10-R-0013 -- Attachment 5- Wage Determination.docx
DOCX document 19 KB Posted
- Attached to
- Fire Sprinklers Bldg 500 Federal contract opportunity
- Solicitation number
- FA4626-10-R-0013
About this file
New Wage Determination as per the amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| 10-R-0013 - Amendment 02.doc | DOC document | |
| Amendment 1.doc | DOC document | |
| 10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx | DOCX document | |
| 10-R-0013 -- Attachment 2 - Submittal Schedule.xls | XLS spreadsheet | |
| 10-R-0013 -- Attachment 4 - Drawings.zip | ZIP file | |
| 10-R-0013 -- Attachment 7 - Subcontractor Consent Form.doc | DOC document | |
| 10-R-0013 -- SF1442 - Solicitation.doc | DOC document | |
| 10-R-0013 -- Attachment 1 -- Specifications.zip | ZIP file | |
| 10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx | DOCX document | |
| 10-R-0013 -- Attachment 5- Wage Determination.docx | DOCX document | |
| 10-R-0013 -- Attachment 3 - Schedule of Drawings.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
FA4626-10-R-0013
Page
General Decision Number: MT100005 08/06/2010 MT5
Superseded General Decision Number: MT20080005
State: Montana
Construction Type: Building
County: Cascade County in Montana.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 06/11/2010 3 07/30/2010 4 08/06/2010
BRMT0003-001 10/07/2009
Rates Fringes
BRICKLAYER.......................$ 24.94 10.23
CARP0028-006 05/01/2009
Rates Fringes
Carpenters: (Including Acoustical Ceiling Installation, Drywall Hanging, Non-Mechanical Batt Insulation, Installation of Gutters, Downspouts, Facia on Metal Buildings, Metal Roofs, and Siding) Zone 1......................$ 19.74 8.90
MILLWRIGHT
Zone 1......................$ 23.74 8.90
ZONE DEFINITIONS
The hourly rate applicable shal be determined by measuring the road miles over the shortest practical maintained route from the county courthouse in Great Falls to the center of the job (employees living within a 15 mile radius of said project shall be considered Zone 1)
ZONE PAY (Add to Zone 1 basic hourly rate)
ZONE 1: 0 to 15 miles; Base Rate ZONE 2: 15 to 30 miles, add $0.75 to Zone 1 rate ZONE 3: 30 to 50 miles, add $1.00 to Zone 1 rate ZONE 4: Over 50 miles, add $1.50 to Zone 1 rate
ELEC0233-003 08/01/2009
Rates Fringes
ELECTRICIAN......................$ 27.96 4.75%+9.36
IRON0732-010 05/13/2010
Rates Fringes
Ironworkers: (Structural & Reinforcing; Excluding installation of Gutters, Downspouts, Facia, Metal Roofs, and Siding on metal Buildings).......................$ 25.57 17.21
LABO1686-002 05/01/2008
Rates Fringes
LABORER (Zone 1)
(2) Small Air Tool..........$ 17.25 6.52
(3) Concrete Saw............$ 17.30 6.52
(5) Cement Mason Tender, Hod Carrier.................$ 17.60 6.52
ZONE DEFINITIONS FOR LABORERS
The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse in Great Falls to the center of the job.
ZONE 1: 0 to 15 miles ZONE 2: 15 to 30 miles, add $0.65 to Zone 1 rate.
ZONE 3: 30 to 50 miles, add $0.85 to Zone 1 rate.
ZONE 4: Over 50 miles, add $1.25 to Zone 1 rate.
PLUM0030-004 09/01/2009
Rates Fringes
PIPEFITTER (Including HVAC work)............................$ 28.25 13.40
* SFMT0669-001 04/01/2010
Rates Fringes
SPRINKLER FITTER.................$ 29.00 16.85
SHEE0103-001 06/01/2009
Rates Fringes
Sheet Metal Worker (Including HVAC Duct Work)..................$ 26.24 11.24
SUMT1992-001 08/01/1992
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 10.71 2.70
DRYWALL FINISHER/TAPER
Hand........................$ 13.16 1.98 Machine.....................$ 14.12 1.68
FLOOR LAYER: Carpet (Soft) Floor............................$ 17.53
GLAZIER..........................$ 13.68
INSULATOR (Mechanical)...........$ 18.84 2.27
Laborers:
Asphalt Raker...............$ 11.32 2.88 Fence Erector...............$ 10.60 2.70 General.....................$ 10.76 2.70 Landscape...................$ 10.60 2.70
Painters: (Excluding Drywall Finishing) Brush.......................$ 12.52 1.48
Painters:
Roller......................$ 13.10 1.48 Sandblaster.................$ 14.72 1.69 Spray.......................$ 15.30 2.97
PLASTERER........................$ 13.75 1.50
PLUMBER..........................$ 18.55 2.77
Power Equipment Operator Asphalt Paver...............$ 14.35 2.89 Backhoe.....................$ 14.57 2.92 Bulldozer...................$ 14.37 2.99 Crane, all sizes............$ 15.85 3.01 Forklift....................$ 14.69 3.28 Front End Loader............$ 14.31 3.39 Motor Patrol................$ 14.43 3.23 Roller, Compaction..........$ 14.03 3.39 Roller, Hot Mix.............$ 14.57 2.89 Scraper.....................$ 13.04 3.44
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 13.15
TILE SETTER......................$ 16.00 2.05
Truck drivers:
Dump........................$ 14.58 3.02 Water/Fuel/Oil..............$ 14.19 2.65
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .