Attachment 3 - Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Improvements to Main Gate, newest first.
File Type Posted
Attachment 3 - NDDH Summary of Asbestos Requirements.pdf PDF
Amendment 0002 - Q A.doc DOC document
Attachment 2 - JFSD200829AB Spec Revised.pdf PDF
Attachment 1 - Questions Answers.doc DOC document
11-R-0017-0001 Proposal Due Date Extension.doc DOC document
JFSD200829AB Spec.pdf PDF
JFSD200829AB Drawings.pdf PDF
RFP 11-R-0017.pdf PDF
Climatological.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Solicitation Cover Letter.docx DOCX document
FINANCIAL INSTITUTION REFERENCE SHEET.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

JFSD

200829A&B

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1 4

4 Project Site Plan. Sec. 01000, Para. 8.2.1 4

5 Dirt and Dust Control Plan. Sec. 01000, Para. 8.2.2 4

6 Contractor's Health and Safety Plan. Sec. 01000, Para. 8.2.3 4

Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 11.1.2

8 Site Conditions Photographs. Sec. 01000, Para. 13.5 4

Critical Path Method (CPM) Network Schedule. Sec. 01000, Para.

13.6.1

Schedule Showing Procurement Plans for Materials and

Equipment. Sec. 01000, Para. 13.6.2.1

11 Exterior Utility System Drawings. Sec. 01000, Para. 13.7.1.1 1

12 Final As-Built Drawings. Sec. 01000, Para. 13.8 1

13 Real Property Record - Form DD1354. Sec. 01000, Para. 13.9 4

14 Environmental Pollution Control Plans. Sec. 01000, Para. 14.3.1 4

15 Storm Water Protection Plan. Sec. 01000, Para. 14.5 4

NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 14.6.2

Asbestos Abatement Submittals. Sec. 01000, Para. 14.6 and

Spec. Sect. 02 82 14, if used.

18 Waste Disposal Plan. Sec. 01000, Para. 14.8 4

19 Dust Control Plan. Sec. 01000, Para. 14.10 4

20 Radioactive Materials Documentation. Sec. 01000, Para. 14.13.1 4

21 Spill Control Plan. Sec. 01000, Para. 14.14 4

22 Erosion and Sediment Control Plan. Sec. 01000, Para. 14.15 4

23 Contractor Quality Control Plan. Sec. 01000, Para. 15.3 4

24 O & M Manuals. Sec. 01000, Para. 17 3

25 Sec. 01000, Affirmative Procurement Report Form 4

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

IN

G

D A

T A

C E

R T

IF

IC

A T

E S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F

C

M P

L

IA

N C

E

T E

S T

D A

T A

G U

A R

A N

T E

E S

S A

M P

L E

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

CONSTRUCT ATFP IMPROVEMENTS AND

REPAIR ATFP FEATURES - MAIN GATE

GRAND FORKS AFB, ND

FA4659-09-D-A003

156-007 01000-1

FA

4659-11-R

-0017

A ttachm ent 3

PROJECT NO.

JFSD

200829A&B

APPROVED DISAPPROVED

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

IN

G

D A

T A

C E

R T

IF

IC

A T

E S

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

DATE

RECEIVED

CONTRACTING

NO. OF COPIES REQUIRED

L

IN

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F

F

C

M P

L

IA

N C

E

T E

S T

D A

T A

G U

A R

A N

T E

E S

S A

M P

L E

S

REQUIRED

DATE OF

SUBMISSION

P R

O C

E D

U R

E S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

CONSTRUCT ATFP IMPROVEMENTS AND

REPAIR ATFP FEATURES - MAIN GATE

GRAND FORKS AFB, ND

FA4659-09-D-A003

1 CONCRETE REINFORCEMENT 4 03 20 00

2 CONCRETE MIX DESIGN 4 03 30 00

3 CAST STONE 4 3 03 45 00

4 FACE BRICK 3 04 20 00

5 METAL FABRICATIONS 4 05 50 00

6 JOINT SEALERS 4 3 07 92 00

7 WIRING DEVICES 4 26 27 26

8 CIRCUIT AND MOTOR DISCONNECTS 4 26 28 16

9 TRANSFER SWITCHES 4 4 4 4 26 36 00

10 CONCRETE MIX DESIGN 4 32 16 13

11 ASPHALTIC CONCRETE PAVING MIX DESIGN 4 32 16 13

Y\156_004\DOCUMENTS\SPECS\01000 PART 2.xls

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

156-007 01000-2

FA

4659-11-R

-0017

A ttachm ent 3