Attach 2 Submittal Schedule.xls

XLS spreadsheet 26 KB Posted

Attached to
RECOVERY-- NZAS062004 - Repair Missile Alert Facility Asphalt
Solicitation number
FA462609R0011
Issued by

About this file

Submittal Schedule

View the file

Other files

File Type Posted
Amendment 2.doc DOC document
QUESTION RESPONSE.docx DOCX document
2 QUESTION RESPONSE.docx DOCX document
Pre-Proposal Site Visit Meeting Minutes.doc DOC document
Solicitation.doc DOC document
Attach 5 Wage Determination.docx DOCX document
CHIP SEAL PDFS.zip ZIP file
Attach 6 Past Performance.docx DOCX document
Chip Seal Specs.zip ZIP file
Attach 3 Schedule of Drawings.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 06-2004Repair MAF AsphaltFA4626-09-R-0011
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 1 - GENERAL
101000-14 3.21.A AF 103 Digging Permit410 D PSW
201000-8 3.13.B.1 Quality Control Plan410 D ANP
301000- 11 3.16 AS-BUILTS410 D AFI
401001-1 3.1.A Entry Authorization List421WD PSW
501050-1 1.2.B. Quality Control Testing41 D ATT
601360-7 7.1.2. AF Form 3952 Chem/Haz Material Request410 D PBC
701360-11 11.6. Attachment 1. Waste Management Plan410 D PSW
801360-11 12.1, Affirmative Procurement410 D PSW
DIVISION 2 - SITE WORK REQUIREMENTS
902200-1.D.1 Fill Material Test Reports410 D ANP
1002513-1 1.1.2 Asphalt Material Testing41 D ATT
1102513-1 1.2 Asphalt Design Mix Review410 D ANP
1202513-1 1.2 Waybills13D PFI
1302600-1 1.4.1Way bills13D PFI
1403000-1 .2.3 Crack Sealer3310 D ANP
1503000-1.2.5 Asphalt Overlay Fabric13310 D ANP
1603000-1.3.3 Backer Rod133410 D ANP
1703000-1 1.10.1 Quality Control Testing410 D PSW
1803000-1 1.8.3 CP Test Stations4410 D ANP
1903100-1 1.2.5.1 Cold Mix Asphalt Patching33310 D ANP
1903300-1. C.1.b Concrete Test Mix design410 D ANP
2003300-1. C.1.b Concrete Lab Test Reports41 D ATT
2107900-1 1.1.3.A Joint Sealer33310 D ANP
D - DaysPSW - Prior to Start WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning ConstructionWD- Working Days

&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12FA4626-09-R-0011 &L&"Times New Roman,Regular"&12AF Form 66

02: 000510_AC01_00_90-

&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N