Questions and Answers 6 May 09.doc

DOC document 28 KB Posted

Attached to
RECOVERY - Repair Electric Lines-Flight Line North (R/M)
Solicitation number
FA4659-09-R-0006
Issued by

About this file

6 May 09 Questions and answers

View the file

Other files

File Type Posted
Amend 7.doc DOC document
FA4659-09-R-0006-0006.pdf PDF
JFSD970345 Questions and responses..docx DOCX document
Revised Drawings FA4659-09-R-0006.pdf PDF
FA4659-09-R-0006-0005.pdf PDF
amendment 0004.doc DOC document
DRWINGS FA4659-09-R-0006.pdf PDF
Past Performance Questionaire Revision 10 April.pdf PDF
amendment 0003.doc DOC document
Amend 2 North flight line elec.doc DOC document
FA4659-09-R0006 Specifications.pdf PDF
Flight Lines North Drawings.zip ZIP file
RFP cover letter.pdf PDF
Past Performance Questionaire R-0006.pdf PDF
RFP 09-R0006.doc DOC document
Attachment 1 - YEARLY CLIMATOLOGICAL SUMMARY FOR 2007-2003.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 May 09 revised drawings - raised some additional questions:

1. E2.2 - Note 8 near Bldg. 647 refers to connecting new switch to existing switch location?

Answer: Ignore note 8. Cad program has inserted some random numbers.

2. E2.2 - Note 4 near the symbol shown as a Sectionalizing Switch refers to a cabinet. Which is it?

Answer: At location near 7th avenue we are replacing an existing switch with a new switch and connecting both circuits into it. The switch is outside the pole line path of the existing circuits so sectionalinzing cabinets will be needed on the pole line and the switch will be at the location of the existing one. The note 4 shown near a MH should be ignored.

3. E2.2 - Note 6 in the upper right refers to new padmount transformers - none are shown.

Answer: Note 6 is in error delete this note.

4. E2.2 - Note 3 near 605 - no existing padmount shown.

Answer: The note #3 is another random insert. Delete this note.

5. E2.3 - Note 5 - sectionalizing cabinet previously shown as new is now shown as existing - verify.

Answer: During construction of the new Control Tower a cabinet shall be installed in this area. It should be existing at the time this project gets to this area.

6. E2.5 - Note 2 was added near locations with Notes 10 and 12 (reuse existing), saying to add new duct bank - is this correct? Note 12 and new Note 4 are also at the same location - one says new, one says reuse.

Answer: Ignore note 10 at Eielson street and note 4 north of building 622.

7. E5.2 - Is the "A" shown in the circuit 2 one-line the same as shown in the circuit 8 one-line? And what is the location of this new switch (there is nothing on the prints showing a 7th Ave. location, unless my question 2 addresses this)?

Answer: The “A” switch is a switch to be placed where note 12 Is shown in the upper right of page E2.2. It is one switch which is to provide possible interconnection between circuits 2 & 8. This switch replaces an existing one near the location of note #12.