Attachment 3a Building Wage Determination.pdf

PDF 121 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4625-10-R-0001
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 3a Building Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Amendment 2.pdf PDF
Amendment 1.pdf PDF
FA4625-10-R-0001 SABER Solicitation.pdf PDF
Attachment 1 Telecommnication Installation Criteria for Facility Design Renovation.pdf PDF
Attachment 4 Past Performance Questionnaire.pdf PDF
Attachment 3c Residential Wage Determination.pdf PDF
Attachment 2 Specifications.pdf PDF
Attachment 3b Heavy Highway Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: MO080002 01/01/2010 MO2

Superseded General Decision Number: MO20070002

State: Missouri

Construction Type: Building

Counties: Cass, Clay, Jackson, Johnson, Lafayette, Platte and

Ray Counties in Missouri.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 03/07/2008

3 04/04/2008

4 05/02/2008

5 06/06/2008

6 06/13/2008

7 07/04/2008

8 08/08/2008

9 09/05/2008

10 11/07/2008

11 11/28/2008

12 01/02/2009

13 01/16/2009

14 02/13/2009

15 03/20/2009

16 04/03/2009

17 04/24/2009

18 05/01/2009

19 05/08/2009

20 05/22/2009

21 05/29/2009

22 06/05/2009

23 07/03/2009

24 09/04/2009

25 09/18/2009

26 10/16/2009

27 01/01/2010

ASBE0027-002 10/01/2009

Rates Fringes

Asbestos Workers/Insulator

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 30.62 24.05

BOIL0083-005 01/01/2009

BOILERMAKERS.....................$ 32.10 19.62

BRMO0003-001 06/01/2008

Marble Mason (Terrazzo

Workers and Tile Layers).........$ 30.49 10.70

BRMO0003-002 06/01/2008

Tile Finishers...................$ 21.60 6.55

BRMO0015-002 04/01/2009

Bricklayer......................$ 31.55 13.95

CARP0007-001 04/01/2009

CASS, CLAY, JACKSON, PLATTE AND RAY COUNTIES

Carpenters :

Carpenter & Lather..........$ 33.30 13.25

Millwright & Piledriver.....$ 33.30 13.25

CARP0007-005 04/01/2009

JOHNSON AND LAFAYETTE COUNTIES:

Carpenters:

Carpenter & Lather..........$ 31.13 13.25

Millwright & Piledriver.....$ 33.30 13.25

ELEC0124-002 09/01/2009

Electricians (Including Low

Voltage Installation Work).......$ 35.23 17.38

* ELEV0012-001 01/01/2010

ELEVATOR MECHANIC................$ 39.61 20.035+a+b

a. VACATION: Employer contributes 8% of basic hourly rate to vacation pay credit for employee who has worked in business more than 5 years and 6% for 6 months to 5 years as

Vacation Pay Credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving Day and Christmas Day.

ENGI0101-014 04/01/2009

Power equipment operators:

GROUP 1.....................$ 33.11 12.70

GROUP 2.....................$ 32.30 12.70

GROUP 3(a)..................$ 26.75 12.70

GROUP 3(b)..................$ 27.55 12.70

GROUP 3(c)..................$ 30.96 12.70

GROUP 3(d)..................$ 28.35 12.70

GROUP 4.....................$ 34.96 12.70

GROUP 5.....................$ 34.46 12.70

GROUP 6.....................$ 35.71 12.70

GROUP 7.....................$ 36.71 12.70

GROUP 8.....................$ 37.71 12.70

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes 150 ft. or less of Boom; Overhead Cranes;

Hydraulic Cranes; Cherry Picker; Pile Drivers; Derrick and

Derrick Cars (Power Operated); Clamshells; Concrete Mixer

Paver; Grade-all-similar type; Hoist Operator; (Drum and

Cable type)

GROUP 2: Asphalt Paver and Spreader; Asphalt Plant Mixer

Operators; Asphalt Plant Operator; Back Hoe (all types);

Barber- Green loader (similar type); Blade-power (all types); Boats- Power; Bobcat or Skid-Loader; Boring

Machine; Brooms-Power operated (all types); Chip Spreader

(Front man); Concrete Pump (with tower, $0.50 per hour additional); Concrete Saws, Self- Propelled; Curb Finishing

Machine, Ditching Machine; Dozers; Finishing Machine;

Greaser; Hoist Operator (Personnel or Material Hoist);

Hydra Hammer (all types); Loaders (all types);Locomotives

(all types); Mechanic and Welder; Mucking Machine;

Pumps-Material (all types); Rollers (all types);

Self-propelled Rotary Drill; Shovel, Power; Side Boom;

Testhole Machine;

GROUP 3: (a) Oilers (b) Oiler driver; (c) forklifts (d)

Elevator Operator (Automatic or Push Button) A-frame trucks; mixers (with side loaders); pumps (with well points), dewatering systems, test or pressure pumps;

tractors (except when hauling material) less than 50 h.p.

GROUP 4: Master Mechanic

GROUP 5: Crane (Tower or Climbing); Other cranes 150 ft. and over (including jib).

GROUP 6: Cranes 225' and over including jib.

GROUP 7: Cranes 300' and over including jib.

GROUP 8: Cranes 350' and over including jib.

HOURLY PREMIUMS:

Clamshells, 100 ft. of boom or over (excluding jib) ($0.25)

Draglines, 100 ft. of boom or over ($0.25)

Hoists, each additional drum over 1 drum ($0.25)

Pile Drivers, 100 ft. of boom or over (excluding jib) ($0.25)

IRON0010-017 04/01/2009

Ironworker.......................$ 27.50 21.45

LABO0264-001 04/01/2009

Laborers: (LAFAYETTE AND RAY

COUNTIES)

GROUP 1.....................$ 23.80 12.15

GROUP 2.....................$ 24.20 12.15

GROUP 3.....................$ 24.60 12.15

Laborers: (CASS, CLAY, JACKSON AND PLATTE COUNTIES)

GROUP 1.....................$ 24.80 12.15

GROUP 2.....................$ 25.20 12.15

GROUP 3.....................$ 25.60 12.15

LABORERS CLASSIFICATIONS

GROUP 1 : General Laborer; Wire Mesh Handlers or Setters;

Carpenter Tender; Track Persons; Signal Person; Salamander

Tenders; Landscape Persons; Sod Layers; Wreckers (For

Alterations or Entire Projects); Plumber Laborers (Conduit

Pipe, Sewer Work, Drain Tile and Duct Lines, Digging and

Back Filling); Power Tool Operators; Pier Hole Diggers

(Over 10 feet); Jackhammer and Chipping Hammer Operators;

Chain Saw Operators; Concrete Saw Operators; Brush Feeders or Pulverizers; Reinforcing Steel Handlers; Air Tamp

Operators; Ditch Witch Operators; Swinging Scaffolds;

Georgia Buggies Self Propelled; Fork Lift; Hose Person;

Insulation Person.

GROUP 2: Fork Lift (Masonry); Brick Tender; Plasterer

Tender; Stone Mason Tender (includes all Hod Carrier classification previously shown as Mortar person and

Scaffolding)

GROUP 3: Vibrator Operator, Cutting Torch or Burner Person

Barco; Jackson or Similar Tamp Operators; Asphalt Rakers;

Power Person; Mastic Hot Kettle Person; Sandblasting and

Gunite Nozzle Person; Wagon and Churn Drill Operators;

Removal of Hazardous Waste and/or Asbestos (Except from

Mechanical Systems that are not going to be scrapped)

LABO0663-001 04/01/2009

JOHNSON COUNTY

Laborers:

GROUP 1.....................$ 18.93 8.80

GROUP 2.....................$ 20.43 8.80

LABORERS CLASSIFICATIONS

GROUP 1: General laborers:

Carpenter tenders; track men; wreckers; reinforcing rod carriers; signal men and all other general laborers;

plumber laborers, sewer work, water lines,conduit pipe, drain tile and duct lines; batter board man on pipe and ditch work and vibrator man, Air tool operators, pier hole men working below ground; jack hammer; chipping hammer operators; material batch hopper man; scale man; spreader or screed man on asphalt machine; chain or concrete saw;

brush feeders on pulverizers; swinging scaffold; cement handlers (bulk or sack).

GROUP 2: Specialist Laborer:

Plaster tenders; hod carriers; brick tenders; stone mason tenders; Laser Beam Man, Cutting torch and burner men;

asphalt rakers; Barco tamper; Jackson or any similar tamps;

power buggy operator; powder man; mastic kettleman;

sandblasting and gunnite nozzlemen; head pipe layer on sewer work; men working in tunnels; head form setters and string line men; hot tar applicator; asbestos abatement worker.

PAIN0003-001 04/01/2008

Painters:

Bazooka, Boxes and Power

Sander......................$ 29.99 12.40

Brush & Roller..............$ 28.77 12.40

Drywall.....................$ 28.99 12.40

Lead Abatement (Contained

Area).......................$ 31.27 12.40

Lead Abatement, Sprayman....$ 29.77 12.40

Paper Hanger................$ 29.27 12.40

Sandblast (Bridge, Stage, Erected Steel, Storage Bin and Tank)...................$ 30.27 12.40

Spray.......................$ 29.77 12.40

Sprayman (Storage Bin &

Tanks, Elevated Tanks);

Stageman (Spray);

Bridgeman (Spray);

Steelman (Spray)............$ 30.52 12.40

Steeplejack - Spray or

Sandblast (Other than

Elevated Tanks).............$ 34.46 12.40

Steeplejack (other than elevated tanks).............$ 33.46 12.40

Storage Bin & Tanks (roll or brush); Elevated Tanks

(roll or brush); Stageman;

Beltman; Bridgeman;

Steelman; Sandblast-Base;

Elevator Shaft..............$ 29.52 12.40

* PAIN0558-002 04/01/2009

Glaziers (All of Cass, Clay, Jackson and Platte Counties and ONLY East of Highway 13 in Johnson,Lafayette and Ray

Counties)........................$ 26.70 18.30

* PAIN0558-009 05/29/2009

Glaziers ((West of Highway 13 in Johnson, Lafayette and Ray

Counties)).......................$ 18.73 14.82

PAIN1179-003 10/01/2008

Soft Floor Layers................$ 29.95 10.10

PLAS0518-002 04/01/2008

CASS, CLAY, JACKSON, JOHNSON, LAFAYETTE, PLATTE AND RAY

COUNTIES

Cement Mason/Concrete Finisher...$ 28.08 13.40

PLAS0518-008 04/01/2008

CASS, CLAY, JACKSON, JOHNSON, LAFAYETTE, PLATTE & RAY COUNTIES

PLASTERER........................$ 28.58 11.92

PLUM0008-001 06/01/2009

Plumbers.........................$ 38.13 16.48

PLUM0533-001 06/01/2009

Pipefitters......................$ 37.73 18.24

ROOF0020-005 06/01/2009

Roofers..........................$ 31.25 12.49

SFMO0314-002 07/01/2007

Sprinkler Fitters

Johnson County..............$ 34.60 14.15

SHEE0002-005 07/01/2009

Sheet Metal Worker...............$ 38.74 15.45

SUMO1999-002 04/14/1999

Sprinkler Fitters

Cass, Lafayette and Ray

Counties....................$ 16.31 1.78

Clay County.................$ 17.45 3.12

Jackson County..............$ 17.34 3.33

Platte County...............$ 15.70 2.20

TEAM0541-007 07/01/2008

Truck drivers:

GROUP 1.....................$ 28.39 9.65

GROUP 2.....................$ 28.59 9.65

GROUP 3.....................$ 28.96 9.65

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Dump Truck Drivers; Flat Bed trucks; Pickup Trucks;

Transit Mix (Redi-Mix) (5 yds. and above); Semi-Truck

Driver, Steel Truck Driver, Distributor Truck Driver &

Operator.

GROUP 2: Double Bottom Units (20 ton capacity and over);

ForkTrucks; Heavy Excavating (Dumpsters, Euclids, etc.);

Heavy Hauling, A-Frame and Winch Trucks; Hydraulically

Operated Aerial Lift; Hydro Lift Trucks; Straddle Trucks;

Wheel Tractors (when used for towing); Articulated Dump

Truck.

GROUP 3: Mechanics.

TEAM0541-015 03/25/2000

Truck drivers:

Traffic Control Service

Driver......................$ 14.15 2.44+a

a. PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Employee's birthday and 2 personal days.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .