Addendum to Estimated Quantitys
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised specifications.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| Lagoon Transfer Structure-C-27.TIF | TIF image | |
| Amendment 0002.pdf | ||
| Structure2.JPG | JPG image | |
| Question and Answers Sewer Lagoon.pdf | ||
| Lagoon Transfer Structure Layout.TIF | TIF image | |
| Lagoon Transfer Structure-C-12.TIF | TIF image | |
| Lagoon Transfer Piping.TIF | TIF image | |
| Structure3.JPG | JPG image | |
| Structure1.JPG | JPG image | |
| Amendment 0001.pdf | ||
| JGAR200345 Material Submittal Schedule.pdf | ||
| Solicitation Cover Letter.doc.pdf | ||
| Financial Institution Reference Sheet.doc | DOC document | |
| JGAR200345 SPECIFICATIONS.pdf | ||
| FA4659-12-R-0013.doc.pdf | ||
| JGAR200345 DRAWINGS.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Attachment 3 - Climatological Data.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Quantity Units Notes
Existing Riprap Removal ‐ 1.31' Depth 2722 CY
Assuming 30% Loss ‐820 CY
Salvaged Riprap Meeting Spec. 1902 CY
Riprap Placement ‐ 1' Depth 2080 CY
Salvaged Riprap Meeting Spec. ‐1902 CY
Contractor Furnished Riprap 178 CY
Item Quantity Units Notes
Common Excavation Total 956 CY
Topsoil Removal ‐733 CY
Common Excavation 223 CY
Due to cutting the slope of the dike under the fabric to be a 4:1
The Details on Sheet C‐302 are over exaggerated to give a better view of what is taking place. The contractor will remove 10‐11 ft. of riprap, separate out the material not in spec., which is estimated to be around 30%.
Then place back a 12 in. thick section of riprap in the same location. THe reason for the hatching underneath the riprap in the detail is to show that there might need to be a little bit of fill underneath the riprap in order to bring it up so the top of the riprap matches the existing riprap height. This is due to the average depth of the riprap being 1.31 ft. and only putting back 1 ft.NOte that this is just average, some areas will need it and others will not. The 12 in. riprap section wil lthen match the topsoil that is being graded at a 4:1 from the top of the dike. There will be some material excavated out to anchor the fabric but that will be palced back in the same trench.
JGAR200345 Maintain Sewage Lagoon ‐ Secondary South
RIPRAP BREAKDOWN
* Note: These quantities represent the government estimate and are for informaiton purposes only, Contractor's are to verfiy amounts needed. No modifications will be completed on these items.
COMMON EXCAVATION BREAKDOWN