Questions_-_Answers2.docx

DOCX document 14 KB Posted

Attached to
Demo of Building 1150
Solicitation number
FA462619RA004
Issued by

About this file

Questions and Answers sheet #2

View the file

Other files

File Type Posted
Solicitation_Amendment_FA462619RA0040003_SF_30.pdf PDF
Demo_1150_Bid_Schedule_without_Cost_1_May_2019.docx DOCX document
As-Builts.pdf PDF
Solicitation_Amendment_FA462619RA0040002_SF_30.pdf PDF
Demo_Bldg_1150,_Drawing_Set_29_Apr_19.pdf PDF
Amended_Specification_Sections.pdf PDF
Attachment_1.1_-_Amended_Technical_Specifications.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
Attachment_4.3_-_Amended_Drawings.pdf PDF
Solicitation_Amendment_FA462619RA0040001_SF_30.pdf PDF
Pre-Proposal_Conference_Attendance_&_Checklist.pdf PDF
Attachment_8_-_Section_L_&_M_Updated_3.21.19.rtf RTF text file
Mech_Room_Photos.pdf PDF
Questions_-_Answers.docx DOCX document
Attachment_4.2_-_Drawings_Pt_2.pdf PDF
Attachment_5_-_Wage_Determination_MT_66.docx DOCX document
Attachment_1_-_Technical_Specifications.pdf PDF
Attachment_10_-_Additional_Clauses.docx DOCX document
Attachment_3_-_Schedule_of_Drawings.pdf PDF
Solicitation_-_FA462619RA004.pdf PDF
Attachment_8_-_Section_L_&_M_Updated_3.21.19.rtf RTF text file
Attachment_9_-_Subcontractor_Consent.doc DOC document
Attachment_4.1_-_Drawings.pdf PDF
Attachment_6_-_Installation_Perimeter_Access_Control.pdf PDF
Attachment_7_-_Special_Contract_Requirements.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From paragraph 3d in Section L of the solicitation regarding Volume 3, Past Performance Documents:

“Early Proposal Information - Each offeror is requested to submit the information shown above for each relevant contract seven (7) days prior to the date set for receipt of proposals. Failure to submit early proposal information will not result in offeror disqualification.”

Q. Regarding the early submission of Past Performance Documents, what is the preferred method for submission (hard copy, emailed copy, CD copy) and the number of copies to be submitted early?

A. You can submit your early past performance in any of these fashions.

Q. Is the entire Volume to be submitted early, or just project-specific information contained in (a), (b), and (c) of this RFP section?

A. The entire volume must be sent.

Q. If offerors elect to submit the information seven (7) days prior to the date set for receipt of proposals with one Original on CD plus three paper copies, does this information need to be submitted again in hard copy with Volumes 1 and 2 on the date the solicitation closes?

A. Yes, you will still need to submit your past performance with your proposal. The early request is merely for a read ahead and is not required.

Q. Can we have the as-builts for Building 1150?

A. As-builts are included with the amendment documents.

Q. The government’s response to Q #04 included in Amendment #01 leaves enough room for different interpretations of scope of work for road construction. For example, drawing C.1 includes in demolition scope asphalt and concrete areas adjacent to Bldg 1150 (road curve and curbs around the concrete island at NW corner of the building, loading dock, 74th Street) while drawing C.6 New Pavements shows only minor new asphalt patching across 74th Street and new concrete sidewalks. Site photos show deteriorated asphalt, sidewalks and curbs at north of Bldg 1150 that are not included in the new site improvement scope. Please confirm that new asphalt and concrete work shall comply with the drawing C.6 only.

A. See revised drawings pages 1, 2, 12, and 13 for changes in the road design.

Q. Can Offerors utilize commercial delivery companies (FedEx, UPS) to deliver their proposal packages? Do such carriers have access to MAFB?

A. Yes, you can utilize commercial carriers.

Q. Specification section 02 76 00 calls for an irrigation contractor to be Certified Toro Sentinel Contractor. However, the spec. also asks to use Rain Bird products. If we provide the design and install Rain Bird products, can the requirement for Toro Sentinel certification be waived?

A. The controller for the irrigation systems shall be TORO Sentinel with integrated radio communications compatible with the existing base central irrigation system. The devices such as sprinkler heads and valves may be Rainbird or equal.

File details come from the government source that posted it.