Solicitation.doc
DOC document 1 MB Posted
- Attached to
- Repair Airfield Pavement Spalls and Joints
- Solicitation number
- FA4659-08-R-0015
About this file
Solicitation Document
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Details.pdf | ||
| Solicitation Cover-2.doc | DOC document | |
| Cover.pdf | ||
| JFSD 200821 final.pdf | ||
| Details2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Spalls and Joints Base Year
FP-EPA
Contractor to furnish all plant, labor and materials in strict accordance with plans and specifications of the contract and as specified in the Technical Provisions. The work to be performed but not limited to includes the replacement of airfield pavement full slabs, spalls, and joint sealant over an area of airfield concrete pavements, as well as cracks in shoulder and runway asphalt. Period of Performance is from date of award through 31 March 09
FOB: Destination
PURCHASE REQUEST NUMBER: F2A3E18198A001
SIGNAL CODE: A
MAX NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AA
| 10 |
| Each |
Mobilization
FFP
Mobilization
FOB: Destination
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AB
| 5 |
| Each |
Runway Work Mobilization
Mobilization for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AC
| 667 |
| Square Foot |
Reflective Painting
Reflective Painting
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AD
| 333 |
| Square Foot |
Runway Work Reflective Painting
Reflective Painting for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AE
| 1,000 |
| Square Foot |
Painting Non-Reflective
Painting Non-Reflective
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AF
| 500 |
| Square Foot |
Runway Work Painting Non-Reflective
Painting Non-Reflective for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AG
| 1 |
| Each |
Restricted Area Warning Pavement Marking
Restricted Area Warning Pavement Marking
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AH
| 1 |
| Each |
Runway Restricted Area Pavement Marking
Restricted Area Warning Pavement Marking for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AJ
| 2,000 |
| Linear Foot |
Clean and Seal Existing Joints
Line item includes all costs associated with cleaning and resealing of concrete pavement, to include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AK
| 1,000 |
| Linear Foot |
Runway Clean and Seal Existing Joints
Line item includes all costs associated with cleaning and resealing of concrete pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AL
| 6,667 |
| Linear Foot |
Rout and Seal Random Cracks
Line item includes all costs associated with sealing random cracks, to include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AM
| 3,333 |
| Linear Foot |
Runway work Rout and Seal Random Cracks
Line item includes all costs associated with sealing random cracks for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AN
| 20 |
| Ton |
Bituminous Asphalt
Line item includes all costs associated with the removal and replacement of asphalt pavement, to include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AP
| 10 |
| Ton |
Runway Work Bituminous Asphalt
Line item includes all costs associated with the removal and replacement of asphalt pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AQ
| 1,166 |
| Square Foot |
Spalled Joint Repair, Partial Depth
Spalled Joint Repair, Partial Depth (up to 5,000 sf). Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AR
| 584 |
| Square Foot |
Runway Spall Joint Repair, Partial Depth
Spalled Joint Repair, Partial Depth (up to 5,000 sf) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.. Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AS
| 500 |
| Cubic Yard |
Random Slab Replacment
Random Slab Replacment (removal and replacement) Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AT
| 250 |
| Cubic Yard |
Runway Work Randon Slab Replacment
Randon Slab Replacment (removal and replacement) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AU
| 1 |
| Lump Sum |
Construct Limit Signs and Barricades
Construct Limit Signs and Barricades
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AV
| 1 |
| Lump Sum |
Runway Construct Signs & Barricades
Construct Limit Signs and Barricades for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AW
| 3 |
| Quarter Hours |
Security Delays
Security Delays
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0001AX
| 2 |
| Quarter Hours |
Runway Work Security Delays
Security Delays for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Spalls and Joints 1st Option Year |
FP-EPA
Contractor to furnish all plant, labor and materials in strict accordance with plans and specifications of the contract and as specified in the Technical Provisions. The work to be performed but not limited to includes the replacement of airfield pavement full slabs, spalls, and joint sealant over an area of airfield concrete pavements, as well as cracks in shoulder and runway asphalt. Period of Performance is from 1 April 09 through 31 March 10
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AA
| 10 |
| Each |
| OPTION |
| Mobilization |
FFP
Mobilization
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AB
| 5 |
| Each |
| OPTION |
| Runway Work Mobilization |
FFP
Mobilization for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AC
| 667 |
| Square Foot |
| OPTION |
| Reflective Painting |
FFP
Reflective Painting
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AD
| 333 |
| Square Foot |
| OPTION |
| Runway Work Reflective Painting |
FFP
Reflective Painting for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AE
| 1,000 |
| Square Foot |
| OPTION |
| Painting Non-Reflective |
FFP
Painting Non-Reflective
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AF
| 500 |
| Square Foot |
| OPTION |
| Runway Work Painting Non-Reflective |
FFP
Painting Non-Reflective for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AG
| 1 |
| Each |
| OPTION |
| Restricted Area Warning Pavement Marking |
FFP
Restricted Area Warning Pavement Marking
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AH
| 1 |
| Each |
| OPTION |
| Runway Restricted Area Pavement Marking |
FFP
Restricted Area Warning Pavement Marking for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AJ
| 2,000 |
| Linear Foot |
| OPTION |
| Clean and Seal Existing Joints |
FFP
Line item includes all costs associated with cleaning and resealing of concrete pavement, to include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AK
| 1,000 |
| Linear Foot |
| OPTION |
| Runway Clean and Seal Existing Joints |
FFP
Line item includes all costs associated with cleaning and resealing of concrete pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AL
| 6,667 |
| Linear Foot |
| OPTION |
| Rout and Seal Random Cracks |
FFP
Line item includes all costs associated with sealing random cracks, to include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AM
| 3,333 |
| Linear Foot |
| OPTION |
| Runway work Rout and Seal Random Cracks |
FFP
Line item includes all costs associated with sealing random cracks for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AN
| 20 |
| Ton |
| OPTION |
| Bituminous Asphalt |
FP-EPA
Line item includes all costs associated with the removal and replacement of asphalt pavement, to include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AP
| 10 |
| Ton |
| OPTION |
| Runway Work Bituminous Asphalt |
FP-EPA
Line item includes all costs associated with the removal and replacement of asphalt pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AQ
| 1,166 |
| Square Foot |
| OPTION |
| Spalled Joint Repair, Partial Depth |
FFP
Spalled Joint Repair, Partial Depth (up to 5,000 sf). Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AR
| 584 |
| Square Foot |
| OPTION |
| Runway Spall Joint Repair, Partial Depth |
FFP
Spalled Joint Repair, Partial Depth (up to 5,000 sf) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.. Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AS
| 500 |
| Cubic Yard |
| OPTION |
| Random Slab Replacment |
FFP
Random Slab Replacment (removal and replacement) Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AT
| 250 |
| Cubic Yard |
| OPTION |
| Runway Work Randon Slab Replacment |
FFP
Randon Slab Replacment (removal and replacement) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AU
| 1 |
| Lump Sum |
| OPTION |
| Construct Limit Signs and Barricades |
FFP
Construct Limit Signs and Barricades
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AV
| 1 |
| Lump Sum |
| OPTION |
| Runway Construct Signs & Barricades |
FFP
Construct Limit Signs and Barricades for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AW
| 3 |
| Quarter Hours |
| OPTION |
| Security Delays |
FFP
Security Delays
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AX
| 2 |
| Quarter Hours |
| OPTION |
| Runway Work Security Delays |
FFP
Security Delays for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Spalls and Joints 2nd Option Year |
FP-EPA
Contractor to furnish all plant, labor and materials in strict accordance with plans and specifications of the contract and as specified in the Technical Provisions. The work to be performed but not limited to includes the replacement of airfield pavement full slabs, spalls, and joint sealant over an area of airfield concrete pavements, as well as cracks in shoulder and runway asphalt. Period of Performance is from 1 April 10 through 31 March 11
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AA
| 10 |
| Each |
| OPTION |
| Mobilization |
FFP
Mobilization
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AB
| 5 |
| Each |
| OPTION |
| Runway Work Mobilization |
FFP
Mobilization for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AC
| 667 |
| Square Foot |
| OPTION |
| Reflective Painting |
FFP
Reflective Painting
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AD
| 333 |
| Square Foot |
| OPTION |
| Runway Work Reflective Painting |
FFP
Reflective Painting for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AE
| 1,000 |
| Square Foot |
| OPTION |
| Painting Non-Reflective |
FFP
Painting Non-Reflective
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AF
| 500 |
| Square Foot |
| OPTION |
| Runway Work Painting Non-Reflective |
FFP
Painting Non-Reflective for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with non-reflective painting, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AG
| 1 |
| Each |
| OPTION |
| Restricted Area Warning Pavement Marking |
FFP
Restricted Area Warning Pavement Marking
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AH
| 1 |
| Each |
| OPTION |
| Runway Restricted Area Pavement Marking |
FFP
Restricted Area Warning Pavement Marking for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
Line item includes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation, painting, masking and layout.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AJ
| 2,000 |
| Linear Foot |
| OPTION |
| Clean and Seal Existing Joints |
FFP
Line item includes all costs associated with cleaning and resealing of concrete pavement, to include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AK
| 1,000 |
| Linear Foot |
| OPTION |
| Runway Clean and Seal Existing Joints |
FFP
Line item includes all costs associated with cleaning and resealing of concrete pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to the removal and disposal of old joint sealant and backer rod, sandblasting and cleaning of joint, placing new backer rod and joint sealant. All work shall be performed in manner consistent with UFC 3-270-04 Concrete Repair. Joint Sealant will be Dow 890s1 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AL
| 6,667 |
| Linear Foot |
| OPTION |
| Rout and Seal Random Cracks |
FFP
Line item includes all costs associated with sealing random cracks, to include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AM
| 3,333 |
| Linear Foot |
| OPTION |
| Runway work Rout and Seal Random Cracks |
FFP
Line item includes all costs associated with sealing random cracks for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to routing or saw cutting, sandblasting, vacuuming, installation of backer rod and application of appropriate sealant for concrete or asphalt pavement. All work shall be performed in manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair and UFC 3-270-02 Asphalt Crack Repair. Contrete Sealant will be Dow 890s1 or approved alternative. Asphalt sealant will be Crafco Roadsaver RS231 or approved alternative.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AN
| 20 |
| Ton |
| OPTION |
| Bituminous Asphalt |
FP-EPA
Line item includes all costs associated with the removal and replacement of asphalt pavement, to include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
FOB: Destination
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AP
| 10 |
| Ton |
| OPTION |
| Runway Work Bituminous Asphalt |
FP-EPA
Line item includes all costs associated with the removal and replacement of asphalt pavement for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. To include but not limited to saw cutting pavement, loading and disposal of debris, recompaction of disturbed subbase, asphalt paving, tack coat, prime coat, and delivery of asphalt and compaction of asphalt. All work will be performed in a manner consistent with UFC 3-250-03 Standard Practice Manual for Flexible pavements. The work must be performed in a manner that will not damage existing pavements. Any damage to existing pavements will be repaired at the contractor's expense. A job mix formula will be submittted for approval prior to commencement of work.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AQ
| 1,166 |
| Square Foot |
| OPTION |
| Spalled Joint Repair, Partial Depth |
FFP
Spalled Joint Repair, Partial Depth (up to 5,000 sf). Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AR
| 584 |
| Square Foot |
| OPTION |
| Runway Spall Joint Repair, Partial Depth |
FFP
Spalled Joint Repair, Partial Depth (up to 5,000 sf) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.. Line item includes all costs associated with the repair of concrete spalls, to include but not limited to identification of spall limits, removal of spalled concrete, placement of new concrete, reestablishing proper joints at spall. The work will be performed in a manner consistent with UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AS
| 500 |
| Cubic Yard |
| OPTION |
| Random Slab Replacment |
FFP
Random Slab Replacment (removal and replacement) Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AT
| 250 |
| Cubic Yard |
| OPTION |
| Runway Work Randon Slab Replacment |
FFP
Randon Slab Replacment (removal and replacement) for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway. Line item includes all costs associated with the full slab replacement to include but not limited to saw cutting, removal of concrete, addition or recompaction of disturbed base course, concrete, dowel bars, saw cutting joints and resealing of new joints. The work shall be performed in a manner consistent with UFC 3-270-04 Concrete Repair. The work shall be performed in a manner which does not damage pavement to remain in place: any damage will be repaired at contractor's expense.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AU
| 1 |
| Lump Sum |
| OPTION |
| Construct Limit Signs and Barricades |
FFP
Construct Limit Signs and Barricades
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AV
| 1 |
| Lump Sum |
| OPTION |
| Runway Construct Signs & Barricades |
FFP
Construct Limit Signs and Barricades for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AW
| 3 |
| Quarter Hours |
| OPTION |
| Security Delays |
FFP
Security Delays
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AX
| 2 |
| Quarter Hours |
| OPTION |
| Runway Work Security Delays |
FFP
Security Delays for the runway. Per Technical Specifications 01000 paragraph 2.2.1 all runway work will take place at night or on the weekends. This CLIN will be used when the work will take place on the runway.
MAX
RECAPITULATION
Recapitulation of all CLINS
IDIQ Spalls and Joints
Base Year Total
1st Option Year Total
2nd Option Year Total
Total of all Years
EPA
NOTE: BIDDERS MUST BID ON ALL ITEMS TO BE CONSIDERED RESPONSIVE.
This contract includes an Economic Price Adjustment (EPA) for select CLINS and SUB CLINS. The revised prices will be determined by applying the percentage increase/decrease of the Producer Price Index (PPI) for the classification of Paving to the base period prices. The Bureau of Labor Statistics data series ID WPU05810112 will be used for this adjustment. The index for the last period adjusted shall be utilized as the PPI base period. The latest PPI will be used for the numerator. The percentage of increase/decrease shall be computed by taking the total percentage increase/decrease from the PPI base period through most up to date period and dividing that percent by the base period PPI to arrive at the average percent increase/decrease. That shall be the percent increase/decrease for each adjusted. Adjustments will be made using the initial PPI current as of Mar 09 and Mar 10. For the base PPI, the base index used will be the PPI current as of Aug 08. The new index used in the evaluation will be the most current PPI published by the Department of Labor for the commodity of asphalt. Lines to be evaluated are the following: items 0001AG (Bituminous Asphalt), 1002AG (Bituminous Asphalt), and 2003AG (Bituminous Asphalt).
Formula: current year minus previous year divided by previous year multiplied by 100.
Example: The PPI for Oct 2002 is 147.7; the PPI for Oct 2003 is 154
(154-147.7)/147.7 = .04265 * 100 = 4.27% increase
Line Item 0001 = $108.00 (base period)
$108 * 4.27% = $4.61
$108 + $4.61 = $112.61
The unit price for Line Item 0001 (Option Period) would be $112.61.
*Note: These prices are fictitious. Numbers were given as an example of how the calculation works.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0001AA |
| Destination |
| Government |
| Destination |
| Government |
| 0001AB |
| Destination |
| Government |
| Destination |
| Government |
| 0001AC |
| Destination |
| Government |
| Destination |
| Government |
| 0001AD |
| Destination |
| Government |
| Destination |
| Government |
| 0001AE |
| Destination |
| Government |
| Destination |
| Government |
| 0001AF |
| Destination |
| Government |
| Destination |
| Government |
| 0001AG |
| Destination |
| Government |
| Destination |
| Government |
| 0001AH |
| Destination |
| Government |
| Destination |
| Government |
| 0001AJ |
| Destination |
| Government |
| Destination |
| Government |
| 0001AK |
| Destination |
| Government |
| Destination |
| Government |
| 0001AL |
| Destination |
| Government |
| Destination |
| Government |
| 0001AM |
| Destination |
| Government |
| Destination |
| Government |
| 0001AN |
| Destination |
| Government |
| Destination |
| Government |
| 0001AP |
| Destination |
| Government |
| Destination |
| Government |
| 0001AQ |
| Destination |
| Government |
| Destination |
| Government |
| 0001AR |
| Destination |
| Government |
| Destination |
| Government |
| 0001AS |
| Destination |
| Government |
| Destination |
| Government |
| 0001AT |
| Destination |
| Government |
| Destination |
| Government |
| 0001AU |
| Destination |
| Government |
| Destination |
| Government |
| 0001AV |
| Destination |
| Government |
| Destination |
| Government |
| 0001AW |
| Destination |
| Government |
| Destination |
| Government |
| 0001AX |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1001AA |
| Destination |
| Government |
| Destination |
| Government |
| 1001AB |
| Destination |
| Government |
| Destination |
| Government |
| 1001AC |
| Destination |
| Government |
| Destination |
| Government |
| 1001AD |
| Destination |
| Government |
| Destination |
| Government |
| 1001AE |
| Destination |
| Government |
| Destination |
| Government |
| 1001AF |
| Destination |
| Government |
| Destination |
| Government |
| 1001AG |
| Destination |
| Government |
| Destination |
| Government |
| 1001AH |
| Destination |
| Government |
| Destination |
| Government |
| 1001AJ |
| Destination |
| Government |
| Destination |
| Government |
| 1001AK |
| Destination |
| Government |
| Destination |
| Government |
| 1001AL |
| Destination |
| Government |
| Destination |
| Government |
| 1001AM |
| Destination |
| Government |
| Destination |
| Government |
| 1001AN |
| Destination |
| Government |
| Destination |
| Government |
| 1001AP |
| Destination |
| Government |
| Destination |
| Government |
| 1001AQ |
| Destination |
| Government |
| Destination |
| Government |
| 1001AR |
| Destination |
| Government |
| Destination |
| Government |
| 1001AS |
| Destination |
| Government |
| Destination |
| Government |
| 1001AT |
| Destination |
| Government |
| Destination |
| Government |
| 1001AU |
| Destination |
| Government |
| Destination |
| Government |
| 1001AV |
| Destination |
| Government |
| Destination |
| Government |
| 1001AW |
| Destination |
| Government |
| Destination |
| Government |
| 1001AX |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2001AA |
| Destination |
| Government |
| Destination |
| Government |
| 2001AB |
| Destination |
| Government |
| Destination |
| Government |
| 2001AC |
| Destination |
| Government |
| Destination |
| Government |
| 2001AD |
| Destination |
| Government |
| Destination |
| Government |
| 2001AE |
| Destination |
| Government |
| Destination |
| Government |
| 2001AF |
| Destination |
| Government |
| Destination |
| Government |
| 2001AG |
| Destination |
| Government |
| Destination |
| Government |
| 2001AH |
| Destination |
| Government |
| Destination |
| Government |
| 2001AJ |
| Destination |
| Government |
| Destination |
| Government |
| 2001AK |
| Destination |
| Government |
| Destination |
| Government |
| 2001AL |
| Destination |
| Government |
| Destination |
| Government |
| 2001AM |
| Destination |
| Government |
| Destination |
| Government |
| 2001AN |
| Destination |
| Government |
| Destination |
| Government |
| 2001AP |
| Destination |
| Government |
| Destination |
| Government |
| 2001AQ |
| Destination |
| Government |
| Destination |
| Government |
| 2001AR |
| Destination |
| Government |
| Destination |
| Government |
| 2001AS |
| Destination |
| Government |
| Destination |
| Government |
| 2001AT |
| Destination |
| Government |
| Destination |
| Government |
| 2001AU |
| Destination |
| Government |
| Destination |
| Government |
| 2001AV |
| Destination |
| Government |
| Destination |
| Government |
| 2001AW |
| Destination |
| Government |
| Destination |
| Government |
| 2001AX |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0001AA |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
F2A3E1
| 0001AB |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AC |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AD |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AE |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AF |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AG |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AH |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AJ |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AK |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AL |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AM |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AN |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AP |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AQ |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AR |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AS |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AT |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AU |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AV |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AW |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 0001AX |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1001AA |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
F2A3E1
| 1001AB |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AC |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AD |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AE |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AF |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AG |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AH |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AJ |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AK |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AL |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AM |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AN |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AP |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AQ |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AR |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AS |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AT |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AU |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AV |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AW |
| POP 01-APR-2010 TO |
31-MAR-2011
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 1001AX |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2001AA |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| 319 CES/CEC - F2A3E1 |
GLORIA DARBY
575 TUSKEGEE AIRMEN BLVD, BLDG 410, RM 15
GRAND FORKS AFB ND 58205-6219
701-747-4783
F2A3E1
| 2001AB |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AC |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AD |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AE |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AF |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AG |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AH |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AJ |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AK |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AL |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AM |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AN |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AP |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AQ |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AR |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AS |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AT |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AU |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AV |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AW |
| POP 01-APR-2009 TO |
31-MAR-2010
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
| 2001AX |
| POP 25-SEP-2008 TO |
31-MAR-2009
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2A3E1
CLAUSES INCORPORATED BY REFERENCE
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
5352.232-9000 REMITTANCE ADDRESS (MAY 1996)
If the remittance address is different from the mailing address, enter the remittance address below. Failure to provide this information may impact payment.
WAWF
WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)
ELECTRONIC RECEIVING REPORT AND INVOICING INSTRUCTIONS
IN ACCORDANCE WITH DFARS 232.7002, USE OF ELECTRONIC PAYMENT REQUESTS IS MANDATORY. USE OF WAWF WILL SPEED UP YOUR PAYMENT PROCESSING TIME AND ALLOW YOU TO MONITOR YOUR PAYMENT STATUS ONLINE. THERE ARE NO CHARGES OR FEES TO USE WAWF.
Requests for payments must be submitted electronically via the Internet through the Wide Area WorkFlow – Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil.
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Limestone through the DFAS Centralized Customer Service number (800) 756-4571 (select option 2) or faxed to (866) 392-7091. Please have your order number and invoice number ready when contacting DFAS about payment status. You can also access payment information using the DFAS Vendor Pay Inquiry System (VPIS) web site at http://www.dfas.mil/money/vendor.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR RECEIVING REPORTS, INVOICES AND ADDITIONAL E-MAILS CORRECTLY THROUGH WAWF.
| CONTRACT NUMBER: |
| FA4659-08-X-XXXX |
| DELIVERY ORDER NUMBER: |
| XXXX |
| TYPE OF DOCUMENT: |
| Construction Payment Invoice |
| CAGE CODE: |
| XXXX |
| ISSUE BY DODAAC: |
| FA4659 |
| ADMIN DODAAC: |
| FA4659 |
| INSPECT BY DODAAC: |
| N/A |
| SERVICE ACCEPTOR / SHIP TO: |
| BPN Number – F2A3CC |
| LOCAL PROCESSING OFFICE: |
| N/A |
| PAY OFFICE DODAAC: |
| F67100 (DFAS) |
SEND MORE E-MAIL NOTIFICATIONS:
| CONTRACT ADMINISTRATOR: |
| sharon.frank@grandforks.af.mil |
| CONTRACTING OFFICER: |
| shane.lind@grand forks.af.mil |
| ADDITIONAL NOTIFICATION: |
| ricardo.rhoads@grandforks.af.mil |
| ADDITIONAL NOTIFICATION: |
| Optional |
| ADDITIONAL NOTIFICATION: |
| Optional |
BPN ver 02.04.2005
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H-1.
REQUIRED INSURANCE (IAW FAR 28.306(b))
Reference FAR clause entitled “Insurance....” the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $25,000 per occurrences for property damage shall be required.
H-2.
FEDERAL HOLIDAYS
The following Federal Legal holidays are observed by this base:
New Year's Day
1 January
Martin Luther King's Birthday
Third Monday in January
Presidents Days
Third Monday in February
Memorial Day
Last Monday in May
Independence Day
4 July
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
11 November
Thanksgiving Day
Fourth Thursday in November
Christmas Day
25 December
H-3.
PERFORMANCE AND BID REQUIREMENTS (IAW FAR 28.101-2(b) and 28.102-2)
a. A bid guarantee is not required with the proposal. However, when notified by the contracting officer, the successful offeror shall submit a bid guarantee in the…
This is the start of the file's text. The full file is on GovTribe.