JGAR200345 Material Submittal Schedule.pdf

PDF 11 KB Posted

Attached to
Repair Secondary South Sewer Lagoon Federal contract opportunity
Solicitation number
FA4659-12-R-0013
Issued by
Department of the Air Force Air Mobility Command

About this file

External Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Repair Secondary South Sewer Lagoon, newest first.
File Type Posted
Lagoon Transfer Piping.TIF TIF image
Structure3.JPG JPG image
Structure1.JPG JPG image
Revised specifications.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Lagoon Transfer Structure-C-27.TIF TIF image
Amendment 0002.pdf PDF
Lagoon Transfer Structure Layout.TIF TIF image
Lagoon Transfer Structure-C-12.TIF TIF image
Addendum - Quantity Information 080912.pdf PDF
Structure2.JPG JPG image
Question and Answers Sewer Lagoon.pdf PDF
Amendment 0001.pdf PDF
JGAR200345 DRAWINGS.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment 3 - Climatological Data.pdf PDF
FA4659-12-R-0013.doc.pdf PDF
Solicitation Cover Letter.doc.pdf PDF
Financial Institution Reference Sheet.doc DOC document
JGAR200345 SPECIFICATIONS.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

JGAR200345

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 4

4 Project Site Plan. Sec. 01000, Para. 7.2.1 4

5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

7 Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2 4

8 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

9 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para.

12.6.1 4

10 Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para. 12.6.2.1 4

11 Final As-Built Drawings. Sec. 01000, Para. 12.8 1

12 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4

13 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 4

14 Storm Water Protection Plan. Sec. 01000, Para. 13.5 4

15 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 13.6.2 4

16 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

17 Dust Control Plan. Sec. 01000, Para. 13.7 4

18 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

19 Spill Control Plan. Sec. 01000, Para. 13.12 4

20 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

21 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

22 O & M Manuals. Sec. 01000, Para. 16 3

23 Sec. 01000, Affirmative Procurement Report Form 4

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D

A

TA

C E

R

TI

FI

C

A

TE

S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

REPAIR SEWAGE LAGOON - SECONDARY

SOUTH - GRAND FORKS AFB, ND FA4659-09-D-A003

156-012 01000-1

PROJECT NO.

JGAR200345

APPROVED DISAPPROVED

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D

A

TA

C E

R

TI

FI

C

A

TE

S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

REPAIR SEWAGE LAGOON - SECONDARY

SOUTH - GRAND FORKS AFB, ND FA4659-09-D-A003

24 Materials Testing 4 02205

25 Aggregate Gradation Report 4 02207

26 Rip Rap Gradation Report 4 02275

27 Access Hatch Shop Drawings 4 02607

28 Concrete Covers 4 02607

29 Post Indicator Valves 4 02710

30 Flanges 4 02710

31 Stainless Steel Bolts 4 02710

32 Gate Valves 4 02710

33 Handwheel Adjustable Stem Guide Shop Drawings 4 02710

34 Fencing Supplier and Product Information 4 4 02831

35 Fence Signs Submittals 4 02831

36 Seed Mix 4 02936

Y\156_010\DOCUMENTS\SPECS\01000 PART 2.xls NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

156-012 01000-2

File details come from the government source that posted it. Updated .