Pg 2 Revised Section 01 02 30 FA4659-10-R-0019-0004.pdf
PDF 27 KB Posted
- Attached to
- Replace Interior Lighting Basewide (R/M) Federal contract opportunity
- Solicitation number
- FA4659-10-R-0019
About this file
Revised Specifications 01 02 30-2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers FA4659-10-R-0019-0004.pdf | ||
| JFSD200820 E-001 R1 FA4659-10-R-0019-0004.pdf | ||
| Comprehensive Base Map FA4659-10-R-0019-0004.pdf | ||
| FA4659-10-R-0019-0004.pdf | ||
| FA4659-10-R-0019-0003.pdf | ||
| FA4659-10-R-0019-0002.pdf | ||
| Basewide Lighting Site Visit Meeting Minutes and Attendance.pdf | ||
| FA4659-10-R-0019-0001.pdf | ||
| FA4659-10-R-0019-0001.odt | ODT document | |
| JFSD_0901_ALL_SHEETS.pdf | ||
| Atch 6 Financial Institution Reference Sheet.pdf | ||
| Atch 7 Waiver Green Procurement Form.pdf | ||
| Specs All Pages.pdf | ||
| Solicitation No. FA4659-10-R-0019 Replace Interior Lighting Basewide.pdf | ||
| Atch 5 Past Performance Questionnaire w. Cover Letter.pdf | ||
| Atch 4 General Decision No. ND100003.pdf | ||
| Atch 2 Schedule of Drawings JFSD200820.pdf | ||
| Solicitation Cover Letter FA4659-10-R-0019.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Interior Lighting Basewide (R/M) 01 02 30-2 156-001
(Revised Aug. 10, 2010. 2010 by FEI
1.1 CONTRACTOR USE OF SITE AND PREMISES
A. Limit the use of the premises to construction activities in areas noted in Contractor’s Replacement Schedule. Allow for full occupancy during construction. Contractors and subcontractors shall park vehicles in areas designated by the Owner. Keep driveways and entrances clear and available to GFAFB or visitors at all times.
B. Utility Outages and Shutdown: Contractor shall notify the GFAFB Project Manager (PM) at least five (5) calendar days in advance of any power outages or major equipment shutdowns.
See Section 1A for additional requirements.
1.2 BUILDINGS LAMP/BALLAST REPLACEMENT SCHEDULE (Buildings 101, 102, 108, 110, 117, 118, 119, 121, 124, 132, 139, 143, 144, 147, 168, 201, 202, 203, 204, 207, 208, 213, 217, 221, 222, 231, 232, 233, 244, 252, 303, 308, 310, 313, 315, 316, 319, 320, 326, 408, 409, 410, 411, 413, 414, 415, 416, 435, 440, 459, 512, 513, 516, 517, 518, 528, 534, 540, 541, 542, 545, 556, 557, 580, 607, 609, 610, 622, 629, 631, 650, 661, 668, and 670.)
A. The estimated quantity and fixture types are listed. The Contractor shall verify quantities and conditions for replacement in field prior to bidding. Ballasts are to be replaced 1 FOR 1 (i.e If fixture has two ballasts then two new ones will be installed). A light fixture quantity of 0.5 means a single lamp fixture. Building 118 room 109 and some other rooms in the facility have track lighting. No lamp change out of these track systems. There is no work on HID fixtures listed on the Lamp/Ballast Replacement Schedule.
1.3 BUILDINGS METAL HALIDE FIXTURE REPLACEMENT (Buildings 121, 308, 408, 409, 411, 413, 414, 415, 416, 418, 435, 540, 557, 580, 622, 661, and 670).
A. The estimated fixture types and quantities are shown on the drawings. The Contractor shall verify quantities and conditions for replacement in field prior to bidding.