FA465424R0017 Pavement Joints Questions and Answers.docx
DOCX document 14 KB Posted
- Solicitation number
- FA465424R0017
About this file
This document contains Questions and Answers for Solicitation FA465424R0017 issued by the Department of the Air Force Reserve Command for Maintain Pavement Joints on Airfield at Grissom Air Reserve Base, IN.
The key details are: The solicitation does not provide the existing joint widths for the airfield, as they are variable and cannot be accurately quantified. Instead, the contractor is expected to determine the joint dimensions during the site visit on June 13, 2024. The joint widths may change over the years of the contract, making it impossible to predict the amount of change. The solicitation is a full and open competition with a 10% HUBZone preference and small business preference. The government intends to award a single-award IDIQ contract from this solicitation. The prior solicitation FA465424R0013 was a small business set-aside that received no offers, prompting this re-posting with large businesses now allowed to submit proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation FA465424R0017 Grissom Air Reserve Base, IN – Maintain Pavement Joints on Airfield
Q: Sheet C001 that for joints that are 1/4" to 1-1/2" the joints are to be widened to 1/8" greater than the existing nominal width but it appears that the joint widths are not provided. Could the engineer please provide either the existing joint widths for each of the 6 details provided on sheet number C501 or the proposed refaced joint width for each of those details so that the required materials can accurately be accounted for?
A: The Government will not be able to provide the existing joint widths for the airfield because they are variable, and it is unrealistic to quantify the joint widths for the airfield. The site visit on 13JUN2024 allowed full access to determine the joint dimensions. The joint widths for the airfield are variable and will change during the years of the contract and it is impossible to predict with much accuracy the amount of change.