Grissom_ISWM_(Refuse-Recycling)_FY17_PWS__31_Jan_2017.docx

DOCX document 2 MB Posted

Attached to
REFUSE COLLECTION SERVICE
Solicitation number
FA4654-18-R-0003
Issued by

About this file

Performance Work Statement

View the file

Other files

File Type Posted
Grissom_ISWM_(Refuse-Recycling)_FY17_PWS__updated_17_Jan_2018.docx DOCX document
Amendment_1_Refuse.docx DOCX document
RFIs_Answer.docx DOCX document
SCA.PDF PDF
Refuse_Solicitation.docx DOCX document
Grissom_ISWM_FY17_QASP_9_JAN_2017.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT FOR

INTEGRATED SOLID WASTE MANAGEMENT

Grissom Air Reserve Base (ARB) 31 January 2017

1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform integrated solid waste management at Grissom ARB. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and collection areas are in Appendix B.

1.1. COLLECTION REQUIREMENTS.

1.1.1. Main Base

1.1.1.1. Municipal Solid Waste. The Contractor shall empty refuse containers based on historical data for the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Details on size, routes, and frequencies shall be submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance. The Contractor may propose adjustments to the schedule at any time but as a minimum the Contracting Officer’s designated Representative (COR) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A, Table A2. When the Contractor completes service at a location there shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the container.

1.1.1.2. RESERVED

1.1.1.3. Recycling. The Contractor shall empty recycling containers based on historical data for the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Container size, routes, and frequencies should be established to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. They are to be submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance.

1.1.1.4. The Contractor may propose adjustments to the schedule at any time but as a minimum the Contracting Officer’s designated Representative (COR) (Quality Assurance Personnel) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A, Table A2. When the Contractor completes service at a location there shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the container.

1.1.2. RESERVED

1.1.3. Over and Above Requirements. The following services shall be priced separately in accordance with the cost contained in Exhibit A. The contractor shall be compensated IAW the price specified on Exhibit A for that service. The contractor shall be compensated IAW the unit price when these services are requested.

1.1.3.1. Unscheduled Pickup and Special Events. In addition to the scheduled solid waste collections, the CO or COR may request the contractor make unscheduled collections and disposals. For unscheduled events, the contractor shall respond within one business day of notification from the CO or COR. For special events, the contractor shall also provide (or re- position as directed) solid waste containers. These containers shall be placed in locations for a length of time designated by the CO or COR. The CO shall notify the contractor in writing at least 7 days in advance of the special event date. See Appendix A, Table A-1 for workload data.

1.1.3.2. RESERVED

1.1.3.3. RESERVED

1.1.3.4. RESERVED

1.1.3.5. RESERVED

1.1.3.6. Additional Pickups: In the event unusual conditions cause a container to require pickup before the scheduled time, the CO or COR may request in writing (email/Fax sufficient) pickup within 24 hours and the contractor will be compensated at a unit rate based on the container size.

1.1.3.7. Container Relocations: The Government may request relocation of containers. The request will be made in writing (email/FAX sufficient) and the container will be relocated within 72 hours.

1.1.4. Inclement Weather Schedule. The contractor shall collect MSW and recyclable material during periods of inclement weather. In cases of severe weather, the CO or COR may authorize exceptions. When exceptions are granted all missed collections shall be performed within 24 hours after the severe weather has terminated, unless the CO authorizes additional time.

1.1.5. Route Parameters. The contractor shall propose routes to the base through the Hoosier Boulevard Main Gate to the CO and COR for acceptance. Collection shall be made between the hours of 8:00 AM and 3:00 PM Monday through Friday. Collection outside these hours shall require prior coordination of the CO or COR.

1.1.6. Points of Collection. Collection stations for MSW and recyclable materials are shown in Appendix B. The contractor shall position bulk containers for customer ease in depositing MSW. The contractor shall also position containers to minimize interference with adjacent parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential obstructions.

1.1.7. Cubic Yard Capacity. Proposed capacity of containers is indicated in Appendix A, Table A2. The contractor is encouraged to identify changes to the capacity of containers and/or pickup frequency to improve the overall efficiency of MSW and recycling removal, and to submit these changes to the CO or COR. No changes shall be made until the proposed change is coordinated with the CO or COR.

1.1.8. Government-Approved Containers. Collection of MSW and recyclable materials in all areas shall be from contractor-provided, CO or COR accepted containers. Containers shall be solid dark brown for refuse and blue for recycling and any contractor identification (labels, stickers, etc.) must present a neat orderly appearance.

1.1.9. Maintaining Containers and Collection Area. The Contractor shall return all MSW and recycling containers to their original location after servicing, in an upright position with the lids securely in place (closed). The Contractor is responsible for cleaning up any spills, debris, etc., on the ground within 10 feet of the container when servicing a location. The contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. It is intended that the majority of debris will be placed in containers. The Contractor shall notify the COR of locations where debris is frequently placed outside of containers so the COR may notify facility managers and, if necessary, the Contractor can adjust the container size or pickup frequency with CO or COR approval. The contractor shall also notify the COR if it is discovered that a particular receptacle is being utilized for the wrong material (recyclable material).

1.1.10. Vehicle Weighing. All vehicles used to collect MSW and recyclable materials shall be weighed. The empty truck shall be weighed prior to entry to the base and weighed directly after servicing the containers. The Contractor shall submit a monthly report (para 1.5) that includes weight tickets that reflect the disposed tonnage, disposal date, vehicle type and landfill tipping fee cost. Government surveillance (spots checks) can be conducted at the contractors weigh station.

1.2. RECYCLABLE MATERIALS PROCESSING. The base operates a Qualified Recycling Program (QRP) to reduce the volume of non-hazardous solid waste generated. It is the intent of the base to conduct direct sales of recyclable commodities through a QRP. The contractor shall provide a detailed accounting of recyclable commodities sold (type / weight / price) to the QRP along with 100 percent of the sales proceeds.

1.2.1. Materials. The following items shall be recycled: Metal beverage containers, glass (clear, brown, green), office paper, newspaper, corrugated fiberboard / cardboard / pressboard, plastics, and scrap wood. Contractor may recycle materials not listed above with prior coordination of the CO or COR. All recyclable items shall be stored, shipped and disposed of in accordance with federal and local environmental regulations.

1.2.2. Pickup Points. Contractor shall provide recycling containers at the locations specified in Appendix A, Table A2. Containers shall be emptied as specified in section 1.1.1.3.

1.2.3. Base Recycling Center / Material Recovery Facility. The government will not provide the contractor use of the base recycling center. Alternately, the contractor shall transport mixed recyclables to a contractor-owned or third party off-base facility for separation and resale so long as government recyclable materials are sorted and weighed prior to commingling with other customers’ recyclables.

1.2.4. Marketing. The Contractor shall market recyclable commodities, which may include transporting commodities to buyers. The Contractor shall educate all residential and base facility occupants on the benefits of recycling and encourage the widest possible participation. Written publications such as original published pamphlets, brochures, or other informative media, may be used to inform users.

1.2.5. Sales Receipts. The contractor shall provide a Commodity Sales Summary to the COR, no later than the tenth working day of each month, consisting of commodity type sold, sales proceeds achieved by commodity and weights of commodity sold. Documentation to accompany the Commodity Sales Summary includes commodity sales receipts, commodity sold weight tickets, and reimbursement check for 100% of commodity sales proceeds. The contractor shall also submit an invoice for reimbursement for costs associated with conducing sales transactions, collection, processing commodities, and transporting to commodity buyers.

1.3. DISPOSAL.

1.3.1. Off-Base Disposal. The contractor shall transport and dispose of all municipal solid waste at a permitted off-base disposal site. A copy of the landfill(s) operating permit that material is transported to shall be provided to the CO. The contractor is responsible for disposal being in accordance with existing local, state, and federal regulations. The contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations and invoice to CLIN 0018 for reimbursement.

1.4. EQUIPMENT MAINTENANCE. The Contractor shall furnish containers that match the architectural/appearance standards of the base, (see 1.1.8). Additional re-painting must match the approved color scheme. The Contractor shall maintain all Contractor and Government provided containers so that they have a professional appearance and ensure they are free of unpleasant odors, dirt, debris, and pests. All containers must remain in good, workable condition, with no leaks. They must remain easily accessible to customers. The Contractor shall perform all cleaning, painting, repair and other maintenance tasks off-base. Trucks and trailers used for hauling and collecting shall be free of odor, dirt, debris, and pests. Contractor vehicles and equipment shall not have any waste or equipment leaks such as oil or hydraulic fluid. Should any contractor vehicles or equipment have any leaks, the contractor is responsible for cleanup.

1.5. REPORTS AND RECORDS. The Contractor shall provide a monthly report, by the fifth working day of the month, detailing the previous months total contract costs incurred, cumulative weight tickets for total tonnage of solid waste collected (MSW, C&D, organic, and recycling), tipping fees, weights diverted by recyclable commodity, cost to divert by recyclable commodity, and commodity sales proceeds reimbursed in sufficient detail to support Defense Environmental Programs Management requirements. ALL RECYCLABLE SALES RECEIPTS must accompany the report. Format for these monthly reports shall be coordinated with the CO or COR.

2. SERVICE SUMMARY. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance, and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each Performance Objective shall be allowed in an effort to identify normal phase-in problems.

Performance Objective
PWS para.
Performance Threshold

Collect Municipal Solid Waste/Recycle in accordance with the established schedule.

1.1
No more than 2 Customer Complaints monthly.
Dispose of Municipal Solid Waste in accordance with the established governing directives.
1.3
0 Deficiencies permitted.
Maintain equipment in good workable condition. Trucks and solid waste/recycle containers washed and free of odors.
1.4
No more than 2 Customer Complaints monthly.
Perform unscheduled collections required by the CO or COR in accordance with paragraph 1.1.
1.1.3.1
0 Deficiencies permitted. (Delivery order shall not be accepted until all deficiencies are corrected.)
Produce/maintain reports and records by fifth working day of the month
1.5
0 Deficiencies permitted.
Document weight tickets before and after servicing Grissom ARB
1.1.10
0 deficiencies permitted

2.1. QUALITY CONTROL

The contractor shall develop and maintain a quality program to ensure integrated solid waste management is performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Summary.

2.2. QUALITY ASSURANCE

The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The contractor shall provide work schedules to the COR in accordance with paragraph 4.3 of this PWS. The COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will use the Contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.

2.3 PERFORMANCE ASSESSMENT

2.3.1. Periodic Validations. This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.

2.3.2 Unsatisfactory Performance. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.

2.4. PERIODIC PROGRESS MEETINGS

2.4.1 Meetings. The CO, Functional Commander, COR, QRP Manager and/or Solid Waste Manager, other government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.

2.4.2. Meeting Minutes. The minutes of these meetings will be reduced to writing, signed by the CO, and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. NONE

3.1. RESERVED

4. GENERAL INFORMATION.

4.1. MISSION

The overall Civil Engineer mission at GRISSOM ARB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees.

4.2. RESERVED

4.3. HOURS OF OPERATION.

Perform integrated solid waste management services during normal duty hours and be available (by phone, pager, cell phone, text message or fax) during the Government Program Office’s hours (8:00 a.m. to 3:00 p.m., Monday through Friday) and for after-hours response to refuse/recycling problems or emergencies. This excludes federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the Contractor to work at times other than normal duty hours. When the Contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.

4.4 HOLIDAYS & CLOSURES

4.4.1 Recognized Federal Holidays. There may be federal holidays when the Contractor is not required to perform service, except in emergency situations or to support specific mission needs. The holidays are:

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day after the holiday observance.

4.4.2. Other Base Closures. Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening.

4.5. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY

The services under this contract are not essential for performance during crisis. The CO will determine circumstances which constitute a crisis based on direction from Security Forces and base leadership.

4.6. CONTRACTOR WORK SCHEDULE

4.6.1 Schedule Submission and Approval. The Contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for approval at the post-award conference. The schedule shall include routes, pickup points, times, and days that pickups will occur. The Contractor shall not deviate from the approved schedule without prior approval from the CO or COR. Permanent changes to the schedule must be submitted 10 days before implementation and receive CO approval before the Government will allow the proposed changes. The schedule must be submitted electronically using a file format compatible with Government software.

4.6.2 Schedule Changes. Occurrence based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR and do not require CO approval.

4.7. CONTRACT PERSONNEL

4.7.1. Contract Manager. The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the CO telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the CO the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.

4.7.2. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.

4.7.3. Employee Restrictions. The government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.8. CONTRACTOR MANPOWER REPORTING

The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk.

4.9. SECURITY REQUIREMENTS. Contractor employees shall comply with Grissom ARB security requirements imposed by the Installation Commander at all times while on Grissom ARB premises. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at Grissom ARB. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the Contractor. The Contractor shall comply with all Grissom ARB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, comprehend, read, and write English.

Just prior to entering the Main Installation Gate, the driver shall be required to cycle the contents of the truck in plain view of the posted 434th Security Forces Squadron (434th SFS) personnel. Upon exiting the installation through the Main Installation Gate, the driver again shall stop and cycle the contents of the truck while being observed by the 434th SFS. Once the cycle is complete the driver will be allowed to proceed off the installation.

To gain access to the flight line area the contractor shall call Maintenance Operations Center (MOC) (765) 688-2461/2462/2463 for escort to Bldg. 435, Bldg. 436, Bldg. 438, Bldg. 439, and Bldg. 760.

4.9.1. Base Access. The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.

4.9.2 Main Base Access. Current security access restrictions at Grissom ARB require all contractor vehicles (which are the size of a standard bread delivery truck or larger) to enter through the Hoosier Boulevard Main Gate only. Contractor vehicles may be subject to search prior to gaining base entry. The Contractor should plan and allow for delays as a result of increased and ever- changing security procedures.

4.9.3. Security Manager. Upon contract award, the Contractor shall designate, in writing to the CO, a Security Manager who shall be the Contractor’s point of contact for all security matters. Within 5 working days of contract award, the Contractor’s Security Manager shall contact the Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing Contractor personnel security requirements.

4.9.3.1. Security Training. Contractor personnel are required to attend security and OPSEC orientation under Homeland Security Presidential Directive (HSPD) Title 12. The Contractor shall schedule initial and annual refresher training (for all assigned contractor personnel) through the CES Security Manager. All contractor personnel shall be thoroughly briefed by the CES Security Manager on established security requirements and procedures as stipulated in Air Force Policy Directive (AFPD 31-1, Integrated Defense).

4.9.3.2 Security Authority. The Contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, COR, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.

4.9.4. Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.

4.9.4.1. Access Coordination. The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing ISWM duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.

4.9.4.2. Escorts. At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.

4.9.5. Employee Background Checks. All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check (NAC) for the performance of their duties, shall complete an Electronic Personnel Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES Security Manager.

4.9.5.1. Pre-approval Coordination. The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting. Appointments will be scheduled within two weeks of request.

4.9.5.2. Badge Issuance. A minimum of 180 days is required to process contractor employee NACs. Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.

4.9.5.3. Access Revocation. The Grissom ARB Installation Commander reserves the right to deny restricted area entry to any contractor employee whose NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the individual’s continued entry to a secure area is not in the best interest of national security.

4.9.5.4. Badge Validity. Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first. Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification. Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.

4.9.5.5. Contract Personnel Requirements. The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.9.6. Contractor Vehicles. Contractor vehicles must be maintained in a safe and operational condition at all times while on Grissom ARB.

4.9.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.9.8. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security or well-being of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

4.9.9. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

4.9.10. Key Control. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys. In the event keys other than master keys are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the contractor.

4.10. SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.

4.11. SPECIAL QUALIFICATIONS.

4.12. CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE. (QUALITY ASSURANCE PERSONNEL) The Contracting Officer will appoint a primary and alternate representative for management of the day to day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.

4.13. MULTI-FUNCTIONAL TEAM. The Senior Leadership may require a multi-functional team be established between the government and the contractor to ensure joint cooperation and a sound customer focus of all parties involved in the execution of this contract.

4.14. PARTNERING AGREEMENT

The CO may require a partnering agreement, or multi-functional team, between the Government and Contractor to facilitate joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a Government-Contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principal to share the risk involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing a partnering agreement. The partnering agreement that results may be formal or informal. If formal, it should be reduced to writing and signed by the parties involved.

4.15. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation.

5. APPENDICES.

A. Estimated Workload Data

B. Maps and/or Site Plans

APPENDIX A

TABLE A1 - ESTIMATED WORKLOAD DATA

ITEM/ CLIN REF

NAME

ANNUAL ESTIMATED QUANTITY

X001
Municipal Solid Waste, See Exhibit A
168
Tons
X001
Street Sweepings
65
Tons
X008
Unscheduled Pickups & Special events, See Exhibit A
X008
Special Event Container Placements, 6CY
1
Each
X008
Additional 6CY Container Pickups
1
Each
X008
6CY Container Relocations
1
Each
X003
Recyclable Commodity – Mixed (plastic, glass, metal)
8
Tons
X003
Scrap Wood
350
Tons
X003
Recyclable Commodity – Paper
40
Tons
X003
Recyclable Commodity – Cardboard
40
Tons

ONE WAY

Distance To Disposal Site
15
Miles

TABLE A2 - TASKS & ESTIMATED FREQUENCIES

COLLECTION STATION
LOCATION

(See Appendix B)

SIZE

TYPE

FREQUENCY

396
G2
2 CY
MSW
T
190
I4
2 CY
MSW
T
209
I2
2 CY
MSW
T
448
H2
2 CY
MSW
T
420
G2
2 CY
MSW
T
471
F3
6 CY (2)
MSW
T
472
E3
4 CY (2)
MSW
T
663
E3
6 CY
MSW
T
563
E1
2 CY
MSW
T
671
D3
2 CY
MSW
T
595, BX (AAFES)
D4
2 CY
MSW
T
597
D5
6 CY
MSW
T
596
C5
4 CY
MSW
T
600
D6
2 CY
MSW
T
760
Inset
4 CY
MSW
T
591
D5
2 CY
MSW
T
439
E4
6 CY
MSW
T
438
E4
6 CY
MSW
T
436
E4
2 CY
MSW
T
435
E4
6 CY
MSW
T
474
G4
4 CY
MSW
T
426
G3
4 CY
MSW
T
431
F3
4 CY
MSW
T
639, Army
C4
2 CY
MSW
T
648, Marines
A4
2 CY
MSW
T
687
B3
2 CY
MSW
T
641
C4
4 CY (2)
MSW
T
B4
20CY
Street sweepings
1 X month

RECYCLING

687
C4
6CY
Recycling
2 X month
687
C4
6CY
Recycling
2 X month
470
F3
6CY
Cardboard
2 X month
470
F3
8CY
Recycling
2 X month
687
C4
30CY
Scrap wood
1 X month
B4
30CY
Scrap wood
1 X month
687
C4
40 CY
Cardboard Compactor
2 X year
687
C4
40 CY
Paper Compactor
2 X year

APPENDIX B

MAPS AND/OR SITE PLANS

image1.emf

Microsoft_Word_Document1.docx

A B C

D E F G H I J

)" 600

1 - 2 CY

Atterb ury

Way )1

Capehart

A ve )Randolph St

)1 - 2 CY

Randolph St

Charlie Cred it Unio n

Dr Foreman Dr )Thunderbolt Ave 1

)" 1 - 2 CY

Lowry

Ave Kelly

Ave

Warrior

Ave Tanker St Harry

Foreman

)2 Tanker St 2

2 - 4 CY

(1) 8CY recycling (1)6CYcardboard

") 209

Inset

"683 1 - 2 CY

)1 - 6 CY

471b

)2 - 6 CY

") 1 - 2 CY

3 3

(2) ( Warthog St )6CY recycling

)(1) 30CY wood compactors

Hoosier Blvd

)671

1 - 4 CY

)426

(2)

)1 - 6 CY

)1 - 6CY

Boom Pl

4 ") 1 - 2 CY

(1) 30CY wood

2 - 4 CY

Boxcar St

1 - 6 CY

435 ")

)190

(1) CY St

Dragonfly LSnweeping

1 - 6 CY

Munitions

Grissom

Ave )5 5

)591

6 6

Bakalar Ln

Perimeter Rd At terbury

Way )7 7

Se xtant

Ln )Grissom ARB ISWM Location Map updated 30 JAN 2017 D E F G H I

A B C J image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image1.png image2.png image3.png image4.png image5.png

File details come from the government source that posted it.