23-2002 MAINTAIN AIRFIELD PAVEMENT JOINTS - V2.pdf
PDF 5 MB Posted
- Solicitation number
- FA465424R0017
About this file
This document is a contract solicitation from the Department of the Air Force Reserve Command for maintaining airfield pavement joints at Grissom Air Reserve Base in Indiana. The solicitation seeks a contractor to perform pavement joint replacement and related work, including preparing and sealing cracks and joints in the airfield pavement. The work must be scheduled to avoid disrupting airfield operations, with most joint work required to be performed at night or on weekends. The solicitation is a full and open competition with a 10% HUBZone preference and a small business preference. The anticipated contract type is a single-award IDIQ, with actual quantities to be stated in each issued task order. The solicitation has a closing date of June 24, 2024, with a site visit scheduled for June 7, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SU
BM
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
G001
TI
TL
E
SH
EE
T
GR
EE
N
PE
RR
Y
LEGEND:
LAYDOWN YARD
GRISSOM AIR RESERVE BASE
PROJECT TITLE: PROJECT NUMBER:
MAINTAIN AIRFIELD PAVEMENT JOINTS CTGB232002
FACS 997, 998 & 999
##### SCALE: DETAIL SCALE
DETAIL REFERENCE
SHEET REFERENCE
1 - G001 - TITLE SHEET
2 - G002 - AIRFIELD PHASING PLAN
3 - G003 - GENERAL SPECIFICATIONS
4 - C001 - CIVIL SPECIFICATIONS
5 - C002 - CIVIL SPECIFICATIONS
6 - C101 - SITE PLAN, PARKING APRON
7 - C102 - SITE PLAN, TAXIWAYS
8 - C103 - SITE PLAN, TAXIWAYS
9 - C104 - SITE PLAN, TAXIWAY F
10 - C105 - SITE PLAN, RUNWAY
11 - C501 - JOINT DETAILS
CIVIL ENGINEERING
FACILITY 641
BASE CONTRACTING
FACILITY 448
MAIN GATE
VISITORS
CENTER HOURS
7:30A - 3:30P
CONTRACTOR OFF-SITE
DISPOSAL ROUTE
CONTRACTOR LAYDOWN
AREA (AIRFIELD WORK)
TRUCK INSPECTION
HOURS 7:30A - 3:30P
AIRFIELD ACCESS THROUGH
AERIAL PORT (B609) MANUAL GATE
ROUTE 218
US 31
HOOSIER AVE.
FOREMAN DRIVE
800 S.
HAUL ROUTE
N
SCALE:SCALE:SCALE: 3/8" = 1'-0"
TITLE SHEET
G001
AUGUSTYN.TI
MOTHY.MARTI
N.1263096211
Digitally signed by
AUGUSTYN.TIMOTHY.
MARTIN.1263096211
Date: 2024.03.19 07:49:27 -04'00'
BAUER.JASO
N.MICHAEL.1
148418930
Digitally signed by
BAUER.JASON.MICHA
EL.1148418930
Date: 2024.03.18 06:35:32 -04'00'
Digitally signed by
WALTERS.CORY.MICH
AEL.1257366592
Date: 2024.04.03 09:32:17 -04'00'
BELLAMY.TH
OMAS.LEE.10
75828604
Digitally signed by
BELLAMY.THOMAS.LE
E.1075828604 Date: 2024.03.20 10:12:20 -04'00'
ASHBAUGH.MA
RK.CHRISTOPH
ER.1085062146
Digitally signed by
ASHBAUGH.MARK.CHRIS
TOPHER.1085062146
Date: 2024.03.21 08:32:01 -04'00'
NOLLEY.DER
EK.RICHARD.
1249124440
Digitally signed by
NOLLEY.DEREK.RICHA
RD.1249124440
Date: 2024.03.22 09:43:32 -04'00'
HUGHES.DAV
ID.ALEXANDE
R.1007633528
Digitally signed by
HUGHES.DAVID.ALEXA
NDER.1007633528
Date: 2024.04.03 13:39:47 -04'00'
BORDEN.DAV
ID.CARL.1075
997279
Digitally signed by
BORDEN.DAVID.CARL.
1075997279 Date: 2024.04.05 07:46:50 -04'00'
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
G002
AI
RF
IE
LD
GR
EE
N
PE
RR
Y
PH
AS
IN
G
PL
AN
N
SCALE:SCALE:SCALE: 1" = 400'
TITLE SHEET
G002
LAYDOWN AREA
MAIN HAUL ROUTE
AIRCRAFT ROUTE
CONSTRUCTION PHASING NOTES:
1) PHASING PER UFC 3-260-04 APPENDIX B.
2) OBTAIN FLIGHT DRIVERS LICENSE FROM AIRFIELD MANAGEMENT
(BLDG 600). REQUIRES TWO (2) WEEKS LEAD-TIME TO SCHEDULE.
3) MAINTAIN FOD FREE HAUL ROUTES AT ALL TIMES.
4) DO NOT ENTER RESTRICTED AREA WITHOUT COORDINATION OF
SECURITY FORCES AND AIRFIELD MANAGEMENT.
5) MAXIMUM EQUIPMENT HEIGHT INSIDE AIRFIELD IS 40 FEET. ALL
EQUIPMENT NOT IN USE SHALL BE LOWERED AS MUCH AS POSSIBLE
AND STORED IN THE LAYDOWN/STORAGE AREA.
6) ALL APRONS, TAXIWAYS AND AIRFIELD PAVEMENT SHALL REMAIN
OPERATIONAL DURING CONSTRUCTION. COORDINATE DAILY
JOINTING WITH AIRFIELD MANAGEMENT TO LIMIT TRAFFIC OVER
JOINTED SURFACES.
7) DUTY HOURS FOR JOINT WORK SHALL BE 11:00 PM TO 7:30 AM
MONDAY THROUGH SUNDAY. WEEKEND WORK (SATURDAY AND
SUNDAY) FROM 7:30 AM TO 11:00 PM SHALL REQUIRE PRIOR
APPROVAL FROM THE CONTRACTING OFFICER. WORK FOR
JOINTING FROM 7:30 AM TO 11:00 PM MONDAY THROUGH FRIDAY
SHALL BE PROHIBITED UNLESS APPROVED IN WRITING BY THE
CONTRACTING OFFICER.
TAXIWAY F
TAXIWAY D
TAXIWAY E
RUNWAY 23-05
CONTRACTOR
LAYDOWN AND
STORAGE AREA
FOD CHECK
RESTRICTED
AREA LINE
TAXIWAY G
MASS PARKING APRON
TRANSIENT APRON
RUNWAY 23-05
POWER CHECK PAD
DEAN
BALDWIN
PAINTING
MCEDA AVIATION
WATER HYDRANT
RESTRICTED
AREA LINE
TAXIWAY C
TAXIWAY F
TAXIWAY B TAXIWAY A
MA
TC
HL
IN
E
MA
TC
HL
IN
E
0' 400' 800' 1200'200'
RESTRICTED
AREA LINE
RESTRICTED
AREA LINE
RESTRICTED
AREA LINE
RESTRICTED
AREA LINE
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
G003
GE
NE
RA
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
MAINTAIN PAVEMENTS SPECIFICATIONS
SECTION 1 - GENERAL
1.0 PROJECT DESCRIPTION
THE WORK INCLUDES PAVEMENT JOINT REPLACEMENT AND ALL
INCIDENTAL RELATED WORK AS INDICATED ON THE DRAWINGS
AND THESE SPECIFICATIONS.
1.1 WORK SCHEDULING
CONTRACTOR SHALL ALLOW FOR A MAXIMUM OF 5 CALENDAR
DAYS WHERE CONSTRUCTION ACTIVITY IS PROHIBITIVE. NORMAL
DUTY HOURS FOR JOINTING WORK SHALL BE FROM 7:30 A.M. TO
4:30 P.M., MONDAY THROUGH FRIDAY, NOT INCLUDING FEDERAL
HOLIDAYS. REQUESTS FOR ADDITIONAL WORK SHALL REQUIRE
WRITTEN APPROVAL FROM THE CONTRACTING OFFICER 7 DAYS IN
ADVANCE OF THE PROPOSED WORK PERIOD. DUTY HOURS FOR
JOINT WORK SHALL BE FROM 11:00 P.M. TO 7:30 A.M., MONDAY
THROUGH SUNDAY. WEEKEND WORK (SATURDAY AND SUNDAY)
FROM 7:30 A.M. TO 11:00 P.M. SHALL REQUIRE PRIOR APPROVAL
FROM THE CONTRACTING OFFICER. THE CONTRACTOR SHALL
COMPLY WITH BASE REGULATIONS REGARDING WORK OUTSIDE
NORMAL DUTY HOURS. WORK FOR JOINT REPLACEMENT FROM 7:30
A.M. TO 11:00 P.M. MONDAY THROUGH FRIDAY WILL BE PROHIBITED
UNLESS APPROVED IN WRITING BY THE CONTRACTING OFFICER.
1.2 OCCUPANCY OF PREMISES
THE AIRFIELD WILL REMAIN OPERATIONAL FOR THE DURATION OF
THIS CONTRACT. WHILE WORKING, THE CONTRACTOR MAY BE
REQUIRED TO VACATE THE WORK AREA TO ALLOW UNSCHEDULED
AIRCRAFT MOVEMENTS. ALL WORK ON THE RUNWAY OR INSIDE
THE CMA MUST BE COORDINATED WITH AIRFIELD OPERATIONS AT
LEAST 5 DAYS IN ADVANCE. THE CONTRACTOR SHALL NOTIFY THE
AIRFIELD MANAGER OF WORK ACTIVITIES ON A DAILY BASIS AND
FOLLOW THE POLICIES FOR ACCESS TO THE WORK SITE AND
STORAGE AS LISTED IN THIS SPECIFICATION.
1.3 SUPERVISION
IN ACCORDANCE WITH FAR 52.236-6, SUPERINTENDENCE BY THE
CONTRACTOR, THE CONTRACTOR SHALL HAVE A SITE
SUPERINTENDENT AT THE SITE AT ALL TIMES WHEN THERE ARE
WORKERS ON SITE OR WHEN DELIVERIES ARE TO BE RECEIVED.
UNDER NO CIRCUMSTANCES SHALL A SUBCONTRACTOR BE
AUTHORIZED TO BE SITE SUPERINTENDENT FOR THE PRIME
CONTRACTOR. THE SUPERINTENDENT SHALL BE DESIGNATED AS
SUCH TO THE CONTRACTING OFFICER IN WRITING WITH THE
SIGNATURES OF THE CONTRACTOR AND THE DESIGNATED
SUPERINTENDENT. THE CONTRACTOR SHALL OUTLINE IN THE
DESIGNATION LETTER THE EXTENT OF THE SUPERINTENDENT'S
AUTHORITY.
1.4 SITE PLAN
PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL SUBMIT
SITE PLANS TO THE CONTRACTING OFFICER FOR APPROVAL
SHOWING THE LAYOUT AND DETAILS OF ALL TEMPORARY
FACILITIES USED FOR THIS CONTRACT. THE BASE APPROVAL
AUTHORITY, NORMALLY THE BASE CIVIL ENGINEER, MUST
APPROVE THE PLAN. THE PLAN SHALL INCLUDE THE LOCATION OF
THE SAFETY AND/OR CONSTRUCTION FENCES, LOCATION OF ALL
SITE TRAILERS, EQUIPMENT AND MATERIAL STORAGE AREAS,
CONSTRUCTION ENTRANCES, TRASH DUMPSTERS, TEMPORARY
SANITARY FACILITIES AND WORKER PARKING AREAS. SITE
PICTURES PRIOR TO THE START OF WORK MAY BE INCLUDED WITH
THE PLAN. AT COMPLETION OF WORK, THE CONTRACTOR SHALL
REMOVE THE FACILITIES AND RESTORE THE SITE TO ITS ORIGINAL
CONDITION.
1.5 DIRT AND DUST CONTROL PLAN
AS PART OF THE TRAFFIC CONTROL PLAN, THE CONTRACTOR
SHALL SUBMIT TRUCK AND MATERIAL HAUL ROUTES FOR
CONTROLLING DIRT, DEBRIS, DUST ON BASE ROADWAYS. AS A
MINIMUM, THE PLANS SHALL IDENTIFY THE SUBCONTRACTOR AND
EQUIPMENT FOR CLEANING ALONG THE HAUL ROUTE AND
MEASURES TO REDUCE DIRT, DUST, AND DEBRIS FROM
ROADWAYS.
1.6 AIRFIELD DRIVING
WORK WILL BE PERFORMED IN THE CONTROLLED ZONES OF THE
BASE OR THE AIRFIELD. ALL ACCESS TO OR THROUGH THE BASE
SHALL BE COORDINATED WITH THE CONTRACTING OFFICER OR
AUTHORIZED REPRESENTATIVE. ALL ACCESS TO OR THROUGH THE
AIRFIELD SHALL BE COORDINATED WITH THE CHIEF OF AIRFIELD
MANAGEMENT. THE CONTRACTOR WILL BE REQUIRED TO OBTAIN
AN AIRFIELD DRIVERS LICENSE TO ACCESS THE WORK SITE.
1.7 SITE PICTURES
PHOTOGRAPHS SHALL NOT BE TAKEN ON THE JOBSITE WITHOUT
PRIOR WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.
1.8 SUBMITTALS
PROVIDE SUBMITTALS FOR PRODUCT DATA AND PLANS IDENTIFIED
IN THESE SPECIFCATIONS. FORMATTING AND PROCEDURES FOR
TRANSMITTAL SHALL BE PER THE CONSTRUCTION CONTRACTORS
GUIDE PROVIDED BY THE 434TH/ OPERATIONAL CONTRACTING
OFFICE. ALL SUBMITTALS, REQUESTS FOR INFORMATION AND
TRANSMITTALS SHALL BE ELECTRONICALLY SENT TO THE
CONTRACTING OFFICER.
1.9 QUALITY CONTROL
THE CONTRACTOR IS REQUIRED TO PROVIDE QUALITY CONTROL
FOR THE WORK PERFORMED ON THIS CONTRACT. THE
GOVERNMENT WILL PERFORM QUALITY ASSURANCE TO REVIEW
SUBMITTALS, REPORTS, AND INSPECTIONS PERFORMED BY THE
QC MANAGER (QCM). THE CONTRACTOR SHALL IDENTIFY THE QC
MANAGER AT THE PRE-CONSTRUCTION MEETING. CONTRACTOR
SHALL SUBMIT A QUALITY CONTROL PLAN PRIOR TO
CONSTRUCTION INDICATING THE QCM, CHECKLISTS USED FOR
CONTRACT COMPLIANCE, METHODS TO ENSURE COMPLIANCE
WITH THE DRAWINGS AND SPECIFICATIONS AND PROCEDURES
FOR CORRECTING ANY DEFICIENCIES FOUND BY THE QCM OR
GOVERNMENT QA.
1.9.1 DELIVERY, STORAGE, AND HANDLING
INSPECT MATERIALS DELIVERED TO THE SITE FOR VISIBLE
DAMAGE, AND UNLOAD AND STORE WITH A MINIMUM OF HANDLING.
DELIVER MATERIALS IN ORIGINAL SEALED CONTAINERS AND
PROTECT FROM FREEZING OR OVERHEATING. PROVIDE JOBSITE
STORAGE FACILITIES CAPABLE OF MAINTAINING TEMPERATURE
RANGES WITHIN MANUFACTURERS RECOMMENDATIONS.
1.9.2 WEATHER REQUIREMENTS
DO NOT PROCEED WITH WORK WHEN WEATHER CONDITIONS
DETRIMENTALLY AFFECT THE QUALITY OF CLEANING JOINTS OR
APPLYING SEALANTS. PROCEED WITH JOINT PREPARATION AND
SEALING ONLY WHEN WEATHER CONDITIONS ARE IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS. INSTALL JOINT SEALANT
TO DRY SURFACES AND PROTECT SEALANT AND BOND BREAKERS
FROM MOISTURE.
1.10 PRE-CONSTRUCTION
CONTRACTOR TO HOLD A PRE-CONSTRUCTION MEETING PRIOR TO
STARTING WORK TO IDENTIFY THE WORK LOCATIONS, HOURS OF
OPERATION, SCHEDULE, QUALITY CONTROL PROCEDURES AND
ANY PERTINENT DETAILS TO COMPLETING THE WORK ON THIS
PROJECT. ALL SUBMITTALS, PLANNING DOCUMENTS AND
SCHEDULES MUST BE APPROVED BY THE GOVERNMENT PRIOR TO
SCHEDULING THE MEETING DATE. THE CONTRACTOR SHALL
NOTIFY THE CONTRACTING OFFICER AT LEAST 14 CALENDAR DAYS
PRIOR TO THE MEETING DATE.
1.11 PRE-FINAL INSPECTION
THE GOVERNMENT AND QC MANAGER WILL PERFORM THIS
INSPECTION TO VERIFY THAT THE FACILITY IS COMPLETE AND
READY TO BE OCCUPIED. A GOVERNMENT PRE-FINAL PUNCH LIST
MAY BE DEVELOPED AS A RESULT OF THIS INSPECTION. THE QC
MANAGER SHALL ENSURE THAT ALL ITEMS ON THIS LIST ARE
CORRECTED PRIOR TO NOTIFYING THE GOVERNMENT THAT A
"FINAL" INSPECTION WITH THE CUSTOMER CAN BE SCHEDULED.
ANY ITEMS NOTED ON THE "PRE-FINAL" INSPECTION SHALL BE
CORRECTED IN A TIMELY MANNER AND SHALL BE ACCOMPLISHED
BEFORE THE CONTRACT COMPLETION DATE FOR THE WORK OR
ANY PARTICULAR INCREMENT THEREOF IF THE PROJECT IS
DIVIDED INTO INCREMENTS BY SEPARATE COMPLETION DATES.
1.12 FINAL ACCEPTANCE INSPECTION
THE QC MANAGER, THE SUPERINTENDENT, OR OTHER
CONTRACTOR MANAGEMENT PERSONNEL AND THE KO WILL BE IN
ATTENDANCE AT THIS INSPECTION. ADDITIONAL GOVERNMENT
PERSONNEL MAY BE IN ATTENDANCE. THE FINAL ACCEPTANCE
INSPECTION WILL BE FORMALLY SCHEDULED BY THE KO BASED
UPON RESULTS OF THE "PRE-FINAL
INSPECTION". NOTICE SHALL BE GIVEN TO THE KO AT LEAST 14
DAYS PRIOR TO THE FINAL INSPECTION. THE NOTICE SHALL STATE
THAT ALL SPECIFIC ITEMS PREVIOUSLY IDENTIFIED TO THE
CONTRACTOR AS BEING UNACCEPTABLE WILL BE
COMPLETE BY THE DATE SCHEDULED FOR THE FINAL
ACCEPTANCE INSPECTION. FAILURE OF THE CONTRACTOR TO
HAVE ALL CONTRACT WORK ACCEPTABLY COMPLETE FOR THIS
INSPECTION WILL BE CAUSE FOR THE KO TO BILL THE
CONTRACTOR FOR THE GOVERNMENT'S ADDITIONAL INSPECTION
COST IN ACCORDANCE WITH THE CONTRACT CLAUSE "INSPECTION
OF CONSTRUCTION".
1.13 TRAFFIC CONTROL PLAN
SUBMIT A TRAFFIC CONTROL PLAN FOR JOINTING ON THE AIRFIELD
TO INCLUDE RIGHT OF WAY, RADIO COMMUNICATION, FOD CHECKS
AND HAUL ROUTES. DO NOT PERMIT VEHICULAR OR HEAVY
EQUIPMENT TRAFFIC ON THE PAVEMENT IN THE AREA OF THE
JOINTS BEING SEALED DURING THE PROTECTION AND CURING
PERIOD OF THE SEALANT. CONTRACTOR SHALL PROVIDE AND
MAINTAIN LOW PROFILE BARRIERS WITH LIGHTS, WEIGHTED BY
WATER FOR THE DURATION OF CLOSED PERIODS. PERMIT
TRAFFIC ON THE PAVEMENT AT THE END OF THE CURING PERIOD.
1.14 ENVIRONMENTAL PROTECTION PLAN
SUBMIT ENVIRONMENTAL PROTECTION PLAN INDICATING BEST
MANAGEMENT PRACTICES FOR STORM WATER PROTECTION, AIR
POLLUTION, NOISE PREVENTION, AND WILDLIFE PROTECTION AS IT
PERTAINS TO THE EQUIPMENT IN MAINTAINING COMPLIANCE WITH
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. THE
PLAN SHALL BE SUBMITTED PRE-CONSTRUCTION AND APPROVED
BY THE BASE ENVIRONMENTAL OFFICE.
1.15 SAFETY DATA SHEETS (SDS)
SUBMIT ALL SDS FOR PRODUCTS AND MATERIALS USED ON THIS
PROJECT. THESE INCLUDE TEMPORARY AND PERMANENT
MATERIALS USED AND STORED IN THE LAYDOWN YARD OR
APPLIED TO THE PROJECT SITE LOCATIONS.
1.16 HAZARDOUS WASTE RECORDS
SUBMIT ALL WASTE RECORDS FOR MATERIAL REMOVED OFF-SITE
AS PART OF THE FINAL INSPECTION RECORDS.
1.17 SECURITY FREE ZONES
AUTHORIZATIONS ARE REQUIRED FOR THE CONTRACTOR TO
WORK IN RESTRICTED AREAS. FOLLOW CONSTRUCTION PHASING
HAUL ROUTES AND REQUIREMENTS AS INDENTIFIED ON THE
DRAWINGS. PAY ATTENTION TO ANY RED LINES AND RESTRICTED
AREA SIGNAGE.
1.18 HAZARDOUS MATERIALS
SUBMIT ALL HAZARDOUS MATERIALS PROPOSED FOR USE ON THE
PROJECT. THIS LIST IS REQUIRED TO BE APPROVED PRIOR TO
BEING BROUGHT ONTO THE INSTALLATION BY CEV. A SDS FOR
EACH HAZARDOUS CHEMICAL AND AN ESTIMATED USAGE AMOUNT
MUST BE INCLUDED IN THE SUBMITTAL.
1.19 PROJECT SCHEDULE
PREPARE FOR APPROVAL A PROJECT SCHEDULE, AS SPECIFIED
HEREIN, PURSUANT TO THE FAR 52.236-15 “SCHEDULES FOR
CONSTRUCTION CONTRACTS”. SHOW IN THE SCHEDULE THE
SEQUENCE IN WHICH THE CONTRACTOR PROPOSES TO PERFORM
THE WORK AND DATES ON WHICH THE CONTRACTOR
CONTEMPLATES STARTING AND COMPLETING ALL SCHEDULE
ACTIVITIES. THE SCHEDULING OF CONSTRUCTION IS THE
RESPONSIBILITY OF THE CONTRACTOR. PROVIDE A SCHEDULE
THAT IS A FORWARD PLANNING AS WELL AS A PROJECT
MONITORING TOOL.
1.20 CRITICAL PATH METHOD
THE CRITICAL PATH METHOD OF NETWORK CALCULATION SHALL
BE USED TO GENERATE THE PROJECT SCHEDULE.
1.21 WARRANTY MANAGEMENT PLAN
THE CONTRACTOR SHALL DEVELOP A WARRANTY MANAGEMENT
PLAN WHICH SHALL CONTAIN INFORMATION RELEVANT TO THE
CLAUSE "WARRANTY OF CONSTRUCTION" IN FAR 52.246-21. AT
LEAST THIRTY (30) CALENDAR DAYS BEFORE THE PLANNED
PRE-WARRANTY CONFERENCE, THE CONTRACTOR SHALL SUBMIT
THE WARRANTY MANAGEMENT PLAN FOR GOVERNMENT
APPROVAL. THE WARRANTY MANAGEMENT PLAN SHALL INCLUDE
ALL REQUIRED ACTIONS AND DOCUMENTS TO ASSURE THAT THE
GOVERNMENT RECEIVES ALL WARRANTIES TO WHICH IT IS
ENTITLED. THE PLAN SHALL BE IN NARRATIVE FORM AND CONTAIN
SUFFICIENT DETAIL TO RENDER IT SUITABLE FOR USE BY FUTURE
MAINTENANCE AND REPAIR PERSONNEL, WHETHER TRADESMEN,
OR OF ENGINEERING BACKGROUND, NOT NECESSARILY FAMILIAR
WITH THIS CONTRACT. THE TERM "STATUS" AS INDICATED BELOW
SHALL INCLUDE DUE DATE AND WHETHER ITEM HAS BEEN
SUBMITTED OR WAS ACCOMPLISHED. WARRANTY INFORMATION
MADE AVAILABLE DURING THE CONSTRUCTION PHASE SHALL BE
SUBMITTED TO THE CO FOR APPROVAL PRIOR TO EACH MONTHLY
PAY ESTIMATE. APPROVED INFORMATION SHALL BE ASSEMBLED IN
A BINDER AND SHALL BE TURNED OVER TO THE GOVERNMENT
UPON ACCEPTANCE OF THE WORK. THE CONSTRUCTION
WARRANTY PERIOD SHALL BEGIN ON THE DATE OF PROJECT
ACCEPTANCE AND SHALL CONTINUE FOR THE FULL PRODUCT
WARRANTY PERIOD. A JOINT 4 MONTH AND 9 MONTH WARRANTY
INSPECTION SHALL BE CONDUCTED, MEASURED FROM TIME OF
ACCEPTANCE, BY THE CONTRACTOR, CO AND THE CUSTOMER
REPRESENTATIVE. INFORMATION CONTAINED IN THE WARRANTY
MANAGEMENT PLAN SHALL INCLUDE, BUT SHALL NOT BE LIMITED
TO, THE FOLLOWING:
(A) ROLES AND RESPONSIBILITIES OF ALL PERSONNEL
ASSOCIATED WITH THE WARRANTY PROCESS, INCLUDING POINTS
OF CONTACT AND TELEPHONE NUMBERS WITHIN THE
ORGANIZATIONS OF THE CONTRACTORS, SUBCONTRACTORS,
MANUFACTURERS OR SUPPLIERS INVOLVED.
(B) LISTING AND STATUS OF DELIVERY OF ALL CERTIFICATES
OF WARRANTY FOR EXTENDED WARRANTY ITEMS, TO INCLUDE
ROOFS, HVAC BALANCING, PUMPS, MOTORS, TRANSFORMERS, AND
FOR ALL COMMISSIONED SYSTEMS SUCH AS FIRE PROTECTION
AND ALARM SYSTEMS, SPRINKLER SYSTEMS, LIGHTNING
PROTECTION SYSTEMS, ETC.
(C) A LIST FOR EACH WARRANTED EQUIPMENT, ITEM, AND
FEATURE OF CONSTRUCTION OR SYSTEM INDICATING:
1. NAME OF ITEM.
2. MODEL AND SERIAL NUMBERS.
3. LOCATION WHERE INSTALLED.
4. NAME AND PHONE NUMBERS OF MANUFACTURERS OR
SUPPLIERS.
5. NAMES, ADDRESSES AND TELEPHONE NUMBERS OF
SOURCES OF SPARE PARTS.
6. WARRANTIES AND TERMS OF WARRANTY. THIS SHALL
INCLUDE ONE-YEAR OVERALL WARRANTY OF CONSTRUCTION.
ITEMS WHICH HAVE EXTENDED WARRANTIES SHALL BE INDICATED
WITH SEPARATE WARRANTY EXPIRATION DATES.
7. CROSS-REFERENCE TO WARRANTY CERTIFICATES AS
APPLICABLE.
8. STARTING POINT AND DURATION OF WARRANTY PERIOD.
9. SUMMARY OF MAINTENANCE PROCEDURES REQUIRED TO
CONTINUE THE WARRANTY IN FORCE.
10. CROSS-REFERENCE TO SPECIFIC PERTINENT OPERATION
AND MAINTENANCE MANUALS.
11. ORGANIZATION, NAMES AND PHONE NUMBERS OF PERSONS
TO CALL FOR WARRANTY SERVICE.
12. TYPICAL RESPONSE TIME AND REPAIR TIME EXPECTED FOR
VARIOUS WARRANTED EQUIPMENT.
(A) THE CONTRACTOR'S PLANS FOR ATTENDANCE AT THE 4
AND 9 MONTH POST-CONSTRUCTION WARRANTY INSPECTIONS
CONDUCTED BY THE GOVERNMENT.
(B) PROCEDURE AND STATUS OF TAGGING OF ALL EQUIPMENT
COVERED BY EXTENDED WARRANTIES.
(C) COPIES OF INSTRUCTIONS TO BE POSTED NEAR SELECTED
PIECES OF EQUIPMENT WHERE OPERATION IS CRITICAL FOR
WARRANTY AND/OR SAFETY REASONS.
1.22 SPILLS
ALL PERSONNEL (GOVERNMENT AND CONTRACTOR) ARE
REQUIRED TO FOLLOW THE FACILITY RESPONSE PLAN (FRP) & THE
SPILL PREVENTION, CONTROL, AND COUNTERMEASURES (SPCC)
PLAN. ANY RELEASE A CONTRACTOR OR SUB-CONTRACTOR IS
INVOLVED IN (FUEL, OIL, HAZMAT) THE CONTRACTOR IS
RESPONSIBLE FOR REPORTING AND CLEAN-UP, DISPOSAL OF
SPILT MATERIAL, RESPONSE ITEMS USED, AND SOIL OR OTHER
CONTAMINATED ITEMS. CONTRACTOR IS TO REPORT THE SPILL
(PER SPCC/FRP), SAME DAY, TO CEV AND ANY OTHER PERTINENT
PARTY. TRANSMIT REPORTS AT INTERVALS INDENTIFIED IN TABLE
4.1.
1.23 SOLID WASTE/RECYCLING
CONTRACTORS WILL PROVIDE QUARTERLY AND ANNUAL (FY
CALENDAR), AND PROJECT COMPLETION REPORTS TO CEV FOR
MATERIALS DISPOSED AND DIVERTED. REPORTS WILL CONTAIN,
AT A MINIMUM, MATERIAL DISPOSED/RECYCLED, POUNDS/TONS OF
MATERIAL RECYCLED/DISPOSED, LOCATION MATERIAL IS
RECYCLED/DISPOSED (LANDFILL OR COMPANY), DATE MATERIAL
LEFT THE SITE, AND ANY OTHER PERTINENT INFORMATION.
CONTRACTOR SHALL PROVIDE, WITH REPORTS, WEIGHT TICKETS
FOR MATERIAL RECYCLED/DISPOSED.
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
C001
CI
VI
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
SECTION 2 - SEALING CRACKS IN PAVEMENT
2.0 QUALITY ASSURANCE
TEST THE CRACK SEALANT AND BACKUP MATERIALS FOR
CONFORMANCE WITH THE REFERENCED APPLICABLE MATERIAL
SPECIFICATION. PERFORM TESTING OF THE MATERIALS IN AN
APPROVED, INDEPENDENT LABORATORY; SUBMIT CERTIFIED
COPIES OF THE TEST REPORTS FOR APPROVAL 3 DAYS PRIOR
TO THE USE OF THE MATERIALS AT THE JOB SITE. SUBMIT
REPORTS OF ALL TESTS. SAMPLES WILL BE RETAINED BY THE
GOVERNMENT FOR POSSIBLE FUTURE TESTING, IF THE
MATERIALS APPEAR DEFECTIVE DURING OR AFTER
APPLICATION. FURNISH SAMPLES OF MATERIALS, IN
SUFFICIENT QUANTITY TO BE TESTED BY THE GOVERNMENT
UPON REQUEST. CONFORMANCE WITH THE TEST
REQUIREMENTS OF THE LABORATORY TESTS SPECIFIED WILL
NOT CONSTITUTE FINAL ACCEPTANCE OF THE MATERIALS.
FINAL ACCEPTANCE WILL BE BASED ON THE PERFORMANCE OF
MATERIALS THAT HAVE BEEN SATISFACTORILY INSTALLED.
2.1 ENVIRONMENTAL REQUIREMENTS
APPLY THE MATERIALS ONLY WHEN THE AMBIENT AIR
TEMPERATURE AND THE PAVEMENT TEMPERATURE WITHIN THE
JOINT WALL ARE AT LEAST 40 DEGREES F AND RISING. DO NOT
APPLY SEALANT IF MOISTURE IS OBSERVED IN THE CRACK.
2.2 ACCEPTANCE
2.2.1 CRACK SEALANT
INSPECT THE CRACK SEALANT FOR PROPER CURE AND RATE
OF SET, TACK FREE SURFACE, BONDING TO THE BITUMINOUS
PAVEMENT, COHESIVE SEPARATION WITHIN THE SEALANT,
REVERSION TO LIQUID, AND ENTRAPPED AIR AND VOIDS.
REMOVE SEALANTS EXHIBITING ANY OF THESE DEFICIENCIES,
AT ANY TIME PRIOR TO THE FINAL ACCEPTANCE OF THE
PROJECT, AND REPLACE AS SPECIFIED HEREIN.
2.2.2 TEST SECTION
PRIOR TO THE CLEANING AND SEALING OF THE CRACKS FOR
THE ENTIRE PROJECT, CONSTRUCT A TEST SECTION AT LEAST
200 FEET LONG USING THE SPECIFIED MATERIALS AND
APPROVED EQUIPMENT TO DEMONSTRATE THE PROPOSED
PREPARATION AND SEALING OF ALL CRACKS OF THE PROJECT.
FOLLOWING THE COMPLETION OF THE TEST SECTION AND
BEFORE ANY OTHER CRACK IS SEALED, INSPECT THE TEST
SECTION TO DETERMINE THAT THE MATERIALS AND
INSTALLATION MEET THE REQUIREMENTS SPECIFIED. IF
MATERIALS OR INSTALLATION DO NOT MEET REQUIREMENTS,
REMOVE THE MATERIALS AND RECLEAN AND RESEAL THE
CRACKS. WHEN THE TEST SECTION MEETS THE
REQUIREMENTS, IT CAN BE INCORPORATED INTO THE
PERMANENT WORK AND ACCEPTED FOR PAYMENT. SEAL ALL
OTHER CRACKS IN THE MANNER APPROVED AND
SUCCESSFULLY COMPLETED FOR SEALING THE TEST SECTION.
2.3 SEALANTS
PROVIDE CRACK SEALANT CONFORMING TO ASTM D6690, TYPE
AS SUITABLE OVER THE PERFORMANCE GRADE 64-22
TEMPERATURE RANGE FOR SEALING CRACKS. EMULSION
AE-90, AE-90'S, AE-150.
2.4 BACKER ROD MATERIALS
PROVIDE BACKER ROD MATERIAL THAT IS A COMPRESSIBLE,
NONSHRINKING, NONSTAINING, NONABSORPTIVE MATERIAL
AND NONREACTIVE WITH THE CRACK SEALANT. USE BACKER
ROD WITH A MELTING POINT TEMPERATURE OF AT LEAST 5
DEGREES F GREATER THAN THE MAXIMUM POURING
TEMPERATURE OF THE SEALANT BEING USED, WHEN TESTED IN
ACCORDANCE WITH ASTM D789. USE MATERIAL THAT HAS A
WATER ABSORPTION OF NOT MORE THAN 5 PERCENT BY
WEIGHT WHEN TESTED IN ACCORDANCE WITH ASTM C509. USE
BACKER ROD MATERIAL THAT IS 25 PERCENT (PLUS OR MINUS 5
PERCENT) LARGER IN DIAMETER THAN THE NOMINAL WIDTH OF
THE CRACK.
2.5 EQUIPMENT, TOOLS, AND MACHINES
EQUIPMENT, TOOLS, AND MACHINES USED IN PERFORMANCE
OF THE WORK ARE SUBJECT TO APPROVAL BY THE
GOVERNMENT. MAINTAIN IN A SATISFACTORY WORKING
CONDITION AT ALL TIMES.
2.5.1 ROUTING EQUIPMENT
PROVIDE ROUTING EQUIPMENT WHICH IS A SELF-POWERED
MACHINE OPERATING A POWER DRIVEN TOOL OR BIT
SPECIFICALLY DESIGNED FOR ROUTING BITUMINOUS
PAVEMENTS. USE A BIT ROTATING ABOUT A VERTICAL AXIS AT
SUFFICIENT SPEED TO CUT A SMOOTH VERTICAL-WALLED
RESERVOIR IN THE PAVEMENT SURFACE AND MAINTAIN
ACCURATE CUTTING WITHOUT DAMAGING THE SIDES OR TOP
EDGES OF THE RESERVOIR. PROVIDE A ROUTER CAPABLE OF
FOLLOWING THE TRACE OF THE CRACK WITHOUT DEVIATION.
THE USE OF ROTARY IMPACT ROUTING DEVICES CAN BE
PERMITTED IF VERTICAL-SIDED CARBIDE TIPPED BITS ARE
USED.
2.5.2 AIR COMPRESSOR
PROVIDE AIR COMPRESSOR CAPABLE OF FURNISHING NOT
LESS THAN 150 CUBIC FEET PER MINUTE AND MAINTAINING A
LINE PRESSURE OF NOT LESS THAN 90 PSI AT THE NOZZLE.
EQUIP THE COMPRESSOR WITH FILTERS THAT MAINTAIN THE
COMPRESSED AIR FREE OF OIL AND WATER.
2.5.3 HEAT LANCE
PROVIDE A HEAT LANCE OPERATING WITH PROPANE AND
COMPRESSED AIR IN COMBINATION TO PROVIDE FLAME-FREE
HIGH TEMPERATURE HOT AIR UP TO 3000 DEGREES F WITH EXIT
VELOCITIES OF 3000 FEET PER SECOND.
2.5.4 HAND TOOLS
HAND TOOLS CAN BE USED, WHEN APPROVED, FOR REMOVING
DEFECTIVE SEALANT FROM CRACKS AND REPAIRING OR
CLEANING THE CRACK FACES.
2.5.5 CRACK SEALING EQUIPMENT
PROVIDE UNIT APPLICATORS, USED FOR HEATING AND
INSTALLING THE HOT-POURED CRACK SEALANT MATERIALS,
THAT ARE MOBILE AND EQUIPPED WITH A DOUBLE-BOILER,
AGITATOR-TYPE KETTLE WITH AN OIL MEDIUM IN THE OUTER
SPACE FOR HEAT TRANSFER; A DIRECT-CONNECTED
PRESSURE-TYPE EXTRUDING DEVICE WITH A NOZZLE SHAPED
FOR INSERTING IN THE PREPARED CRACK TO BE FILLED;
POSITIVE TEMPERATURE DEVICES FOR CONTROLLING THE
TEMPERATURE OF THE TRANSFER OIL AND SEALANT; AND A
RECORDING TYPE THERMOMETER FOR INDICATING THE
TEMPERATURE OF THE SEALANT. ALLOW THE SEALANT TO
CIRCULATE THROUGH THE DELIVERY HOSE AND RETURN TO
THE INNER KETTLE WHEN NOT IN USE.
2.6 PREPARATION OF CRACKS
IMMEDIATELY BEFORE THE INSTALLATION OF THE CRACK
SEALANT, THOROUGHLY DRY AND CLEAN THE CRACKS TO
REMOVE OXIDIZED PAVEMENT, LOOSE AGGREGATE AND
FOREIGN DEBRIS. PREPARE CRACKS AS FOLLOWS:
2.6.1 CRACKS
2.6.1.1 HAIRLINE CRACKS
CRACKS THAT ARE LESS THAN 1/4 INCH WIDE DO NOT NEED TO
BE SEALED.
2.6.1.2 SMALL AND MEDIUM CRACKS
ROUT CRACKS THAT ARE 1/4 TO 1-1/2 INCHES WIDE TO A
NOMINAL WIDTH
1/8 INCH GREATER THAN THE EXISTING NOMINAL WIDTH AND TO
A DEPTH NOT GREATER THAN 3/4 INCH. CLEAN AND DRY USING
COMPRESSED AIR OR A HEAT LANCE.
2.6.1.3 LARGE CRACKS
REFER TO THE DRAWINGS FOR REPAIR METHODS FOR LARGE
CRACKS.
2.6.2 EXISTING SEALANT REMOVAL
CUT LOOSE THE IN-PLACE SEALANT FROM BOTH CRACK FACES
AND TO A DEPTH SHOWN ON THE DRAWINGS. REMOVE
SEALANT TO A DEPTH SUFFICIENT TO ACCOMMODATE ANY
BACKER ROD MATERIAL THAT IS REQUIRED TO MAINTAIN THE
DEPTH OF NEW SEALANT TO BE INSTALLED. PRIOR TO
FURTHER CLEANING OPERATIONS, REMOVE ALL OLD LOOSE
SEALANT REMAINING IN THE CRACK OPENING BY BLOWING
WITH COMPRESSED AIR.
2.6.3 ROUTING
PERFORM ROUTING OF THE CRACKS USING A ROTARY ROUTER
WITH A BIT THAT IS AT LEAST 1/8 INCH WIDER THAN THE
NOMINAL WIDTH OF THE CRACK TO REMOVE ALL RESIDUAL OLD
SEALANT (RESEALING), OXIDIZED PAVEMENT AND ANY LOOSE
AGGREGATE IN THE CRACK WALL.
2.6.4 CLEANING
USE COMPRESSED AIR OR A HEAT LANCE TO CLEAN THE
CRACK FACES AND THE PAVEMENT SURFACES EXTENDING A
MINIMUM OF 1/2 INCH FROM THE CRACK EDGES. USE A
MULTIPLE-PASS TECHNIQUE UNTIL THE SURFACES ARE FREE
OF DUST, DIRT, OLD SEALANT RESIDUE, MOISTURE, OR
FOREIGN DEBRIS THAT MIGHT PREVENT THE SEALANT
MATERIAL FROM BONDING TO THE ASPHALT PAVEMENT. USE A
HEAT LANCE WHEN PAVEMENT TEMPERATURE IS LESS THAN 40
DEGREES F. DO NOT BURN THE PAVEMENT, A SLIGHT
DARKENING IS ACCEPTABLE. IMMEDIATELY FOLLOW THE HEAT
LANCE WITH THE SEALING OPERATION.
2.6.5 BACKER ROD MATERIAL
WHEN REQUIRED, USE BACKER ROD MATERIAL IN ALL CRACKS
THAT OTHERWISE WOULD REQUIRE EXCESSIVE SEALANT OR
EXCEED THE SEALANT RESERVOIR DEPTH. INSERT THE
BACKER ROD MATERIAL INTO THE LOWER PORTION OF THE
CRACK AS SHOWN ON THE DRAWINGS. PLACE THE BACKER
ROD SO THAT THE TOP OF THE BACKER ROD IS A MAXIMUM OF
3/4 INCH AND A MINIMUM WIDTH TO DEPTH RATIO OF 1 BELOW
THE TOP OF THE PAVEMENT. ENSURE THAT THE BACKER ROD
MATERIAL IS PLACED EVENLY AT THE SPECIFIED DEPTH AND IS
NOT STRETCHED OR TWISTED DURING INSTALLATION.
2.6.6 RATE OF PROGRESS OF CRACK PREPARATION
LIMIT THE STAGES OF CRACK PREPARATION, WHICH INCLUDE
ROUTING, AIR PRESSURE OR HEAT LANCE CLEANING AND
PLACING OF THE BACKER ROD MATERIAL, TO ONLY THAT
LINEAR FOOTAGE THAT CAN BE SEALED DURING THE SAME
DAY.
2.7 PREPARATION OF SEALANT
DO NOT HEAT HOT-POURED SEALANTS IN EXCESS OF THE SAFE
HEATING TEMPERATURE RECOMMENDED BY THE
MANUFACTURER, AS SHOWN ON THE SEALANT CONTAINERS.
WITHDRAW AND WASTE SEALANT THAT HAS BEEN
OVERHEATED OR SUBJECTED TO APPLICATION TEMPERATURES
FOR OVER 4 HOURS OR THAT HAS REMAINED IN THE
APPLICATOR AT THE END OF THE DAY'S OPERATION.
2.8 INSTALLATION OF SEALANT
SUBMIT MANUFACTURER'S INSTRUCTIONS 3 DAYS PRIOR TO
THE USE OF THE MATERIAL ON THE PROJECT. INSTALLATION
OF THE MATERIAL WILL NOT BE ALLOWED UNTIL THE
INSTRUCTIONS ARE RECEIVED.
2.8.1 TIME OF APPLICATION
SEAL CRACKS IMMEDIATELY FOLLOWING FINAL CLEANING AND
DRYING OF THE CRACK WALLS AND FOLLOWING THE
PLACEMENT OF THE BACKER ROD MATERIAL (WHEN
REQUIRED). PLACE SEALANT ONLY WHEN CRACKS ARE DRY.
RECLEAN CRACKS THAT CANNOT BE SEALED UNDER THE
CONDITIONS SPECIFIED, OR WHEN RAIN INTERRUPTS SEALING
OPERATIONS, AND ALLOW TO DRY OR DRY BY MECHANICAL
MEANS PRIOR TO INSTALLING THE SEALANT.
2.8.2 SEALING THE CRACK
IMMEDIATELY PRECEDING, BUT NOT MORE THAN 50 FEET
AHEAD OF THE CRACK SEALING OPERATIONS, PERFORM A
FINAL CLEANING AND DRYING WITH COMPRESSED AIR OR HEAT
LANCE. THIS DISTANCE CAN BE INCREASED IF DEMONSTRATED
AND APPROVED DURING THE TEST SECTION. FILL THE CRACKS
FROM THE BOTTOM OF RESERVOIR FORMED BY THE ROUTING
OR THE TOP OF THE BACKER ROD UP TO 1/4 INCH BELOW THE
PAVEMENT SURFACE. REMOVE EXCESS OR SPILLED SEALANT
FROM THE PAVEMENT BY APPROVED METHODS AND DISCARD
IT. INSTALL THE SEALANT IN A MANNER WHICH PREVENTS THE
FORMATION OF VOIDS AND ENTRAPPED AIR. MAKE MULTIPLE
PASSES WITH THE APPLICATOR WAND AS NECESSARY TO
OBTAIN THE SPECIFIED SEALANT DEPTH FROM THE PAVEMENT
SURFACE. DO NOT USE GRAVITY METHODS OR POURING POTS
TO INSTALL THE SEALANT MATERIAL. DO NOT PERMIT TRAFFIC
OVER NEWLY SEALED PAVEMENT UNTIL AUTHORIZED. CHECK
SEALED CRACKS FREQUENTLY TO ENSURE THAT THE NEWLY
INSTALLED SEALANT IS CURED TO A TACK-FREE CONDITION
WITHIN 3 HOURS.
2.9 CLEANUP
UPON COMPLETION OF THE PROJECT, REMOVE UNUSED
MATERIALS FROM THE SITE AND LEAVE THE PAVEMENT IN A
CLEAN CONDITION.
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
2JUNE 2024
CTGB232002
C002
CI
VI
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
SECTION 3 - SEALING JOINTS IN PAVEMENT
3.1 TEST REQUIREMENTS
TEST THE SEALANT AND BACKUP OR SEPARATING MATERIAL FOR
CONFORMANCE WITH THE REFERENCED MATERIAL SPECIFICATION.
PERFORM TESTING OF THE MATERIALS IN AN APPROVED
INDEPENDENT LABORATORY AND SUBMIT CERTIFIED COPIES OF
THE TEST REPORTS FOR APPROVAL 3 DAYS PRIOR TO THE USE OF
THE MATERIALS AT THE JOB SITE. SUBMIT SAMPLES TO BE
RETAINED BY THE GOVERNMENT FOR POSSIBLE FUTURE TESTING IF
THE MATERIALS APPEAR DEFECTIVE DURING OR AFTER
APPLICATION. CONFORMANCE WITH THE REQUIREMENTS OF THE
LABORATORY TESTS SPECIFIED DOES NOT CONSTITUTE FINAL
ACCEPTANCE OF THE MATERIALS. BASE FINAL ACCEPTANCE ON
THE PERFORMANCE OF THE IN-PLACE MATERIALS. SUBMIT
SAMPLES OF THE MATERIALS (SEALANT, PRIMER IF REQUIRED, AND
BACKUP MATERIAL), IN SUFFICIENT QUANTITY FOR TESTING AND
APPROVAL 3 DAYS PRIOR TO THE BEGINNING OF WORK. DO NOT
USE MATERIAL UNTIL IT HAS BEEN APPROVED.
3.2 TRIAL JOINT SEALANT INSTALLATION
PRIOR TO CLEANING AND SEALING THE JOINTS FOR THE ENTIRE
PROJECT, PREPARE A TEST SECTION AT LEAST 200 FT LONG USING
THE SPECIFIED MATERIALS AND APPROVED EQUIPMENT, SO AS TO
DEMONSTRATE THE PROPOSED JOINT PREPARATION AND SEALING
OF THE TYPES OF JOINTS IN THE PROJECT. FOLLOWING THE
COMPLETION OF THE TEST SECTION AND BEFORE ANY OTHER
JOINT IS SEALED, INSPECT THE TEST SECTION TO DETERMINE THAT
THE MATERIALS AND INSTALLATION MEET THE REQUIREMENTS
SPECIFIED. INSPECT JOINT SEAL TEST SECTION. CORRECT
DEFICIENCIES AND OBTAIN APPROVAL OF TEST SECTION PRIOR TO
INSTALLING JOINT SEALS. IF IT IS DETERMINED THAT THE
MATERIALS OR INSTALLATION DO NOT MEET THE REQUIREMENTS,
REMOVE THE MATERIALS, AND RECLEAN AND RESEAL THE JOINTS
AT NO COST TO THE GOVERNMENT. PREPARE AND SEAL OTHER
JOINTS IN THE MANNER APPROVED FOR SEALING THE TEST
SECTION. NOTIFY THE CONTRACTING OFFICER UPON COMPLETION
OF THE TEST SECTION.
3.3 JOINT SEALANTS
PROVIDE JOINT SEALANT CONFORMING TO ASTM D5893, AASHTO
M220, AND AASHTO M324 TYPE2 FOR SILICONE JOINT SEALANT,
PREFORMED JOINT MATERIAL, HOT POUR (ASPHALT) JOINT
SEALANT, RESPECTIVELY, BASED ON THE JOINT TYPE INDICATED IN
THE DRAWINGS.
3.4 PRIMERS
USE PRIMERS IN ACCORDANCE WITH THE RECOMMENDATION OF
THE MANUFACTURER.
3.5 BOND BREAKERS
3.5.1 BLOCKING MEDIA/BACKUP MATERIALS
PROVIDE BACKUP (JOINT FILLER) MATERIAL THAT IS A
COMPRESSIBLE, NONSHRINKING, NONSTAINING, NONABSORBING,
NONREACTIVE MATERIAL WITH THE SEALANT. USE BACKUP
MATERIAL COMPLIANT WITH ASTM D5249. USE MATERIAL WITH A
MELTING POINT AT LEAST 5 DEGREES F GREATER THAN THE
POURING TEMPERATURE OF THE SEALANT BEING USED WHEN
TESTED IN ACCORDANCE WITH ASTM D789. USE MATERIAL WITH A
WATER ABSORPTION OF NOT MORE THAN 5 PERCENT OF THE
SAMPLE WEIGHT WHEN TESTED IN ACCORDANCE WITH ASTM C1016.
USE BACKUP (JOINT FILLER) MATERIAL THAT IS 25 PLUS OR MINUS 5
PERCENT LARGER IN DIAMETER THAN THE NOMINAL WIDTH OF THE
CRACK. USE BLOCKING MEDIA CONSISTENT WITH THE SEALANT
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
3.5.2 BOND BREAKING TAPES
PROVIDE A BOND BREAKING TAPE OR SEPARATING MATERIAL THAT
IS A FLEXIBLE, NONSHRINKABLE, NONABSORBING, NONSTAINING,
AND NONREACTING ADHESIVE-BACKED TAPE. USE MATERIAL WITH
A MELTING POINT AT LEAST 5 DEGREES F GREATER THAN THE
POURING TEMPERATURE OF THE SEALANT BEING USED WHEN
TESTED IN ACCORDANCE WITH ASTM D789. USE BOND BREAKER
TAPE APPROXIMATELY 1/8 IN WIDER THAN THE NOMINAL WIDTH OF
THE JOINT AND THAT DOES NOT BOND TO THE SEALANT. USE BOND
BREAKING TAPE CONSISTENT WITH THE SEALANT
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
3.6 EXECUTING EQUIPMENT
SUBMIT EQUIPMENT LIST AND DESCRIPTION OF THE EQUIPMENT TO
BE USED AND A STATEMENT FROM THE SUPPLIER OF THE SEALANT
THAT THE PROPOSED EQUIPMENT IS ACCEPTABLE FOR INSTALLING
THE SPECIFIED SEALANT. USE EQUIPMENT FOR HEATING, MIXING,
AND INSTALLING SEALS IN ACCORDANCE WITH THE INSTRUCTIONS
PROVIDED BY THE SEALANT MANUFACTURER. PROVIDE
EQUIPMENT, TOOLS, AND ACCESSORIES NECESSARY TO CLEAN
EXISTING JOINTS AND INSTALL LIQUID JOINT SEALANTS. MAINTAIN
MACHINES, TOOLS, AND OTHER EQUIPMENT IN PROPER WORKING
CONDITION. SUBMIT A LIST OF PROPOSED EQUIPMENT TO BE USED
IN PERFORMANCE OF CONSTRUCTION WORK INCLUDING
DESCRIPTIVE DATA, 3 DAYS PRIOR TO USE ON THE PROJECT.
3.6.1 JOINT CLEANING EQUIPMENT
3.6.1.1 CONCRETE SAW
PROVIDE A SELF-PROPELLED POWER SAW, WITH WATER-COOLED
DIAMOND OR ABRASIVE SAW BLADES, FOR CUTTING JOINTS TO THE
DEPTHS AND WIDTHS SPECIFIED, FOR REFACING JOINTS, CLEANING
SAWED JOINTS WHERE SANDBLASTING DOES NOT PROVIDE A
CLEAN JOINT, WIDENING, OR DEEPENING EXISTING JOINTS AS
SPECIFIED WITHOUT DAMAGING THE SIDES, BOTTOM, OR TOP EDGE
OF JOINTS. PERMIT SINGLE OR GANG TYPE BLADES WITH ONE OR
MORE BLADES MOUNTED IN TANDEM FOR FAST CUTTING. SELECT
SAW ADEQUATELY POWERED AND SIZED TO CUT SPECIFIED
OPENING WITH NOT MORE THAN TWO PASSES OF THE SAW
THROUGH THE JOINT.
3.6.1.2 AIR COMPRESSOR
USE A PORTABLE AIR COMPRESSOR CAPABLE OF OPERATING THE
SANDBLASTING EQUIPMENT AND CAPABLE OF BLOWING OUT SAND,
WATER, DUST ADHERING TO SIDEWALLS OF CONCRETE, AND
OTHER OBJECTIONABLE MATERIALS FROM THE JOINTS. USE A
COMPRESSOR THAT PROVIDES AIR AT A PRESSURE NOT LESS THAN
90 PSI AND A MINIMUM RATE OF 150 CUBIC FT OF AIR PER MINUTE
AT THE NOZZLES AND FREE OF OIL.
3.6.1.3 VACUUM SWEEPER
USE A SELF-PROPELLED, VACUUM PICKUP SWEEPER CAPABLE OF
COMPLETELY REMOVING LOOSE SAND, WATER, JOINT MATERIAL,
AND DEBRIS FROM PAVEMENT SURFACE.
3.6.1.4 HAND TOOLS
PERMIT THE USE OF HAND TOOLS, SUCH AS BROOMS AND CHISELS,
WHEN APPROVED, FOR REMOVING DEFECTIVE SEALANT FROM A
CRACK AND REPAIRING OR CLEANING THE CRACK FACES.
3.6.2 SEALING EQUIPMENT
USE JOINT SEALING EQUIPMENT OF A TYPE REQUIRED BY THE
SEALANT MANUFACTURER'S INSTALLATION INSTRUCTIONS. USE
EQUIPMENT CAPABLE OF INSTALLING SEALANT TO THE DEPTHS,
WIDTHS AND TOLERANCES INDICATED. DO NOT PROCEED WITH
JOINT SEALING WHEN MALFUNCTIONS ARE NOTED UNTIL THE
MALFUNCTIONS ARE CORRECTED.
3.6.2.1 COLD-APPLIED, SINGLE-COMPONENT SEALING EQUIPMENT
USE EQUIPMENT FOR INSTALLING ASTM D5893/D5893M SINGLE
COMPONENT JOINT SEALANTS THAT CONSISTS OF AN EXTRUSION
PUMP, AIR COMPRESSOR, FOLLOWING PLATE, HOSES, AND NOZZLE
FOR TRANSFERRING THE SEALANT FROM THE STORAGE
CONTAINER INTO THE JOINT OPENING. USE A NOZZLE WITH
DIMENSIONS THAT ALLOWS THE TIP OF THE NOZZLE TO EXTEND
INTO THE JOINT TO ALLOW SEALING FROM THE BOTTOM OF THE
JOINT TO THE TOP. MAINTAIN THE INITIALLY APPROVED EQUIPMENT
IN GOOD WORKING CONDITION, SERVICED IN ACCORDANCE WITH
THE SUPPLIER'S INSTRUCTIONS, AND UNALTERED IN ANY WAY
WITHOUT OBTAINING PRIOR APPROVAL. USE LINED HOSES AND
SEALS TO PREVENT MOISTURE PENETRATION AND WITHSTAND
PUMPING PRESSURES. USE EQUIPMENT FREE OF CONTAMINATION
FROM PREVIOUSLY USED OR OTHER TYPE SEALANT. PERMIT USE
OF SMALL HAND-HELD AIR-POWERED EQUIPMENT (I.E., CAULKING
GUNS) FOR SMALL APPLICATIONS.
3.7 PREPARATION OF JOINTS
UNLESS OTHERWISE INDICATED, REMOVE EXISTING MATERIAL,
SAW, CLEAN AND RESEAL JOINTS. DO NOT PROCEED WITH FINAL
CLEANING OPERATIONS BY MORE THAN ONE WORKING DAY IN
ADVANCE OF SEALANT. CLEAN JOINTS BY REMOVING EXISTING
JOINT SEALING COMPOUND, BOND-BREAKERS, DIRT, LAITANCE,
CURING COMPOUND, FILLER, AND PROTRUSIONS OF HARDENED
CONCRETE FROM THE SIDES AND UPPER EDGES OF THE JOINT
SPACE TO BE SEALED AND OTHER FOREIGN MATERIAL WITH THE
EQUIPMENT. DO NOT PERMIT CLEANING PROCEDURES THAT
DAMAGE JOINTS OR PREVIOUSLY REPAIRED PATCHES BY CHIPPING
OR SPALLING. REMOVE EXISTING SEALANT TO THE REQUIRED
DEPTH. PRECISE SHAPE AND SIZE OF EXISTING JOINTS VARY, AND
CONDITIONS OF JOINT WALLS AND EDGES VARY AND INCLUDE BUT
ARE NOT LIMITED TO ROUNDING, SQUARE EDGES, SLOPING, CHIPS,
VOIDS, DEPRESSIONS, AND PROJECTIONS.
3.7.1 EXISTING SEALANT REMOVAL
CUT LOOSE THE IN-PLACE SEALANT FROM BOTH JOINT FACES AND
TO THE REQUIRED DEPTH, USING THE CONCRETE SAW AS
SPECIFIED IN PARAGRAPH 3.6.1. PROVIDE A DEPTH SUFFICIENT TO
ACCOMMODATE BLOCKING MEDIA AND BOND BREAKERS THAT ARE
REQUIRED TO MAINTAIN THE DEPTH OF NEW SEALANT TO BE
INSTALLED. FOR EXPANSION JOINTS, REMOVE EXISTING SEALANT
TO A DEPTH OF NOT LESS THAN 1 IN. WHEN EXISTING PREFORMED
EXPANSION-JOINT MATERIAL IS MORE THAN 1 IN BELOW THE
SURFACE OF THE PAVEMENT, REMOVE EXISTING SEALANT TO THE
TOP OF THE PREFORMED JOINT FILLER. PRIOR TO FURTHER
CLEANING OPERATIONS, REMOVE LOOSE OLD SEALANT REMAINING
IN THE JOINT OPENING BY BLOWING WITH COMPRESSED AIR.
PERMIT USE OF HAND TOOLS TO REMOVE SEALANT FROM RANDOM
CRACKS. DO NOT PERMIT CHIPPING, SPALLING, OR OTHER DAMAGE
TO THE CONCRETE. CLEAN PAVEMENT SURFRACE WITH VACUUM
SWEEP. PROTECT PREVIOUSLY CLEANED JOINTS FROM BEING
CONTAMINATED BY SUBSEQUENT CLEANING OPERATIONS.
3.8 SAWING
3.8.1 REFACING OF JOINTS
ACCOMPLISH REFACING OF JOINTS USING A CONCRETE SAW AS
SPECIFIED IN PARAGRAPH 3.6.1 TO REMOVE RESIDUAL OLD
SEALANT AND A MINIMUM OF CONCRETE FROM THE JOINT FACE TO
PROVIDE EXPOSURE OF NEWLY CLEANED CONCRETE, AND, IF
REQUIRED, TO ENLARGE THE JOINT OPENING TO THE WIDTH AND
DEPTH SHOWN ON THE DRAWINGS. PROVIDE EXPOSURE OF NEWLY
CLEAN CONCRETE THROUGH REMOVAL. REMOVE BURRS AND
IRREGULARITIES FROM SIDES OF JOINT FACES. STIFFEN THE BLADE
WITH A SUFFICIENT NUMBER OF DUMMY (USED) BLADES OR
WASHERS. CLEAN, IMMEDIATELY FOLLOWING THE SAWING
OPERATION, THE JOINT OPENING USING A WATER JET TO REMOVE
SAW CUTTINGS AND DEBRIS AND ADJACENT CONCRETE SURFACE.
PROTECT ADJACENT PREVIOUSLY CLEANED JOINT SPACES FROM
RECEIVING WATER AND DEBRIS DURING THE CLEANING OPERATION.
a. JOINT WIDENING (EXCEPT EXPANSION JOINTS): SAW JOINTS
HAVING GROOVES LESS THAN 3/8 IN WIDE AND LESS THAN 1 IN
DEEP TO A MINIMUM WIDTH OF 3/8 IN AND TO THE MINIMUM
DEPTH, OF 1 IN.
3.8.2 REFACING OF RANDOM CRACKS
ACCOMPLISH SAWING OF THE CRACKS USING A POWER-DRIVEN
CONCRETE SAW AS SPECIFIED IN PARAGRAPH 3.8.1. USE A SAW
BLADE 6 IN OR LESS IN DIAMETER TO ENABLE THE SAW TO FOLLOW
THE TRACE OF THE CRACK. STIFFEN THE BLADE WITH DUMMY (OR
USED) BLADES OR WASHERS. IMMEDIATELY FOLLOWING THE
SAWING OPERATION, CLEAN THE CRACK OPENING USING A WATER
JET TO REMOVE SAW CUTTINGS AND DEBRIS.
3.8.3 FINAL CLEANING OF JOINTS
FOLLOWING REMOVAL OF EXISTING SEALANT, AND SAWING, AND
IMMEDIATELY BEFORE RESEALING, CLEAN NEWLY EXPOSED
CONCRETE JOINT FACES AND PAVEMENT SURFACE EXTENDING TO
A MINIMUM OF 1/2 IN UP TO 2 IN FROM EACH JOINT EDGE BY
SANDBLASTING UNTIL CONCRETE SURFACES IN THE JOINT SPACE
ARE FREE OF SEALANTS, DUST, DIRT, WATER AND OTHER FOREIGN
MATERIALS THAT PREVENT BONDING OF NEW SEALANTS TO THE
CONCRETE. USE SAND PARTICLES OF THE PROPER SIZE AND
QUALITY FOR THE WORK. PERFORM SANDBLASTING WITH
SPECIFIED NOZZLES, AIR COMPRESSOR, AND OTHER APPURTENANT
EQUIPMENT. POSITION NOZZLES TO CLEAN THE JOINT FACES.
MAKE AT LEAST TWO PASSES; ONE FOR EACH JOINT FACE. MAKE
AS MANY PASSES AS REQUIRED FOR PROPER CLEANING.
IMMEDIATELY PRIOR TO SEALING THE JOINT, BLOW OUT THE JOINT
SPACES WITH COMPRESSED AIR UNTIL COMPLETELY FREE OF
SAND, WATER, AND DUST. INSTALL JOINT SEALANTS TO DRY
JOINTS. REPLACE EXPANSION JOINT FILLER MATERIAL DAMAGED IN
PERFORMING THE WORK WITH NEW MATERIALS OF THE SAME TYPE
AND DIMENSIONS AS THE EXISTING MATERIAL, OR WITH
APPROPRIATE BLOCKING MEDIA.
3.8.4 BOND BREAKER
AT THE TIME THE JOINTS RECEIVE THE FINAL CLEANING AND ARE
DRY, INSTALL BOND BREAKER MATERIAL AS INDICATED WITH A
STEEL WHEEL OR OTHER APPROVED DEVICE.
3.8.4.1 BLOCKING MEDIA (BACKER ROD) (EXCEPT FOR EXPANSION
JOINTS)
WHEN THE JOINT OPENING IS OF A GREATER DEPTH THAN
INDICATED FOR THE SEALANT DEPTH, PLUG OR SEAL OFF THE
LOWER PORTION OF THE JOINT OPENING USING A BLOCKING
MEDIA/BACK-UP MATERIAL TO PREVENT THE ENTRANCE OF THE
SEALANT BELOW THE SPECIFIED DEPTH. TAKE CARE TO ENSURE
THAT THE BLOCKING MEDIA/BACKUP MATERIAL IS PLACED AT THE
SPECIFIED DEPTH AND IS NOT STRETCHED OR TWISTED DURING
INSTALLATION.
3.8.4.2 BOND BREAKING TAPE
WHERE INSERTS OR FILLER MATERIALS CONTAIN BITUMEN, OR THE
DEPTH OF THE JOINT OPENING DOES NOT ALLOW FOR THE USE OF
A BACKUP MATERIAL, INSERT A BOND BREAKER SEPARATING TAPE
TO PREVENT INCOMPATIBILITY WITH THE FILLER MATERIALS AND
THREE-SIDED ADHESION OF THE SEALANT. BOND THE TAPE TO THE
BOTTOM OF THE JOINT OPENING TO PREVENT IT FROM FLOATING
UP INTO THE NEW SEALANT.
3.8.5 RATE OF PROGRESS OF JOINT PREPARATION
LIMIT THE STAGES OF JOINT PREPARATION, INCLUDING
SANDBLASTING, AIR PRESSURE CLEANING AND PLACING OF THE
BACK-UP MATERIAL TO ONLY THAT LINEAL FOOTAGE THAT CAN BE
SEALED DURING THE SAME DAY.
3.8.6 DISPOSAL OF DEBRIS
SWEEP PAVEMENT SURFACE TO REMOVE EXCESS JOINT MATERIAL,
DIRT, WATER, SAND, AND OTHER DEBRIS BY VACUUM SWEEPERS
OR HAND BROOMS.
3.9 PREPARATION OF SEALANT
3.9.1 SINGLE-COMPONENT, COLD-APPLIED SEALANTS
INSPECT THE ASTM D5893/D5893M SEALANT AND CONTAINERS
PRIOR TO USE. REJECT MATERIALS THAT CONTAIN WATER, HARD
CAKING OF ANY SEPARATED CONSTITUENTS, NONREVERSIBLE JELL,
OR MATERIALS THAT ARE OTHERWISE UNSATISFACTORY. DO NOT
REJECT SEALANTS THAT EXHIBIT SETTLEMENT OF CONSTITUENTS
IN A SOFT MASS THAT CAN BE READILY AND UNIFORMLY REMIXED IN
THE FIELD WITH SIMPLE TOOLS.
3.10 INSTALLATION OF SEALANT
3.10.1 TIME OF APPLICATION
AFTER APPROVAL OF THE TEST SECTION, SEAL JOINTS
IMMEDIATELY FOLLOWING FINAL CLEANING AND PLACING OF BOND
BREAKERS. COMMENCE SEALING JOINTS WHEN WALLS ARE DUST
FREE AND DRY, AND WHEN WEATHER CONDITIONS MEET SEALANT
MANUFACTURER'S
INSTRUCTIONS. IF THE ABOVE CONDITIONS CANNOT BE MET, OR
WHEN RAIN INTERRUPTS SEALING OPERATIONS, RECLEAN AND
PERMIT THE JOINTS TO DRY PRIOR TO INSTALLING THE SEALANT.
3.10.2 SEALING JOINTS
DO NOT INSTALL JOINT SEALANT UNTIL JOINTS TO BE SEALED HAVE
BEEN INSPECTED AND APPROVED. INSTALL BOND BREAKER JUST
PRIOR TO POURING SEALANT. FILL THE JOINTS WITH SEALANT
FROM BOTTOM UP UNTIL JOINTS ARE UNIFORMLY FILLED SOLID
FROM BOTTOM TO TOP USING THE SPECIFIED EQUIPMENT FOR THE
TYPE OF SEALANT REQUIRED. FILL JOINTS TO 1/4 IN PLUS OR MINUS
1/16 IN BELOW TOP OF PAVEMENT, AND WITHOUT FORMATION OF
VOIDS OR ENTRAPPED AIR. DO NOT PERMIT GRAVITY METHODS OR
POURING POTS TO BE USED TO INSTALL THE SEALANT MATERIAL.
EXCEPT AS OTHERWISE PERMITTED, TOOL THE SEALANT
IMMEDIATELY AFTER APPLICATION TO PROVIDE FIRM CONTACT
WITH THE JOINT WALLS AND TO FORM THE INDICATED SEALANT
PROFILE BELOW THE PAVEMENT SURFACE. REMOVE EXCESS
SEALANT THAT HAS BEEN INADVERTENTLY SPILLED ON THE
PAVEMENT SURFACE. DO NOT PERMIT TRAFFIC OVER NEWLY
SEALED PAVEMENT UNTIL AUTHORIZED. WHEN A PRIMER IS
RECOMMENDED BY THE MANUFACTURER, APPLY IT EVENLY TO THE
JOINT FACES IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. CHECK SEALED JOINTS FREQUENTLY TO
ENSURE THAT NEWLY INSTALLED SEALANT IS CURED TO A
TACK-FREE CONDITION WITHIN THE SPECIFIED TIME. PROTECT NEW
SEALANT FROM RAIN DURING CURING PERIOD.
3.11 INSPECTION/FIELD QUALITY CONTROL
3.11.1 JOINT CLEANING
INSPECT JOINTS DURING THE CLEANING PROCESS TO CORRECT
IMPROPER EQUIPMENT AND CLEANING TECHNIQUES THAT DAMAGE
THE CONCRETE PAVEMENT IN ANY MANNER. APPROVE CLEANED
JOINTS PRIOR TO INSTALLATION OF THE SEPARATING OR BACK-UP
MATERIAL AND JOINT SEALANT.
3.11.2 SEALANT APPLICATION EQUIPMENT
INSPECT THE APPLICATION EQUIPMENT TO ENSURE CONFORMANCE
TO TEMPERATURE REQUIREMENTS, PROPER PROPORTIONING AND
MIXING (IF TWO-COMPONENT SEALANT) AND PROPER
INSTALLATION. SUSPEND OPERATIONS IF THERE IS EVIDENCES OF
BUBBLING, IMPROPER INSTALLATION, OR FAILURE TO CURE OR SET
UNTIL CAUSES OF THE DEFICIENCIES ARE DETERMINED AND
CORRECTED.
3.11.3 JOINT SEALANT
INSPECT THE JOINT SEALANT FOR PROPER RATE OF CURE AND SET,
BONDING TO THE JOINT WALLS, COHESIVE SEPARATION WITHIN THE
SEALANT, REVERSION TO LIQUID, ENTRAPPED AIR AND VOIDS.
REMOVE SEALANTS EXHIBITING THESE DEFICIENCIES PRIOR TO THE
FINAL ACCEPTANCE OF THE PROJECT FROM THE JOINT, WASTED,
AND REPLACE AT NO ADDITIONAL COST TO THE GOVERNMENT.
OBTAIN APPROVAL FOR EACH JOINT SEAL INSTALLATION.
3.12 FINAL ACCEPTANCE
REJECT SEALER THAT FAILS TO CURE PROPERLY, OR FAILS TO
BOND TO JOINT WALLS, OR REVERTS TO THE UNCURED STATE, OR
FAILS IN COHESION, OR SHOWS EXCESSIVE AIR VOIDS, BLISTERS,
SURFACE DEFECTS, SWELLING, OR OTHER DEFICIENCIES, OR IS
NOT PROPERLY RECESSED WITHIN INDICATED TOLERANCES.
REMOVE REJECTED SEALER AND RECLEAN AND RESEAL JOINTS.
PERFORM REMOVAL AND RESEAL WORK PROMPTLY BY AND AT THE
EXPENSE OF THE CONTRACTOR.
3.13 CLEAN-UP
UPON COMPLETION OF THE PROJECT, REMOVE UNUSED MATERIALS
FROM THE SITE AND LEAVE THE PAVEMENT IN A CLEAN CONDITION.
4.1 FUEL-RESISTANT SEALER.
FUEL-RESISTANT SEALER (FRS) MATERIAL IS A COMBINATION OF
COAL-TAR EMULSION, FINE AGGREGATE, WATER, AND
OCCASIONALLY OTHER ADDITIVES. THESE MATERIALS ARE MIXED IN
BATCHES AND APPLIED TO HMA SURFACES BY HAND, SPRAYER, OR
MECHANICAL SQUEEGEE. COAL-TAR EMULSION BINDER PROVIDES A
FUEL-RESISTANT SURFACE, AND THE FINE AGGREGATE PROVIDES
SKID RESISTANCE.
4.1.1 MATERIAL REQUIREMENTS.
THE BINDER MATERIAL USED IN AN FRS IS A COAL-TAR EMULSION.
THE COAL-TAR FUEL-RESISTANT SEALER IS SPECIFIED AS HAVING
TO MEET THE REQUIREMENTS OF ASTM D140, ASTM D 466, ASTM D
490, ASTM B117, ASTM D 529, ASTM D 2939, AND ASTM D244
4.1.2 EQUIPMENT.
VARIOUS TYPES OF HAND-HELD SQUEEGEES, BROOMS, AND OTHER
NON-MECHANICAL EQUIPMENT ARE NEEDED ON THE TYPICAL FRS
PROJECT.
4.1.3 SURFACE PREPARATION.
REMOVE ALL LOOSE MATERIAL FROM THE PAVEMENT SURFACE
PRIOR TO APPLICATION OF THE FRS. CLEAN AND SEAL CRACKS
WIDER THAN 3 MILLIMETERS (1/8 INCH) OR WITH VEGETATION PRIOR
TO APPLICATION OF THE FRS.
4.1.4 APPLICATION.
AFTER SUFFICIENT MIXING, POUR THE FRS MIXTURE DIRECTLY ON
THE PAVEMENT SURFACE AND SQUEEGEE ACROSS THE PAVEMENT
SURFACE. IN HOT WEATHER CONDITIONS WHERE THE PAVEMENT
SURFACE GETS HOT, APPLYING A FOG SPRAY OF WATER PRIOR TO
APPLICATION OF THE FRS MATERIAL ASSISTS IN BONDING THE FRS
TO THE PAVEMENT SURFACE. USE A MINIMUM OF TWO
APPLICATIONS OF THE FRS MATERIAL TO ELIMINATE THE
POSSIBILITY OF ANY CONTINUOUS, FULL-DEPTH VOIDS IN THE
WHEN POSSIBLE, MAKE EACH ADDITIONAL APPLICATION
PERPENDICULAR TO THE PREVIOUS WHENEVER POSSIBLE, PLACE
CONSECUTIVE LANES WHILE THE SEALER MIXTURE APPLIED IN THE
FIRST LANE IS STILL SEMI-FLUID AND WORKABLE. IF OPERATIONS
PRECLUDE FRESH WORKING JOINTS, ALLOW THE PREVIOUSLY LAID
PASS TO SET AND CURE SUFFICIENTLY SO THAT IT IS NOT
SCARRED, TORN, OR SCRAPED FROM THE PAVEMENT SURFACE
DURING THE PLACEMENT OF THE ADJOINING PASS.
4.1.5 CURING
FRSS CURE BY EVAPORATION OF THE WATER FROM THE SEALED
PAVEMENT SURFACE. SUNLIGHT AND WARMER TEMPERATURES
INCREASE THE RATE OF CURING. CURING TIME VARIES FROM 2 TO
24 HOURS DEPENDING ON THE THICKNESS OF FRS APPLIED AND
THE EXISTING CLIMATIC CONDITIONS. ENSURE FRSS ARE NOT
APPLIED WHEN FREEZING TEMPERATURES (<0 DEGREES C, <32
DEGREES F) ARE POSSIBLE WITHIN THE REQUIRED CURING TIME.
AD
D
ED
S
PE
C S
FO
R
F U
EL
-R
ES
IS
TA
N
T
SE
AL
ER
/2
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
VERSION
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
C101
SI
TE
P
LA
N, GR
EE
N
PE
RR
Y
PA
RK
IN
G
AP
RO
N
N
SCALE:SCALE:SCALE: 1" = 75'-0"
TRANSIENT AND MASS PARKING APRONS
C101
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
C102
SI
TE
P
LA
N, GR
EE
N
PE
RR
Y
TA
XI
W
AY
S
N
SCALE:SCALE:SCALE: 1" = 75'-0"
NOSE DOCK APRON
C102
N
SCALE:SCALE:SCALE: 1" = 75'-0"
POWER CHECK PAD
C102
N
SCALE:SCALE:SCALE: 1" = 75'-0"
TAXIWAY H
C102
N
SCALE:SCALE:SCALE: 1" = 75'-0"
TAXIWAY A
C102
N
SCALE:SCALE:SCALE: 1" = 75'-0"
TAXIWAY B
C102
C102
C102
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
C103
SI
TE
P
LA
N, GR
EE
N
PE
RR
Y
TA
XI
W
AY
S
N
SCALE:SCALE:SCALE: 1" = 150'-0"
TAXIWAY G
C103
SCALE:SCALE:SCALE: 1" = 100'-0"
TAXIWAY D
C102
N
SCALE:SCALE:SCALE: 1" = 100'-0"
TAXIWAY E
C103
N
N
SCALE:SCALE:SCALE: 1" = 150'-0"
TAXIWAY C
C103
KEY NOTES:
SEAL JOINTS ON SLABS ON TAXIWAY D, SEE DETAIL 6/C501
STA 00+00
STA 10+00
STA 02+00
STA 04+00
STA 06+00
STA 08+00
STA 12+00
STA 14+00
STA 24+00
STA 16+00
STA 18+00
STA 20+00
STA 22+00
STA 26+00
STA 28+00
STA 38+00
STA 30+00
STA 32+00
STA 34+00
STA 36+00
STA 38+00
STA 40+00
STA 42+00
STA 44+00
STA 46+00
STA 48+00
STA 50+00
STA 60+00
STA 52+00
STA 54+00
STA 56+00
STA 58+00
STA 62+00
STA 64+00
STA 66+00
STA 68+00
STA 70+00
STA 72+00
STA 74+00
STA 76+00
STA 78+00
STA 80+00
SU
BM
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
7, 8, W
AI
TEJA
W
OR
SK
I
PA
VE
ME
NT
JO
IN
TS
MA
IN
TA
IN
A
IR
FI
EL
D
1XXX 2022
CTGB232002
C104
SI
TE
P
LA
N, GR
EE
N
PE
RR
Y
TA
XI
W
AY
F
N
SCALE:SCALE:SCALE: 1" = 150'-0"
TAXIWAY F STA 00+00 - STA 38+00
C104
N
SCALE:SCALE:SCALE: 1" = 150'-0"
TAXIWAY F STA 38+00 - 79+00
C104
STA 42+00
STA 44+00
STA 46+00
STA 48+00
STA 50+00
STA 60+00
STA 52+00
STA 54+00
STA 56+00
STA 58+00
STA 62+00
STA 64+00
STA 66+00
STA 68+00
STA 70+00
STA 72+00
STA 82+00
STA 74+00
STA 76+00
STA 78+00
STA 80+00
STA 82+00
STA 84+00
STA 86+00
STA 88+00
STA 90+00
STA 93+00
STA 95+00
STA 105+00
STA 97+00
STA 101+00
STA 103+00
STA 107+00
STA 109+00
STA 111+00
STA 113+00
STA 115+00
STA 117+00
STA 119+00
STA 121+00
STA 125+00
STA 123+00
STA 99+00
STA 00+00
STA 10+00
STA 02+00
STA 04+00
STA 06+00
STA 08+00
STA 12+00
STA 14+00
STA 24+00
STA 16+00
STA 18+00
STA 20+00
STA 22+00
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .