FA462619RA004
| DEMO BLDG 1150 |
| Project Number 1044085 |
BASE BID SCHEDULE – DEMO Building 1150 0001 Mobilization. Measurement and payment for this item shall include all costs related to general contract requirements, administration, and overhead and shall be merged and included in the contract lump sum price for “Mobilization”. The cost of all insurance, permits, security processes, licenses, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and samples, general administration and overhead, movement of equipment, tools, project superintendent and workmen, quality control, storm water control, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
Estimated Total
0002 Demolition. Measurement and payment for this item shall be at the contract lump sum price for “Demolition”. Payment shall include all costs for labor, materials, and equipment associated the complete removal and disposal of buildings 1150 foundations, structures, sidewalks, landscaping, block walls, light pole bases, and pavement within the designated demolition area, efforts to avoid damaging in place vegetation, and the replacement of vegetation if damaged, cleanup, and all other incidental items necessary to complete the work.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
0003 Asbestos and Lead Based Paint Abatement. Measurement and payment for this item shall be at the contract lump sum price for “Asbestos and Lead Based Paint Abatement”. Payment shall include all costs for labor, materials, and equipment for the removal and legal disposal of all asbestos and lead based paint within and without buildings 1150 based on Montana, EPA and OSHA standards for such procedures, and all other incidental items necessary to complete the work.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
0004 Utility Removal and Relocation. Measurement and payment of this item shall be at the contract lump sum price for “Utility Removal and Relocation”. Payment shall include all costs for labor, materials, and equipment associated with, excavation and backfill, removal and disposal of old pipe or wiring, and cutting/capping/grouting utilities noted on the plans for removal. Work also includes relocating the existing fire hydrant to new location including excavation, backfill, pipe bedding, compaction, new pipe, new valves, polyethylene wrap, fittings, and disinfection, pressure testing, concrete work, cleaning, and all other incidental items necessary to complete the work.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
| 0005 | Site Improvements. Measurement and payment of this item shall be at the contract lump sum price for “Site Improvements”. Payment shall include all costs for labor, materials, and equipment for construction staking, strip, stockpile and replace topsoil; erosion control, grading, and importing suitable material if needed to bring the site to grade. This CLIN also includes providing design and installation of a new irrigation system complete with connection to water main, connection of new irrigation system to existing irrigation in the boulevard along Goddard, all electrical work, controls, piping, heads, testing, and all other items needed to provide a complete workable irrigation system. Work also includes providing and installing seed, and fertilizer and maintaining the grasses until they are established, cleanup and all other incidental items necessary to complete the work. |
| Unit |
Unit Price
Unit Quantity
Extended Price
Lump Sum
0006 Roadway Improvements. Measurement and payment of this item shall be at the contract lump sum price for “Roadway Improvements”. Payment shall include all costs for labor, materials, and equipment for construction staking, excavation, asphalt milling 2”, geotextile, base and surface course gravel including compaction, watering, and testing; asphalt pavement, asphalt overlay 2”, concrete curb and gutter installation; new concrete sidewalks, pavement markings, new storm drain inlet with concrete aprons, piping and connection to existing storm drain main including excavation, backfill, bedding and compaction, cleanup; and all other incidental items necessary to complete the work.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
0007 Bonding. Measurement and payment for this item shall be at the contract lump sum price for “Bonding” and shall include all costs related to furnishing the bonds as required in the Contract Documents.
Unit
Unit Price
Unit Quantity
Extended Price
Lump Sum
Estimated Total CLINS (Items 0001 to 0007)