Attachment 3a Building Wage Determination.pdf
PDF 121 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4625-10-R-0001
About this file
Attachment 3a Building Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Amendment 1.pdf | ||
| FA4625-10-R-0001 SABER Solicitation.pdf | ||
| Attachment 1 Telecommnication Installation Criteria for Facility Design Renovation.pdf | ||
| Attachment 4 Past Performance Questionnaire.pdf | ||
| Attachment 3c Residential Wage Determination.pdf | ||
| Attachment 2 Specifications.pdf | ||
| Attachment 3b Heavy Highway Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MO080002 01/01/2010 MO2
Superseded General Decision Number: MO20070002
State: Missouri
Construction Type: Building
Counties: Cass, Clay, Jackson, Johnson, Lafayette, Platte and
Ray Counties in Missouri.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 03/07/2008
3 04/04/2008
4 05/02/2008
5 06/06/2008
6 06/13/2008
7 07/04/2008
8 08/08/2008
9 09/05/2008
10 11/07/2008
11 11/28/2008
12 01/02/2009
13 01/16/2009
14 02/13/2009
15 03/20/2009
16 04/03/2009
17 04/24/2009
18 05/01/2009
19 05/08/2009
20 05/22/2009
21 05/29/2009
22 06/05/2009
23 07/03/2009
24 09/04/2009
25 09/18/2009
26 10/16/2009
27 01/01/2010
ASBE0027-002 10/01/2009
Rates Fringes
Asbestos Workers/Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 30.62 24.05
BOIL0083-005 01/01/2009
BOILERMAKERS.....................$ 32.10 19.62
BRMO0003-001 06/01/2008
Marble Mason (Terrazzo
Workers and Tile Layers).........$ 30.49 10.70
BRMO0003-002 06/01/2008
Tile Finishers...................$ 21.60 6.55
BRMO0015-002 04/01/2009
Bricklayer......................$ 31.55 13.95
CARP0007-001 04/01/2009
CASS, CLAY, JACKSON, PLATTE AND RAY COUNTIES
Carpenters :
Carpenter & Lather..........$ 33.30 13.25
Millwright & Piledriver.....$ 33.30 13.25
CARP0007-005 04/01/2009
JOHNSON AND LAFAYETTE COUNTIES:
Carpenters:
Carpenter & Lather..........$ 31.13 13.25
Millwright & Piledriver.....$ 33.30 13.25
ELEC0124-002 09/01/2009
Electricians (Including Low
Voltage Installation Work).......$ 35.23 17.38
* ELEV0012-001 01/01/2010
ELEVATOR MECHANIC................$ 39.61 20.035+a+b
a. VACATION: Employer contributes 8% of basic hourly rate to vacation pay credit for employee who has worked in business more than 5 years and 6% for 6 months to 5 years as
Vacation Pay Credit.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving Day and Christmas Day.
ENGI0101-014 04/01/2009
Power equipment operators:
GROUP 1.....................$ 33.11 12.70
GROUP 2.....................$ 32.30 12.70
GROUP 3(a)..................$ 26.75 12.70
GROUP 3(b)..................$ 27.55 12.70
GROUP 3(c)..................$ 30.96 12.70
GROUP 3(d)..................$ 28.35 12.70
GROUP 4.....................$ 34.96 12.70
GROUP 5.....................$ 34.46 12.70
GROUP 6.....................$ 35.71 12.70
GROUP 7.....................$ 36.71 12.70
GROUP 8.....................$ 37.71 12.70
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Cranes 150 ft. or less of Boom; Overhead Cranes;
Hydraulic Cranes; Cherry Picker; Pile Drivers; Derrick and
Derrick Cars (Power Operated); Clamshells; Concrete Mixer
Paver; Grade-all-similar type; Hoist Operator; (Drum and
Cable type)
GROUP 2: Asphalt Paver and Spreader; Asphalt Plant Mixer
Operators; Asphalt Plant Operator; Back Hoe (all types);
Barber- Green loader (similar type); Blade-power (all types); Boats- Power; Bobcat or Skid-Loader; Boring
Machine; Brooms-Power operated (all types); Chip Spreader
(Front man); Concrete Pump (with tower, $0.50 per hour additional); Concrete Saws, Self- Propelled; Curb Finishing
Machine, Ditching Machine; Dozers; Finishing Machine;
Greaser; Hoist Operator (Personnel or Material Hoist);
Hydra Hammer (all types); Loaders (all types);Locomotives
(all types); Mechanic and Welder; Mucking Machine;
Pumps-Material (all types); Rollers (all types);
Self-propelled Rotary Drill; Shovel, Power; Side Boom;
Testhole Machine;
GROUP 3: (a) Oilers (b) Oiler driver; (c) forklifts (d)
Elevator Operator (Automatic or Push Button) A-frame trucks; mixers (with side loaders); pumps (with well points), dewatering systems, test or pressure pumps;
tractors (except when hauling material) less than 50 h.p.
GROUP 4: Master Mechanic
GROUP 5: Crane (Tower or Climbing); Other cranes 150 ft. and over (including jib).
GROUP 6: Cranes 225' and over including jib.
GROUP 7: Cranes 300' and over including jib.
GROUP 8: Cranes 350' and over including jib.
HOURLY PREMIUMS:
Clamshells, 100 ft. of boom or over (excluding jib) ($0.25)
Draglines, 100 ft. of boom or over ($0.25)
Hoists, each additional drum over 1 drum ($0.25)
Pile Drivers, 100 ft. of boom or over (excluding jib) ($0.25)
IRON0010-017 04/01/2009
Ironworker.......................$ 27.50 21.45
LABO0264-001 04/01/2009
Laborers: (LAFAYETTE AND RAY
COUNTIES)
GROUP 1.....................$ 23.80 12.15
GROUP 2.....................$ 24.20 12.15
GROUP 3.....................$ 24.60 12.15
Laborers: (CASS, CLAY, JACKSON AND PLATTE COUNTIES)
GROUP 1.....................$ 24.80 12.15
GROUP 2.....................$ 25.20 12.15
GROUP 3.....................$ 25.60 12.15
LABORERS CLASSIFICATIONS
GROUP 1 : General Laborer; Wire Mesh Handlers or Setters;
Carpenter Tender; Track Persons; Signal Person; Salamander
Tenders; Landscape Persons; Sod Layers; Wreckers (For
Alterations or Entire Projects); Plumber Laborers (Conduit
Pipe, Sewer Work, Drain Tile and Duct Lines, Digging and
Back Filling); Power Tool Operators; Pier Hole Diggers
(Over 10 feet); Jackhammer and Chipping Hammer Operators;
Chain Saw Operators; Concrete Saw Operators; Brush Feeders or Pulverizers; Reinforcing Steel Handlers; Air Tamp
Operators; Ditch Witch Operators; Swinging Scaffolds;
Georgia Buggies Self Propelled; Fork Lift; Hose Person;
Insulation Person.
GROUP 2: Fork Lift (Masonry); Brick Tender; Plasterer
Tender; Stone Mason Tender (includes all Hod Carrier classification previously shown as Mortar person and
Scaffolding)
GROUP 3: Vibrator Operator, Cutting Torch or Burner Person
Barco; Jackson or Similar Tamp Operators; Asphalt Rakers;
Power Person; Mastic Hot Kettle Person; Sandblasting and
Gunite Nozzle Person; Wagon and Churn Drill Operators;
Removal of Hazardous Waste and/or Asbestos (Except from
Mechanical Systems that are not going to be scrapped)
LABO0663-001 04/01/2009
JOHNSON COUNTY
Laborers:
GROUP 1.....................$ 18.93 8.80
GROUP 2.....................$ 20.43 8.80
LABORERS CLASSIFICATIONS
GROUP 1: General laborers:
Carpenter tenders; track men; wreckers; reinforcing rod carriers; signal men and all other general laborers;
plumber laborers, sewer work, water lines,conduit pipe, drain tile and duct lines; batter board man on pipe and ditch work and vibrator man, Air tool operators, pier hole men working below ground; jack hammer; chipping hammer operators; material batch hopper man; scale man; spreader or screed man on asphalt machine; chain or concrete saw;
brush feeders on pulverizers; swinging scaffold; cement handlers (bulk or sack).
GROUP 2: Specialist Laborer:
Plaster tenders; hod carriers; brick tenders; stone mason tenders; Laser Beam Man, Cutting torch and burner men;
asphalt rakers; Barco tamper; Jackson or any similar tamps;
power buggy operator; powder man; mastic kettleman;
sandblasting and gunnite nozzlemen; head pipe layer on sewer work; men working in tunnels; head form setters and string line men; hot tar applicator; asbestos abatement worker.
PAIN0003-001 04/01/2008
Painters:
Bazooka, Boxes and Power
Sander......................$ 29.99 12.40
Brush & Roller..............$ 28.77 12.40
Drywall.....................$ 28.99 12.40
Lead Abatement (Contained
Area).......................$ 31.27 12.40
Lead Abatement, Sprayman....$ 29.77 12.40
Paper Hanger................$ 29.27 12.40
Sandblast (Bridge, Stage, Erected Steel, Storage Bin and Tank)...................$ 30.27 12.40
Spray.......................$ 29.77 12.40
Sprayman (Storage Bin &
Tanks, Elevated Tanks);
Stageman (Spray);
Bridgeman (Spray);
Steelman (Spray)............$ 30.52 12.40
Steeplejack - Spray or
Sandblast (Other than
Elevated Tanks).............$ 34.46 12.40
Steeplejack (other than elevated tanks).............$ 33.46 12.40
Storage Bin & Tanks (roll or brush); Elevated Tanks
(roll or brush); Stageman;
Beltman; Bridgeman;
Steelman; Sandblast-Base;
Elevator Shaft..............$ 29.52 12.40
* PAIN0558-002 04/01/2009
Glaziers (All of Cass, Clay, Jackson and Platte Counties and ONLY East of Highway 13 in Johnson,Lafayette and Ray
Counties)........................$ 26.70 18.30
* PAIN0558-009 05/29/2009
Glaziers ((West of Highway 13 in Johnson, Lafayette and Ray
Counties)).......................$ 18.73 14.82
PAIN1179-003 10/01/2008
Soft Floor Layers................$ 29.95 10.10
PLAS0518-002 04/01/2008
CASS, CLAY, JACKSON, JOHNSON, LAFAYETTE, PLATTE AND RAY
COUNTIES
Cement Mason/Concrete Finisher...$ 28.08 13.40
PLAS0518-008 04/01/2008
CASS, CLAY, JACKSON, JOHNSON, LAFAYETTE, PLATTE & RAY COUNTIES
PLASTERER........................$ 28.58 11.92
PLUM0008-001 06/01/2009
Plumbers.........................$ 38.13 16.48
PLUM0533-001 06/01/2009
Pipefitters......................$ 37.73 18.24
ROOF0020-005 06/01/2009
Roofers..........................$ 31.25 12.49
SFMO0314-002 07/01/2007
Sprinkler Fitters
Johnson County..............$ 34.60 14.15
SHEE0002-005 07/01/2009
Sheet Metal Worker...............$ 38.74 15.45
SUMO1999-002 04/14/1999
Sprinkler Fitters
Cass, Lafayette and Ray
Counties....................$ 16.31 1.78
Clay County.................$ 17.45 3.12
Jackson County..............$ 17.34 3.33
Platte County...............$ 15.70 2.20
TEAM0541-007 07/01/2008
Truck drivers:
GROUP 1.....................$ 28.39 9.65
GROUP 2.....................$ 28.59 9.65
GROUP 3.....................$ 28.96 9.65
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump Truck Drivers; Flat Bed trucks; Pickup Trucks;
Transit Mix (Redi-Mix) (5 yds. and above); Semi-Truck
Driver, Steel Truck Driver, Distributor Truck Driver &
Operator.
GROUP 2: Double Bottom Units (20 ton capacity and over);
ForkTrucks; Heavy Excavating (Dumpsters, Euclids, etc.);
Heavy Hauling, A-Frame and Winch Trucks; Hydraulically
Operated Aerial Lift; Hydro Lift Trucks; Straddle Trucks;
Wheel Tractors (when used for towing); Articulated Dump
Truck.
GROUP 3: Mechanics.
TEAM0541-015 03/25/2000
Truck drivers:
Traffic Control Service
Driver......................$ 14.15 2.44+a
a. PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Employee's birthday and 2 personal days.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .