1741.60
WAT
WAT
W
A
T
W
A
T
W
A
T
W A
T
6"
6"
6"
6NW
6S
6N1
6W
MATCH LINE, SHEET 12-K
NOTES INDICATED BY NUMBER IN :
1. REMOVE EXISTING VALVE, VALVE BOX, AND RELATED WORK. REFER TO
DETAIL 2/D-3.
2. NOT USED.
3. REMOVE FIRE HYDRANT AND RELATED WORK REFER TO…
This is the start of the file's text. The full file is on GovTribe.