INITIAL SITE VISIT

FA4625-16-R-0013

Metal Slat Fencing IDIQ

SIGN-IN SHEET

28 July 2016

NAME ORGANIZATION E-MAIL TELEPHONE #

Theodore Church-Reeves 509 CONS theodore.churchreeves@us.af.mil (660-687)-5415

Brad Phillips 509 CES bradley.phillips.6@us.af.mil x-6374 David Raley Vazquez Comm. Ctr davidr@vazquezcc.com 816-729-0630 Brian Raley IEC brianr@iec8a.com 660-687-0401

Tom Corbett IEC N/A 660-287-0568

Daniel Bond Matai Services Unknown. 816-456-8542

Ryan Bell Basteel Perimeter Systems ryan@basteel.com 765-654-5225

SSgt Lacaprucia 509 CES michael.lacaprucia@us.af.mil x-3417

Randy Eckert RCI reckert@rcicon.com 660-429-0100

Randy Ball CR Fence N/A 660-463-2597

Initial Site Visit Notes:

Brick columns will remain a Vertical Foot UOM only. Column measurements will vary based on location of work.

New fencing projects will be steel fencing only if possible.

Brick post expected to be for re-build of existing areas only.

Post in center of fence for spans over 8’ for structural integrity is acceptable.

Seed Project:

Posts in the trash area will remain.

Pipe will be removed on gates next to facility.

Brick columns will not be replaced.