Material Submittal Revision 1

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

JFSD201636

PROJECT TITLE

Repair Airfield Pavements Basic Contract

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

IN

E N

U M

B E

R

ITEM DESCRIPTION,

CONTRACT

REFERENCE, TYPE

OF SUBMITTAL

PR

O

O F

O F

C O

M

PL

IA

N

C

PR

O

C E

D U

R E

S

SH

O

P D

R A

W

IN

G S

M

FG

D A

T A

R T

IF

IC

A T

E S

R E

C O

M M

E N

D A

IO

ST

D

A

G U

A R

A N

T E

E S

SA

M

PL

E

S

R E

Q U

IR

E

D D

A

F

SU

B

M

IS

SI

N

D

T E

R E

C E

IV

N T

R A

C T

IN

T E

T O

C

IV

IL

G

IN

E E

R

IN

T U

R N

S U

SP

E

SE

SU

B

M

IT

T

U

M B

DATE CONTRACTOR

NOTIFIED

N T

R A

C T

SU

B M

IT

T

IA

L

FI

A

N L

A

PP

R O

V

REMARKS

APPROVED

DISAPPROVED

1. 01000; 4.1, AF Form 103, Work Clearance Request

X

2. 01000; 5.2, Utility Outage Request

X

3. 01000; 7.2.1, Project Site Plan

X

4. 01000; 7.2.2, Dirt & Dust Control Plan

X

5. 01000; 7.2.3, Health & Safety Plan

X

6. 01000; 10.1, Contractor Personnel Requirements

X

7. 01000; 12.5, Photographs X

8. 01000; 12.6, Project Schedule

X

9. 01000; 12.7.1, Redline Markup Drawings

X

10. 01000; 12.7.3, Final As-builts

X

11. 01000; 12.8, DD1354, Real Property Record

X

12. 01000; 13.4, Preconstruction Survey

X

13. 01000; 13.5, Storm Water Protection Plan

X X

14. 01000; 13.6 & 13.8, Waste Disposal & Spill Control Plan

X

15. Not Used

16. Not Used

17. Not Used

18. 01000; 13.16, EMSA

Training

X

19. Not Used

20. 01000; 14, Contractors Quality Control Plan

X

21. 01000; 16.4.1, Visitor

Passes X

22. 02 41 00; 1.2.1, Demolition Plan

X

23. 32 01 19.61; 1.6, & 32 17

23.00 20; 1.5 Equipment List

X

24. 32 01 19.61; 2.1, 3.2.1, 3.2.2, 3.2.3, & 3.2.4 Sealants

X

25. 32 01 19.61; 2.1.1, 2.1.2,

2.1.3 Sealant, Primer, Blocking Media

X

26. 32 01 29.61; 1.2 Various,

1.3.1 Mix Design

X X X X

27. 32 11 16.16; 2.1, 2.2.1, 3.3, 3.4.1, 3.4.2.1, 3.4.2.2, 3.4.2.4, 3.4.2.5 Aggregates, Geotextile, Density Tests, Thickness, X X X

28. 32 12 15.13; 1.2, 1.3, 3.16,

3.20 Hot Mix Asphalt, Various to include Job mix formula, etc.

X X X X

29. 32 13 11; 1.4, 1.5.1, 1.5.2, 1.5.3, 1.5.4.1, 1.5.4.2, 2.1.3.1, 2.1.3.2, 2.2.1.1, 2.2.1.2, 2.2.1.3, 2.2.2.1, 2.2.3.1, 2.3, 2.4, 2.8.1, 2.9, 2.11.1, 2.12.2, 3.12.2 Concrete Pavement for Airfields – Various To Include Mix Design

30. 32 17 23.00 20; 1.2, 2.1.1, 2.1.3, 2.1.4, X X X X

31. 32 01 19.61, 1.2, Product

Data – Joint Sealant X X

32. 32 01 29.61, 1.2, Mix Design, Test Reports, Etc., See Listing

X X X X

33.

34.

35.

36.

37.

38.

39.

40.

X X X X

SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT MANAGER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
DATE
SAMPLES
MFG DATA
TEST DATA
SUBMITTAL NUMBER
REMARKS
GUARANTEES
PROCEDURES
CERTIFICATES
ENGINEERING
DATE TO CIVIL
CONTRACTING
DATE RECEIVED
REQUIRED DATE OF
SHOP DRAWINGS
RECOMMENDATION
RETURN SUSPENSE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SUBMISSION
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

File details come from the government source that posted it.