10-R-0013 -- Attachment 2 - Submittal Schedule.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Fire Sprinklers Bldg 500 Federal contract opportunity
- Solicitation number
- FA4626-10-R-0013
About this file
Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| 10-R-0013 - Amendment 02.doc | DOC document | |
| 10-R-0013 -- Attachment 5- Wage Determination.docx | DOCX document | |
| Amendment 1.doc | DOC document | |
| 10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx | DOCX document | |
| 10-R-0013 -- Attachment 4 - Drawings.zip | ZIP file | |
| 10-R-0013 -- Attachment 7 - Subcontractor Consent Form.doc | DOC document | |
| 10-R-0013 -- SF1442 - Solicitation.doc | DOC document | |
| 10-R-0013 -- Attachment 1 -- Specifications.zip | ZIP file | |
| 10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx | DOCX document | |
| 10-R-0013 -- Attachment 5- Wage Determination.docx | DOCX document | |
| 10-R-0013 -- Attachment 3 - Schedule of Drawings.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 05-1050 | Repair Fire Sprinkler, Building 500 | FA4626-10-R-0013 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| Schedule of Abbreviations | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PT | = | Prior To | |||||||||||||||||
| ACA | = After Contract Award | ||||||||||||||||||||
| 01 00 00 - General Requirements | |||||||||||||||||||||
| 1 | 01000.3.5.2 As-Built Field Data | 2 | 3d PTFI | ||||||||||||||||||
| 2 | 01000.3.5.2 Corrected Red-line As-Built Drawings | 2 | * | *10d after received back from CE, if needed | |||||||||||||||||
| 3 | 01000.3.5.3 As-Built Contract Drawings, Non AutoCAD Original Mylar Record Tracing | 1 | 30d AFI | ||||||||||||||||||
| 4 | 01000.3.5.3 As-Built Contract Drawings, AutoCAD Diskette | 1 | 30d AFI | ||||||||||||||||||
| 5 | 01000.3.5.2 Final Corrected As-Built Submittal, Both AutoCAD and Non AutoCAD Original Record Drawings | 1 | * | *7d after received back from CE, if needed | |||||||||||||||||
| 6 | 01000.3.5.6.3 As-Built Blueline Prints | 1 | * | *At the time of system acceptance testing | |||||||||||||||||
| 7 | 01000.3.5.6.2 List of Equipment In-Place | 1 | AWC | ||||||||||||||||||
| 8 | 01000.3.7 Four (4) Complete Sets Operating & Maintenance Instructions | 4 | * | *1 set at time of system testing, 3 sets PTFA | |||||||||||||||||
| 9 | 01000.3.8. Contractor Furnished Equipment List and Guarantees | 1 | 10d PTFA | ||||||||||||||||||
| 10 | 01000 3.17.4. Quality Control Records - Daily Reports | 1 | * | *To be made available upon request of CE by noon next day. | |||||||||||||||||
| 11 | 01000.3.17.5.Quality Control Plan | 1 | 15d ACA | ||||||||||||||||||
| 12 | 01000.3.18 Property Inventory Checklist Form 1354 | 1 | 10d PTFI | ||||||||||||||||||
| 13 | List of Employees 01001. 1.1.A. | 1 | |||||||||||||||||||
| 14 | Entry Authorization List 01001. 3.1.C.5. | 1 | |||||||||||||||||||
| 15 | 01360.2.2. Copy of Enviromental Permits | 1 | 15d ACA | ||||||||||||||||||
| 16 | 01360.4.3.1.B. Storm Water Discharge Permit and Pollution Prevention Plan | 1 | 15d ACA | ||||||||||||||||||
| 17 | 01360.7.1.2. Hazardous Material Form 3952 | 1 | 15d ACA | ||||||||||||||||||
| 18 | 01360.7.1.2. EPCRA List of Extremely Hazardous Materials | 1 | 15d ACA | ||||||||||||||||||
| 19 | 01360.11.5.6. Solid Waste Disposal and Diversion Documentation | 1 | 3d SRO | ||||||||||||||||||
| 20 | 01360.12.3 Recovered Materials Written Determination Form | 1 | 10d PTCW | ||||||||||||||||||
| 21 | Submittals 01732 1.5 Literature & Schedule of Demolition Activities | 4 | PTSW | ||||||||||||||||||
| 22 | Cast-in-Place Concrete 03300, 1.3.B. Product Data & Instructions | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 23 | Cast-in-Place Concrete 03300, 1.3.C. Product Samples | 1 | * | *15d ANTP | |||||||||||||||||
| 24 | Cast-in-Place Concrete 03300, 1.3.D. Mix Design | 4 | * | *21d PTSW | |||||||||||||||||
| 25 | Cast-in-Place Concrete 03300, 1.3.E. Test Results | 4 | * | *36 hours AWC | |||||||||||||||||
| 26 | Unit Masonry 04200, 1.4.A through E | 4 | 4 | 4 | 4 | * | *15d ANTP | ||||||||||||||
| 27 | Metal Fabrications 05500, 1.3.A. through C - Shop Drawings & Welder Certificate | 4 | 4 | 4 | * | *15d ANTP | |||||||||||||||
| 21 13 13 - Fire Sprinkler System | |||||||||||||||||||||
| 28 | Training Data - 211313-1.8.B | 4 | 14 AFI | ||||||||||||||||||
| 29 | Test Reports - 211313-3.3.C | 4 | 5 AFI | ||||||||||||||||||
| 30 | Qualifications Certificates - 211313-1.5.D | 4 | 14 PTSW | ||||||||||||||||||
| 31 | Past Project Experience - 211313-1.5.E | 4 | 14 PTSW | ||||||||||||||||||
| 32 | Operation and Maintenance Manuals - 211313-1.7 | 4 | 14 AFI | ||||||||||||||||||
| 33 | As-Built Drawings - 211313-1.6.C | 4 | 10 AWC | ||||||||||||||||||
| 34 | GUARANTEES - 211313-1.9.A | 4 | 10 PTFA | ||||||||||||||||||
| 21 30 00 - Fire Pump Systems | |||||||||||||||||||||
| 35 | Training Data - 211313-1.8.B | 4 | 14 AFI | ||||||||||||||||||
| 36 | Test Reports - 211313-3.3.C | 4 | 5 AFI | ||||||||||||||||||
| 37 | Operation and Maintenance Manuals - 211313-1.7 | 4 | 14 AFI | ||||||||||||||||||
| 38 | As-Built Drawings - 211313-1.6.C | 10 AWC | |||||||||||||||||||
| 39 | GUARANTEES - 211313-1.9.A | 4 | 10 PTFA | ||||||||||||||||||
| 28 31 00 - Fire Alarm Systems | |||||||||||||||||||||
| 40 | Product Data Sheets - 283100-1.4C | 4 | 14 PTSW | ||||||||||||||||||
| 41 | Training Data - 283100-1.9 | 4 | 14 AFI | ||||||||||||||||||
| 42 | Test Reports - 283100-3.5.G | 4 | 5 |
AFI
| 43 | Qualifications Certificates - 283100-1.4.E | 4 | 14 PTSW | |||
| 44 | Manufacturer's Certification - 283100-1.4.D | 4 | 14 PTSW | |||
| 45 | Operation and Maintenance Manuals - 283100-1.7 | 4 | 14 AFI | |||
| 46 | As-Built Drawings - 283100-1.6 | 4 | 10 AWC | |||
| 47 | GUARANTEES - 283100-1.10 | 4 | 14 AFA |
&L&"Times New Roman,Regular"&12Attachment 2 &LPage &P&R10 January