Repair Secondary South Sewer Lagoon Federal contract opportunity
Solicitation number
FA4659-12-R-0013
Issued by
Department of the Air Force Air Mobility Command

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Repair Secondary South Sewer Lagoon, newest first.
File Type Posted
Revised specifications.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Lagoon Transfer Structure-C-27.TIF TIF image
Amendment 0002.pdf PDF
Addendum - Quantity Information 080912.pdf PDF
Structure2.JPG JPG image
Question and Answers Sewer Lagoon.pdf PDF
Lagoon Transfer Structure Layout.TIF TIF image
Lagoon Transfer Structure-C-12.TIF TIF image
Lagoon Transfer Piping.TIF TIF image
Structure3.JPG JPG image
Structure1.JPG JPG image
Amendment 0001.pdf PDF
JGAR200345 Material Submittal Schedule.pdf PDF
Solicitation Cover Letter.doc.pdf PDF
Financial Institution Reference Sheet.doc DOC document
JGAR200345 SPECIFICATIONS.pdf PDF
JGAR200345 DRAWINGS.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment 3 - Climatological Data.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2A3E12156A001

1. The contractor shall furnish all labor, materials, equipment, supplies, and supervision necessary to complete JGAR 200345, Maintain

Sew age Lagoon - Secondary South in strict accordance w ith the construction documents.

2. Contractor must be registered in the Central Contractor Registration (CCR) database to be eligible to receive an aw ard under this solicitation.

3. Magnitude of this project is betw een $1,000,000 and $5,000,000.

4. This acquisition is 100% set-aside for Small Businesses.

5. The NAICS for this project is 237110 w ith a small business size standard of $33,500,000.

6. A w inter exclusion period of 15 Oct - 1 May applies to this project.

7. This project is subject to the bona fide need rule. See Section H, paragraph h-6 for details.

8. Faxed offers w ill not be accepted in response to this solicitation.

NOTICE TO OFFERORS: Funds are not presently available for this project. No aw ard w ill be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation/RFP either before or after the bid opening/RFP closing date.

ELIZABETH A. SQUIRES 701-747-6103

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Jul-2012

(RFP)

(IFB)

X

CALL:

Maintain Sew age Lagoon - Secondary South

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 Aug 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

319 CONTRACTING FLIGHT

575 TUSKEGEE AIRMEN BLVD

GRAND FORKS AFB ND 58205 6436

FA4659

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

JGAR 200345

8. ADDRESS OFFER TO (If Other Than Item 7)

(701) 747-4215FAX:TEL: (701) 747-5287 TEL: FAX:

FA4659-12-R-0013 40

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4659-12-R-0013

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum Maintain Sewage Lagoon - Secondary South

FFP

The contractor shall furnish all labor, materials, equipment, supplies and supervision necessary to complete the repair of liner slippage issues associated with the south secondary lagoon cell of the Grand Forks Air Force Base wastewater lagoon system which is comprised of one (1) primary treatment lagoon, two (2) secondary lagoons, and one (1) tertiary lagoon in accordance with drawings and specifications.

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E12156A001

SIGNAL CODE: A

NET AMT

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 120 dys. After receipt of notice to proceed

1 319 CES/CEC - F2A3E1

DAN LEMLER

575 TUSKEGEE AIRMEN BLVD, BLDG

410, RM 15

GRAND FORKS AFB ND 58205-6219

701-747-4781

FOB: Destination

F2A3E1

52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

WAWF

WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)

ELECTRONIC RECEIVING REPORT AND INVOICING INSTRUCTIONS

IN ACCORDANCE WITH DFARS 232.7002, USE OF ELECTRONIC PAYMENT REQUESTS IS

MANDATORY. USE OF WAWF WILL SPEED UP YOUR PAYMENT PROCESSING TIME AND

ALLOW YOU TO MONITOR YOUR PAYMENT STATUS ONLINE. THERE ARE NO CHARGES OR

FEES TO USE WAWF.

Requests for payments must be submitted electronically via the Internet through the Wide Area WorkFlow – Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil.

Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS)

Dayton/Omaha at (800) 330-8168 or faxed to (800) 554-0527. Please have your order number and invoice number ready when contacting DFAS about payment status. You can also access payment information using the DFAS

Vendor Pay Inquiry System (VPIS) web site at http://www.dfas.mil/money/vendor.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR RECEIVING REPORTS,

INVOICES AND ADDITIONAL E-MAILS CORRECTLY THROUGH WAWF.

