Demo_1150_Bid_Schedule_without_Cost_1_May_2019.docx

DOCX document 22 KB Posted

Attached to
Demo of Building 1150
Solicitation number
FA462619RA004
Issued by

About this file

Updated Bid Schedule

View the file

Other files

File Type Posted
Solicitation_Amendment_FA462619RA0040003_SF_30.pdf PDF
As-Builts.pdf PDF
Solicitation_Amendment_FA462619RA0040002_SF_30.pdf PDF
Demo_Bldg_1150,_Drawing_Set_29_Apr_19.pdf PDF
Amended_Specification_Sections.pdf PDF
Questions_-_Answers2.docx DOCX document
Attachment_1.1_-_Amended_Technical_Specifications.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
Attachment_4.3_-_Amended_Drawings.pdf PDF
Solicitation_Amendment_FA462619RA0040001_SF_30.pdf PDF
Pre-Proposal_Conference_Attendance_&_Checklist.pdf PDF
Attachment_8_-_Section_L_&_M_Updated_3.21.19.rtf RTF text file
Mech_Room_Photos.pdf PDF
Questions_-_Answers.docx DOCX document
Attachment_4.2_-_Drawings_Pt_2.pdf PDF
Attachment_5_-_Wage_Determination_MT_66.docx DOCX document
Attachment_1_-_Technical_Specifications.pdf PDF
Attachment_10_-_Additional_Clauses.docx DOCX document
Attachment_3_-_Schedule_of_Drawings.pdf PDF
Solicitation_-_FA462619RA004.pdf PDF
Attachment_8_-_Section_L_&_M_Updated_3.21.19.rtf RTF text file
Attachment_9_-_Subcontractor_Consent.doc DOC document
Attachment_4.1_-_Drawings.pdf PDF
Attachment_6_-_Installation_Perimeter_Access_Control.pdf PDF
Attachment_7_-_Special_Contract_Requirements.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462619RA004

DEMO BLDG 1150
Project Number 1044085

BASE BID SCHEDULE – DEMO Building 1150 0001 Mobilization. Measurement and payment for this item shall include all costs related to general contract requirements, administration, and overhead and shall be merged and included in the contract lump sum price for “Mobilization”. The cost of all insurance, permits, security processes, licenses, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, project superintendent and workmen, quality control, storm water control, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

Estimated Total

0002 Demolition. Measurement and payment for this item shall be at the contract lump sum price for “Demolition”. Payment shall include all costs for labor, materials, and equipment associated the complete removal and disposal of buildings 1150 foundations, structures, sidewalks, landscaping, block walls, light pole bases, and pavement within the designated demolition area, efforts to avoid damaging in place vegetation, and the replacement of vegetation if damaged, cleanup, and all other incidental items necessary to complete the work.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

0003 Asbestos and Lead Based Paint Abatement. Measurement and payment for this item shall be at the contract lump sum price for “Asbestos and Lead Based Paint Abatement”. Payment shall include all costs for labor, materials, and equipment for the removal and legal disposal of all asbestos and lead based paint within and without buildings 1150 based on Montana, EPA and OSHA standards for such procedures, and all other incidental items necessary to complete the work.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

0004 Utility Removal and Relocation. Measurement and payment of this item shall be at the contract lump sum price for “Utility Removal and Relocation”. Payment shall include all costs for labor, materials, and equipment associated with, excavation and backfill, removal and disposal of old pipe or wiring, and cutting/capping/grouting utilities noted on the plans for removal. Work also includes relocating the existing fire hydrant to new location including excavation, backfill, pipe bedding, compaction, new pipe, new valves, polyethylene wrap, fittings, and disinfection, pressure testing, concrete work, cleaning, and all other incidental items necessary to complete the work.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

0005Site Improvements. Measurement and payment of this item shall be at the contract lump sum price for “Site Improvements”. Payment shall include all costs for labor, materials, and equipment for construction staking, strip, stockpile and replace topsoil; erosion control, grading, and importing suitable material if needed to bring the site to grade. This CLIN also includes providing design and installation of a new irrigation system complete with connection to water main, connection of new irrigation system to existing irrigation in the boulevard along Goddard, all electrical work, controls, piping, heads, testing, and all other items needed to provide a complete workable irrigation system. Work also includes providing and installing seed, and fertilizer and maintaining the grasses until they are established, cleanup and all other incidental items necessary to complete the work.
Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

0006 Roadway Improvements. Measurement and payment of this item shall be at the contract lump sum price for “Roadway Improvements”. Payment shall include all costs for labor, materials, and equipment for construction staking, excavation, asphalt milling 2”, geotextile, base and surface course gravel including compaction, watering, and testing; asphalt pavement, asphalt overlay 2”, concrete curb and gutter installation; new concrete sidewalks, pavement markings, new storm drain inlet with concrete aprons, piping and connection to existing storm drain main including excavation, backfill, bedding and compaction, cleanup; and all other incidental items necessary to complete the work.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

0007 Bonding. Measurement and payment for this item shall be at the contract lump sum price for “Bonding” and shall include all costs related to furnishing the bonds as required in the Contract Documents.

Unit

Unit Price

Unit Quantity

Extended Price

Lump Sum

Estimated Total CLINS (Items 0001 to 0007)

File details come from the government source that posted it.