10-R-0013 -- Attachment 2 - Submittal Schedule.xls

XLS spreadsheet 41 KB Posted

Attached to
Fire Sprinklers Bldg 500 Federal contract opportunity
Solicitation number
FA4626-10-R-0013
Issued by
Department of the Air Force Global Strike Command

About this file

Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Fire Sprinklers Bldg 500, newest first.
File Type Posted
Questions and Answers.docx DOCX document
10-R-0013 - Amendment 02.doc DOC document
10-R-0013 -- Attachment 5- Wage Determination.docx DOCX document
Amendment 1.doc DOC document
10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx DOCX document
10-R-0013 -- Attachment 4 - Drawings.zip ZIP file
10-R-0013 -- Attachment 7 - Subcontractor Consent Form.doc DOC document
10-R-0013 -- SF1442 - Solicitation.doc DOC document
10-R-0013 -- Attachment 1 -- Specifications.zip ZIP file
10-R-0013 -- Attachment 6 - Past and Present Performance Questionaire.docx DOCX document
10-R-0013 -- Attachment 5- Wage Determination.docx DOCX document
10-R-0013 -- Attachment 3 - Schedule of Drawings.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 05-1050Repair Fire Sprinkler, Building 500FA4626-10-R-0013
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
Schedule of Abbreviations
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract Award
01 00 00 - General Requirements
101000.3.5.2 As-Built Field Data23d PTFI
201000.3.5.2 Corrected Red-line As-Built Drawings2**10d after received back from CE, if needed
301000.3.5.3 As-Built Contract Drawings, Non AutoCAD Original Mylar Record Tracing130d AFI
401000.3.5.3 As-Built Contract Drawings, AutoCAD Diskette130d AFI
501000.3.5.2 Final Corrected As-Built Submittal, Both AutoCAD and Non AutoCAD Original Record Drawings1**7d after received back from CE, if needed
601000.3.5.6.3 As-Built Blueline Prints1**At the time of system acceptance testing
701000.3.5.6.2 List of Equipment In-Place1AWC
801000.3.7 Four (4) Complete Sets Operating & Maintenance Instructions4**1 set at time of system testing, 3 sets PTFA
901000.3.8. Contractor Furnished Equipment List and Guarantees110d PTFA
1001000 3.17.4. Quality Control Records - Daily Reports1**To be made available upon request of CE by noon next day.
1101000.3.17.5.Quality Control Plan115d ACA
1201000.3.18 Property Inventory Checklist Form 1354110d PTFI
13List of Employees 01001. 1.1.A.1
14Entry Authorization List 01001. 3.1.C.5.1
1501360.2.2. Copy of Enviromental Permits115d ACA
1601360.4.3.1.B. Storm Water Discharge Permit and Pollution Prevention Plan115d ACA
1701360.7.1.2. Hazardous Material Form 3952115d ACA
1801360.7.1.2. EPCRA List of Extremely Hazardous Materials115d ACA
1901360.11.5.6. Solid Waste Disposal and Diversion Documentation13d SRO
2001360.12.3 Recovered Materials Written Determination Form110d PTCW
21Submittals 01732 1.5 Literature & Schedule of Demolition Activities4PTSW
22Cast-in-Place Concrete 03300, 1.3.B. Product Data & Instructions4444**15d ANTP
23Cast-in-Place Concrete 03300, 1.3.C. Product Samples1**15d ANTP
24Cast-in-Place Concrete 03300, 1.3.D. Mix Design4**21d PTSW
25Cast-in-Place Concrete 03300, 1.3.E. Test Results4**36 hours AWC
26Unit Masonry 04200, 1.4.A through E4444**15d ANTP
27Metal Fabrications 05500, 1.3.A. through C - Shop Drawings & Welder Certificate444**15d ANTP
21 13 13 - Fire Sprinkler System
28Training Data - 211313-1.8.B414 AFI
29Test Reports - 211313-3.3.C45 AFI
30Qualifications Certificates - 211313-1.5.D414 PTSW
31Past Project Experience - 211313-1.5.E414 PTSW
32Operation and Maintenance Manuals - 211313-1.7414 AFI
33As-Built Drawings - 211313-1.6.C410 AWC
34GUARANTEES - 211313-1.9.A410 PTFA
21 30 00 - Fire Pump Systems
35Training Data - 211313-1.8.B414 AFI
36Test Reports - 211313-3.3.C45 AFI
37Operation and Maintenance Manuals - 211313-1.7414 AFI
38As-Built Drawings - 211313-1.6.C10 AWC
39GUARANTEES - 211313-1.9.A410 PTFA
28 31 00 - Fire Alarm Systems
40Product Data Sheets - 283100-1.4C414 PTSW
41Training Data - 283100-1.9414 AFI
42Test Reports - 283100-3.5.G45

AFI

43Qualifications Certificates - 283100-1.4.E414 PTSW
44Manufacturer's Certification - 283100-1.4.D414 PTSW
45Operation and Maintenance Manuals - 283100-1.7414 AFI
46As-Built Drawings - 283100-1.6410 AWC
47GUARANTEES - 283100-1.10414 AFA

&L&"Times New Roman,Regular"&12Attachment 2 &LPage &P&R10 January