Tab 1. NZAS 20-1003 RH Vertical Storage PEB Equipment Rental SOW FY26 (002).pdf

PDF 419 KB Posted

Attached to
PEB Equipment Rental
Solicitation number
FA462626Q0029
Issued by

About this file

This is a Statement of Work (SOW) for equipment rental services supporting the RED HORSE Vertical Storage Pre-Engineered Building (PEB) project at Malmstrom Air Force Base, Montana.

The contractor must deliver and provide rental services for five pieces of heavy construction equipment for a three-month period from July 6, 2026 through September 30, 2026. Required equipment includes two 20-yard dump bodies (CAT Class 952-7050 or equivalent), one padded drum roller (CAT CP44B or equivalent), one single drum vibratory roller (CAT Model CS44 or equivalent), and one loader with 2-4 cubic yard bucket (CAT 926 or equivalent). Each piece of equipment has estimated projected usage of 160 hours per month. All equipment must operate on construction-grade diesel fuel, and the contractor must provide diesel exhaust fluid replacements and refilling. Equipment must be delivered to Malmstrom AFB with a minimum of 48 hours' notice and delivered during standard business hours (7:00 AM to 4:00 PM, Monday through Friday) to specified coordinates. The contractor bears all transportation, delivery, and logistics costs.

The contractor is responsible for all routine preventative maintenance and field service repairs, with repairs required within 48 hours of notification. Normal wear-and-tear repairs are the contractor's responsibility; damage from negligence or operator error requires the contractor to provide three repair quotes for reimbursement consideration. If preventative maintenance exceeds eight hours, a suitable substitute must be provided within 24 hours. The contractor must designate a Montana-licensed qualified mechanic and provide a maintenance contact point. Additionally, the contractor must provide daily inspection checklists for each piece of equipment, maintain compliance with all DoD security procedures and federal regulations, and designate a supervisor capable of making decisions and available during all work hours who is fluent in English and possesses sufficient technical knowledge of the requirements.

View the file

Other files

File Type Posted
QA PEB.pdf PDF
Solicitation - FA462626Q0029.pdf PDF
PEB Equipment Rental SOW FY26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NZAS 20-1003 RED HORSE Vertical Storage PEB

Equipment Rental Contract Malmstrom AFB, MT

RENTAL EQUIPMENT

PART I - General Contract Requirements

1. General Requirements

1.1. Description of Work. The contractor shall provide all personnel, labor, supervision, management, supplies, tools, equipment, parts, materials, transportation, shipping & delivery, and all other items and services necessary for the Rental/Lease of heavy construction equipment for use at Malmstrom AFB, Montana. All work shall be accomplished in accordance with this Statement of Work (SOW), all applicable federal, state, local laws, regulations, manufacturer’s specifications, and commercial practices.

1.2. Contract Changes/Additional Work. At future dates, the government reserves the right to incorporate, add, remove, and/or modify quantities of work within the scope of this requirement. At times, due to the nature of work, it may be necessary to modify this requirement on an as-needed basis. Additionally, there may be a need for ‘one-time’ requirements or special sub-contracting opportunities in order to fulfill the requirement needs. Any future changes to this requirement will be negotiated and incorporated in the contact via contract modification, based on priced line items currently incorporated within the contract. Any future changes to the requirements specified in this document must be directed by the Contracting Officer (CO).

1.3. Delivery & Period of Performance (PoP). The contractor shall deliver the required equipment, ready for use Not Later Than (NLT) 6 July 2026 and make equipment available for rent/use between 6 July 2026 through 30 September 2026. The delivery of equipment will occur during standard business hours on Monday through Friday between 7:00AM and 4:00PM, however the times will fluctuate.

1.3.1. The Contractor shall be responsible for transporting the equipment to the construction site. The Government will make every effort to provide the Contractor the maximum amount of notice possible.

1.3.2. Notification of date and time of delivery will be made as early as possible for all equipment. A minimum of 48 hours prior to the required delivery date, the 819 RHS Project Manager will contact the provider to coordinate the date/time and specific location of deliveries.

1.3.3. All equipment is to be delivered to MAFB. See attachment for delivery location.

Commercial Gate Coordinates: 47.5164, 111.2129 Delivery Site Coordinates: 47.5048, 111.1929

1.3.4. Specific drop off location on site will be coordinated with the 819 RHS project manager, TSgt Kyle Munson (kyle.munson@us.af.mil) or TSgt Joshua Singleton (joshua.singleton.5@us.af.mil).

1.3.5. In the event of adverse weather events prohibiting safe delivery of equipment, the 819 RHS Project Manager will contact the contractor to coordinate rescheduling of delivery within the following 48 hours.

2. Military Installation Requirements

2.1. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor (including Sub-Contractors) on a street or parking lot, used as access to the work site or staging area shall be cleaned off the same day or as soon as practicable or requested by the CO.

2.2. The Contractor shall immediately report to the CO to discuss any issues or incidents which may indicate potential imminent risk to Government personnel or the environment. Following the notification, the Contractor shall be available to the CO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for the cleanup. To report a release or spill, contact the CO immediately.

2.3. The Contractor shall follow existing security procedures and instructions applicable to MAFB. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.

2.4. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing MAFB. Contractor personnel attempting to access MAFB shall hold a current, valid identification (ID). The U.S Government shall not be liable for delays resulting from pass coordination/approval. Contractor shall allot time into its schedule for obtaining base access.

2.5. The Contractor shall adhere to all requirements specified in Department of Defense (DoD) FAR clause 252.204-7004.

3. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.

4. Contractor Responsibility.

4.1. The Contractor is responsible for the wellbeing of their workers. The Government will not be responsible for supplying food or water to the Contractor’s workers. The mailto:kyle.munson@us.af.mil

Contractor should bring enough food and water for his/her workers to last the entire delivery period.

4.2. The Contractor shall provide the name and phone number of a supervisor that can make decisions for the Contractor and who is responsible for the performance of the work.

The supervisor shall be designated in writing when the contract is awarded and must always be available during work hours. The supervisor shall read, write, and speak fluent English. Additionally, the supervisor shall have sufficient technical knowledge regarding the requirements prescribed in this document. The identified Government representative shall have the right to request a replacement for any individual not deemed acceptable to the Government at any time.

END OF SECTION

PART II – Equipment Specifications

1. General

1.1. The Contractor shall deliver 5 pieces of equipment.

1.2. Equipment will be delivered on specified delivery dates.

2. Equipment Specifications

2.1. All listed equipment states a Brand Name or Equal Requirement (Brand Name information is for reference only). Contractors may propose an Or Equal Product meeting the specifications of each item.

QTY EQUIPMENT

TYPE

SPECIFICATIONS DURATION (Months)

(Delivery Date/Pick-up Date)

Estimated

PROJECTED

USAGE/VEHICLE (hrs)

2 20 Yard Dump Body (>26,000

GVW)

CAT Class 952-7050 or equivalent

(6 July 2026 – 30 September 2026)

(160 hrs per unit per month)

1 Padded Drum Roller

CAT CP44B or equivalent

(6 July 2026 – 30 September 2026)

(160 hrs per unit per month)

1 Single Drum Vibratory

Roller

CAT Model CS44 or equivalent

(6 July 2026 – 30 September 2026)

(160 hrs per unit per month)

1 Loader - 2-4 CY bucket

CAT 926 or equivalent

(6 July 2026 – 30 September 2026)

(160 hrs per unit per month)

2.2. All equipment shall operate off of DSS (construction grade) Diesel fuel.

2.3. Contractor will provide Diesel Exhaust Fluid replacements and refilling in required equipment.

2.4. The projected usage included above are estimates per individual piece of heavy equipment.

2.5. At the time of delivery, all equipment shall be in good, working order in accordance with all applicable manufacturers’ OSHA, and DOT requirements.

3. Field Service (Repair & Preventative Maintenance)

3.1. Contractor shall schedule all maintenance of heavy equipment between the hours of

7AM – 5PM Monday-Friday, excluding federal holidays. In the event a repair is required, the contractor shall repair within 48 hours from the time the repair call is placed. Contractor shall provide a letter containing a point of contact’s name and phone number for a maintenance contact.

3.2. Contractor shall provide the name of a qualified mechanic, licensed by the State of Montana to complete field service repairs, as required, in accordance with the timelines specified above.

3.3. If field service is determined by the POC and the Contractor to be impractical, or the rented equipment remains inoperable, Contractor shall provide a suitable substitute, acceptable to the POC, within 24 hours.

3.4. All repairs due to normal wear-and-tear in operation of heavy equipment will be the responsibility of the Contractor. Normal wear and tear is defined as tire tread wear, body panels coming loose, rock chips, leaks and other issues occurring during operation of the vehicle in accordance with the manufacturer’s published operation’s manual. If it is deemed that damage is caused by negligence or operator error, the Contractor shall provide a minimum of three (3) repair quotes to the contracting officer for reimbursement.

3.5. Contractor is responsible for all routine preventative maintenance associated with the equipment rentals and shall provide a detailed maintenance schedule for each individual piece of equipment at the time of delivery. If the preventative maintenance requires a piece of equipment to be down for more than eight (8) hours the Contractor shall provide a suitable substitute, acceptable to the contracting officer’s designated representative during the maintenance period. Contractor shall notify the Government’s POC 24 hours prior to removing any piece of equipment from the construction site for preventative maintenance.

3.6. Contractor shall remove all product waste associated with the field services provided.

3.7. Contractor shall provide a daily inspection checklist for each piece of equipment.

Attachment 1.

File details come from the government source that posted it. Updated .