CONTRACT NUMBER: FA4659-12-C-CXXX

TYPE OF DOCUMENT: Construction Invoice

CAGE CODE: Vendor Cage Code

ISSUE BY DODAAC: FA4659

ADMIN DODAAC: FA4659

INSPECT BY DODAAC: N/A

SERVICE ACCEPTOR / SHIP TO: BPN Number – F2A3E1

LOCAL PROCESSING OFFICE: N/A

PAY OFFICE DODAAC: F67100 (DFAS)

SEND MORE E-MAIL NOTIFICATIONS:

CONTRACT ADMINISTRATOR: Elizabeth.squires@us.af.mil

CONTRACTING OFFICER: Jeremiah.snedker@us.af.mil

ADDITIONAL NOTIFICATION:

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

SPECIAL CONTRACT REQUIREMENTS

H-1. REQUIRED INSURANCE (IAW FAR 28.306(b))

Reference FAR 52.228-5, Insurance-Work on a Government Installation, the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.

c. Automobile Liability Insurance. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. This policy shall provide for bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract.

Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $25,000 per occurrences for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

H-2. FEDERAL HOLIDAYS

The following Federal Legal holidays are observed by this base:

New Year's Day 1 January

Martin Luther King's Birthday Third Monday in January

Presidents Days Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

H-3. PERFORMANCE AND BID REQUIREMENTS (IAW FAR 28.101-2(b) and 28.102-2)

a. A bid guarantee is required with the proposal. The offeror shall submit a bid guarantee in the form of a firm commitment, e.g., bid bond (Standard Form 24) supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or under

Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return any bid guarantee, other than bid bond, to the successful offeror upon execution of contractual documents and bond (including any necessary coinsurance or reinsurance agreements) as required by the bid as accepted.

b. The amount of the bid guarantee shall be 20% of the bid price or $3 million whichever is less.

c. If the successful bidder (offeror), upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder (offeror), the contracting officer may terminate the contract for default.

d. In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its offer and the bid guarantee is available to offset the difference.

e. Performance and Payment Bonds. In accordance with the Miller Act (40 U.S.C. 2701-270f), the bidder to whom award is made shall, within twenty (20) calendar days after the date of award, furnish a performance bond

(Standard Form 25) and a Payment Bond (Standard Form 25a), each with good and sufficient surety or sureties acceptable to the Government.

(1) Performance Bond: The penal sum of the performance bond shall equal one hundred percent (100%) of the contract price.

(2) Payment Bond:

(i) The penal sum shall be one hundred percent (100%) of the contract price.

(ii) If the contract price increases, and additional amount equal to 100 percent of the increase.

f. The contractor will not be issued a Notice to Proceed or be allowed to start work prior to furnishing the requested bond, including any necessary insurance agreements.

H-4. PREPARATION OF PROGRESS SCHEDULE AND REPORTS

The reports contemplated by the clause titled, "Schedules for Construction Contract" shall be accomplished on and in accordance with instructions pertaining to the Contract Progress Schedule and the Contract Progress Report.

H-5. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause herein entitled "Material and Workmanship" shall be accomplished on and in accordance with instruction pertaining to AF Form 3000, Material Approval Submittal.

H-6. BONA FIDE NEED

This contract is subject to the bona fide need rule pursuant to 31 U.S.C Section 1502 (a). As such, the contractor must perform work or expend effort that is specified in the contract and for which payment will be made under the terms of the contract. Planning, scheduling, obtaining of bonds and other efforts is not considered evidence of performance. Ordering of materials cannot qualify if it is beyond moving of supplies or material, which are already in inventory. To be considered, materials specifically for use on the contract, the contractor must have actually incurred an obligation or made a payment to a supplier. Mobilization and on-site progress are evidence of performance for the bona fide need purposes.

H-7. TRAFFIC ENFORCEMENT OF SEAT BELT USE AND PROHIBITION OF CELLULAR PHONES

Use of a cell phone or other hand-held electronic device without a hands-free capability or a failure to wear restraints by any vehicle occupant will be reason for a ―primary stop‖ on Grand Forks AFB. 319 SFS personnel will issue the operator/passenger a DD Form 1408, Armed Forces Traffic Ticket, for these infractions.

H-8. BASE ENTRY PROCEDURES

Visitor Passes: The Commercial Visitor Control Center will issue a Visitor Pass to the contractor and his/her employees upon completion of the screening process. Visiter Passes are for a maximum of one year and may be renewed on a yearly basis. The screening process takes time, and the contractor shall submit a SFS Form 74 for each employee no later than 5 days prior to the day base entry is needed. The SFS Form 74 may be obtained by contacting the Contract Administrator.

Employees that do not meet the minimum requirements will be denied base entry. The minimum requirements are posted at the Commercial Visitor Control Center. The employer of the denied employee may appeal the denial by contacting the Commercial Visitor Control Center.

Approved Visitor Passes must be picked up within 2 weeks of issuance. All Visitor Passes that are not picked up within 2 weeks will be destroyed. Employees whose passes are destroyed must resubmit the paperwork to reobtain base entry.

Although contractors will not be issued vehicles passes vehicles are subject to search while on the installation.

Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. Company vehicles will be allowed access to restricted/controlled areas.

All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident.

Conduct Requirements: The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.

Information Protection: The security manager for the Sponsoring unit (i.e LRS, CE ect.) will determine individual requirements for contractor personnel to have a background check.

If a National NACI is determined to be required by the security manager, the security manager will coordinate the check with the wing Information Security Office.

Anti-Terrorism: The anti-terrorism manager for the Sponsoring unit (i.e LRS, CE ect.) will determine individual requirements for contractor personnel to have a Level 1 Anti-Terrorism Training.

The Level 1 Anti-Terrorism training is recommended for all key management personnel, crew supervisors, project managers and site superintendents. Unit anti-terrorism managers will be responsible for organizing this Level 1 training.

Section I - Contract Clauses

52.202-1 Definitions JAN 2012

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 Central Contractor Registration FEB 2012

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

FEB 2012

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

DEC 2010

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

FEB 2012

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997

52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data--

Modifications

OCT 2010

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns JAN 2011

52.219-14 Limitations On Subcontracting NOV 2011

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification JAN 2009

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

MAY 2012

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.228-1 Bid Guarantee SEP 1996

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995

52.228-14 Irrevocable Letter of Credit DEC 1999

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes APR 2003

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.232-17 Interest OCT 2010

52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984

52.232-27 Prompt Payment for Construction Contracts OCT 2008

52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration

OCT 2003

52.233-1 Disputes JUL 2002

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Items DEC 2010

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A Central Contractor Registration Alternate A SEP 2007

252.204-7006 Billing Instructions OCT 2005

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2006

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010

252.223-7001 Hazard Warning Labels DEC 1991

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.223-7008 Prohibition of Hexavalent Chromium MAY 2011

252.225-7012 Preference For Certain Domestic Commodities JUN 2010

252.227-7023 Drawings and Other Data to become Property of Government MAR 1979

252.227-7033 Rights in Shop Drawings APR 1966

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

MAR 2008

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment MAR 1998

252.247-7023 Transportation of Supplies by Sea MAY 2002

252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after issuance of notice to proceed.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $438.61 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2012)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and

Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the

Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in

ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 237110- assigned to contract number .

(Contractor to sign and date and insert authorized signer's name and title).

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of ―recovered material.‖

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall--

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to 319 CONF/LGCA

Attn: Jeremiah Snedker

575 Tuskegee Airmen Blvd., Bldg 418

Grand Forks AFB, ND 58205-6436

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty

(whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information..

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(b) Weather conditions . . . . . . . . See climatological data ( External Attachment 3)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil https://www.acquisition.gov/FAR/

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chp

2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

http://farsite.hill.af.mil/

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

See Section J

5352.201-9101 Ombudsman.

As prescribed in 5301-9103, insert the following clause:

OMBUDSMAN (APR 2010)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM or

AFISRA ombudsmen, Mr. Gregory S. Oneal, HQ AMC/A7K, 507 Symington Drive, Scott AFB IL 62225-5022,

(618) 229-0267, fax (618) 256-6668, email: gregg.oneal@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU or ARISRA level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS)

(Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.242-9000 Contractor access to Air Force installations.

As prescribed in 5342.490-1, insert a clause substantially the same as the following clause in solicitations and contracts:

CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUG 2007)

(a) The contractor shall obtain base identification and vehicle passes for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5301.htm#TopOfPage http://www.whitehouse.gov/omb/circulars/a076/a76_rev2003.pdf mailto:michael.jackson@scott.af.mil http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5342.htm#P35_354 wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and SFS/SFA Form 74 to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel

Security Program Management, as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

PKI CERTIFICATE

NOTICE TO OFFERORS

As of November 1, 2006 a DoD PKI Certificate is required to access CPARS

Contractor Performance Assessment Reporting System (CPARS)

Any user accessing private Department of Defense (DoD) web sites must have a DoD Public Key Infrastructure

(PKI) certificate to access the site. CPARS is a private DoD web site, therefore all DoD employees (military and civilian), including DoD contractors that are working on site (military/government facilities) or contractors working offsite using Government Furnished equipment (GFE) are eligible to obtain certificates from DoD PKI. If the contractor doesn’t work onsite or with GFE, they will need to obtain certificates from an External Certificate

Authority (ECA).

External Certificate Authorities (ECAs) and Interim External Certificate Authorities (IECAs) provide digital certificates to the DoD’s private industry partners, contractors using their own equipment or working in non-government facilities, allied partners, and other agencies.

Approved ECA Vendors:

Operational Research Consultants, Inc. (ORC) http://www.eca.orc.com

Verisign, Inc. http://www.verisign.com/verisign-business-solutions/public-sector-solutions/ieca-eca-certificates/index.html

Approved IECA Vendor:

Digital Signature Trust Co. (DST) http://www.digsigtrust.com/federal/dod.html

Additional information on the subject of ECA can be found at:

http://iase.disa.mil/index2.html http://www.e-publishing.af.mil/search.asp?keyword=AFI+31-101&Go.x=8&Go.y=10 http://www.e-publishing.af.mil/pubfiles/af/31/afi31-501/afi31-501.pdf http://www.eca.orc.com/ http://www.verisign.com/verisign-business-solutions/public-sector-solutions/ieca-eca-certificates/index.html http://www.verisign.com/verisign-business-solutions/public-sector-solutions/ieca-eca-certificates/index.html http://www.digsigtrust.com/federal/dod.html http://iase.disa.mil/index2.html

Section J - List of Documents, Exhibits and Other Attachments

SECTION J-LIST OF ATTACHEMENTS

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

J-1 ITEM # of Pages

1. Wage Decision ND120016 dated 01/06/2012 4

2. Schedule of Drawings 1

3. Waiver Green Procurement Form 1

LIST OF EXTERNAL ATTACHMENTS

1. Technical Specifications 139

2. Drawings 25

3. Climatological Data 6

4. Material Submittal Schedule 2

5. Past Performance Questionnaire 5

6. Financial Institution Questionnaire 1

INTERNAL ATTACHMENT 1

General Decision Number: ND120016 01/06/2012 ND16

Superseded General Decision Number: ND20100016

State: North Dakota

Construction Type: Heavy Sewer and Water Line

Counties: Burleigh, Cass, Grand Forks and Morton Counties in

North Dakota.

HEAVY CONSTRUCTION (Water and Sewer Lines only)

Modification Number Publication Date

0 01/06/2012

* ENGI0049-036 10/01/2011

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 22.75 12.85

GROUP 2.....................$ 21.85 12.85

GROUP 3.....................$ 21.60 12.85

GROUP 4.....................$ 21.45 12.85

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: All Cranes 60 tons and over, Cranes doing piling, sheeting, dragline/clamwork, Derrick (Guy & Stiff), Gentry

Crane Operator, Helicopter Operator, Mole Operator or

Tunnel Mucking Machine, Power Shovel 3-1/2 CY. and over and

Traveling Tower Crane.

GROUP 2: All Cranes 21 tons and up to 59 tons, BacKhoe

Operator 3 CY. and over, Creter Crane, Dredge Operator 12'' and Over, Equipment Dispatcher, Finish Motor Grader, Front

End Loader Operator 8 CY. and over, Master Mechanic - when supervising 5 or more Mechanics, Mon-o-rail Hoist Operator, Power Shovel up to and including 3-1/2 CY. and tugboat.

GROUP 3: Cranes 20 tons and under, Asphalt Paving Machine

Operator, Asphalt Plant Operator, Automated Grade Trimmer, Backhoe Operator over 1 CY. up to and including 2-1/2 CY., Boom Truck hydraulic (8 Tons & over), Cableway Operator, Concrete Batch Plant Operator (electronic or manual), Concrete Mixer Paving Machine Operator, Concrete Paver

(Bridge Decks), Concrete Pump, Concrete Spreader Operator &

Belt Placer, Crushing Plant Operator, Dozer Operator, Dredge Operator or Engineer 11'' and under, Drill Rigs, Heavy Duty Rotary or Chum or Cable Drill, Front End

Loader(3-1/2 CY. up to and including 7-1/2 CY.), Gravel

Washing & Screening Plant Operator, Locomotive, all types, Mechanic or Welder (heavy duty), Motor Grade Operator, Pavement Breaker (Non-Hydro Hammer type), Pipeline

Wrapping,Cleaning & Bending Machine Operator, Power

Actuated Auger and Horizontal Boring Machine Operator 6'' and over, Refrigeration Plant Engineer, Roto Milling

Machine (Surface Planer) 43'' & over, Scraper Operator, Slip Form Concrete Paving Operator, Tandem Pushed Quad 9 or similar, Tractor with Boom Attachment, Trenching Machine over 100 HP.

GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person, Asphalt Paving Screed Operator, Backhoe- up to and including 1/2 CY., Console Board Operator, Distributor

Operator (Bituminous), Forklift Operator, Front End Loader-

1-1/2 CY. up to and including 3 CY., Grade Person, Gravel

Screening Plant Operator (not Crushing or Washing), Greaser, Lazer-Screed Operator,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .