This is a Questions and Answers document related to a WiFi infrastructure upgrade project at the Lewis & Clark Inn on Malmstrom Air Force Base, containing 9 contractor questions and government responses.

The Q&A clarifies that AFSVC has a separate contract for hotel communications services that will provide and install switches, media converters, and wireless access points. The construction contractor's scope excludes network equipment but includes installing two 24-port patch panels and wire managers to support 29 wireless access points, wall boxes with multi-port cover plates in the ceiling at each access point per DAFL standards, and buried fiber (no alternative installation methods permitted). The questions primarily focus on technical specifications, installation requirements, and delineation of responsibilities between the construction contractor and AFSVC's separate communications services contractor.

View the file

Other files for this federal contract opportunity

Other files attached to NAF FSS WIFI, newest first.
File Type Posted
NAF WIFI QnA v2.pdf PDF
NAF WIFI QnA.pdf PDF
Solicitation Amendment FA462625Q00040002 SF 30.pdf PDF
Solicitation Amendment FA462625Q00040001 SF 30.pdf PDF
Attch 1_NAF Clauses.pdf PDF
Malmstrom ISP-OSP Infrastructure Upgrade SOO Rev01 10-29-24.pdf PDF
Floor Plans.pdf PDF
Solicitation - FA462625Q0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Answer

In buildings 1620, 1681, 1682, and 1683. The new wall cabinets that are being installed show no hub/switch and no media converter. Will the contractor be responsible for these devices? If so, does the install require a hub or switch? As the drawing indicates currently, there is no way for the CAT6 used on the wireless access points to convert the signal to fiber. A media converter will be required for the system to function.

AFSVC has a separate contract to provide the Service; this service provider will provide/install the switches and media converters.

Is there a specific access point that is being requested for this project or just simply a commercial grade access point?

AFSVC has a separate contract to provide the Service; this service provider will provide/install the switches and media converters.

Power over Ethernet (POE) injectors will be necessary for this project in all buildings but are not listed in the requirements. Should we just add these into our proposal? Can we use a rack-mounted version for a cleaner and more professional install and cost savings for the government?

AFSVC has a separate contract to provide the Service; this service provider will provide/install the switches (PoE capable) and media converters.

The drawings indicate only 1 new 24 port patch panel but the SOW states there will be 29 new wireless access points. Should we assume there will be 2 24 port patch panels and wire managers?

Yes

Are we to install a wall box and multi-port cover plate in the ceiling at each wireless access point? That would constitute a break in the cable to the device and require additional patch cables to be built and installed. Can there be an RJ-45 connector installed at the wireless access point end that plugs directly into the WAP?

The box in the ceiling is part of the DAFL standard; this gives maximum flexibility to expand should that be necessary in the future

Could you kindly confirm if the scope of this solicitation includes the procurement and installation of active network equipment for the new cabinets in

Buildings 1620, 1681, 1682, and 1683? If switches are required, could you provide specifications (e.g., PoE capability, port counts, or fiber support)?

The scope does not include the network equipment

Confirm whether the current plans exclusively require buried fiber, or if there is flexibility to explore alternative installation methods?

Fiber is required.

Clarify that AFSVC will be installing and testing the new access points and this will not be part of the contractors responsibility?

AFSVC has a central contract for Hotel COMM services; we will use that contract vehicle to install the access points. The construction contractor will not be responsible for the access points

I see that fiber is indeed required. However, we were still wondering if this project will allow for alternative fiber installation methods other than buried. Installing fiber underground is the standard method, but were wondering if we can explore alternative methods?

They should state what the alternate method they are looking at but I don’t know of any.

Normal COMM standards required buried fiber.