Whiteman AFB Pickleball SOW_dtd 20 August 2024.pdf
PDF 98 KB Posted
- Attached to
- FY24 Pickleball Court
- Solicitation number
- FA462524R0009
About this file
This document is a Statement of Work (SOW) for a project to resurface an existing activity court and convert it into a pickleball court at Whiteman Air Force Base in Missouri.
The key details are:
- The project scope includes general crack-filling repairs and patching, application of a colored acrylic surfacing, and conversion of the 40' x 50' activity court into a practice pickleball court. It also includes installing a 4' divider net.
- The contractor shall provide all labor, materials, transportation, equipment, and supervision to complete the project.
- The project includes optional work to pour and finish an additional 4" deep concrete slab measuring 40' x 4' on both ends of the existing court.
- The contractor must contact the facility manager before starting any repairs.
- The related federal contract opportunity has the Solicitation Number FA462524R0009 and is for the "FY24 Pickleball Court" project at Whiteman AFB, issued by the Department of the Air Force Global Strike Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Resurface Activity Court Under Alpha Warrior Rig Pavilion – Convert to Pickleball Court
Revised: 20 August 2024
1. PROJECT INFORMATION:
A. PROJECT TITLE: Resurface Activity Court Under Alpha Warrior Rig Pavilion – Convert to Pickleball Court
B. PROJECT LOCATION: Structure 20014, Whiteman AFB, MO, 65305
2. DESCRIPTION OF PROJECT:
A. PROJECT BACKGROUND: Resurface existing activity court under Alpha Warrior rig pavilion and convert it into a practice pickleball court at Whiteman AFB, MO, 65305. This project includes general crack-filling repairs and patching, application of a colored acrylic surfacing, and pickleball court conversion.
B. CONSTRUCTION SCOPE: The contractor shall execute the project as shown in this SOW.
3. GENERAL PROVISIONS:
A. The contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished, functional product.
B. Pre-Construction Site Survey: The contractor, prior to the start of any on site construction activities, shall conduct a condition survey with the construction inspector, after which the contractor shall note the condition of trees, shrubs, grassed areas, concrete, and any structural damage that may exist immediately within or adjacent to work site.
4. SPECIFIC REQUIREMENTS:
Resurface activity court under Alpha Warrior rig pavilion (40’ X 50’) and convert into one practice pickleball court. Install 4’ divider net for pickleball. The existing fence and gates surrounding the courts are adequate and will remain.
A. Mobilization to the site
B. Prepare the site – Scrape the court surface of all dirt debris and loose material.
C. Prepare the site – Pressure wash courts for major mildew and debris.
D. Divider Net – Provide non-permanent, rolling 3’ divider net with brakes for pickleball. Net shall be approved by the government before purchase.
E. Sanding – Machine-sand the surface of the court as necessary to smooth and repair any uneven areas including remaining fixtures (e.g. bolts, poles) from previously used equipment.
F. Crack Fill – Apply outdoor court grade patching materials to all low spots and/or cracks to bring each area flush with surrounding gravel.
Patching – Using outdoor, court-grade patch compounds:
A. One application will be made to each low spot/crack.
B. Cover and fill any rough areas of asphalt.
C. The edges of all patches will be scraped or ground smooth so that patches are not visible through the finished surface.
D. Light sanding on edges to smooth down
G. Leveling Course – Apply one coat of acrylic resurfacer with sand over the entire surface of the courts with a broad squeegee according to manufacturer’s recommended coverage rates.
H. Texture and Finish Courses – Apply two successive coats of outdoor-grade filler coat (sand-filled acrylic color coating) to the entire area of the courts with a broad squeegee according to manufacturer’s recommended coverage rates.
I. Finished Color – Will be owner’s choice of any two manufacturer’s standard colors (separate colors for non-volley zone and service area).
J. Lines – Paint one set of regulation 2”-wide white playing lines for pickleball.
K. Clean-up – Remove all excess materials and debris from the job after completion of the work. Repair all portions of the facility damaged during construction, including exterior grounds, to provide a complete and usable facility. If fencing must be removed during construction, it shall be returned to its original state upon project completion.
L. Option 1 – Pour and finish additional 4”-deep slab of concrete measuring approximately 40’ X 4’ on both ends of the existing activity court. Concrete shall not extend past pre-existing fence perimeter.
M. The facility manager must be contacted for coordination before the start of any repairs.
N. Any exceptions to this performance work statement must be detailed in the contractor proposal.
5. ATTACHMENTS:
A. Existing Concrete Slab Overview