Bid Schedule

View the file

Other files

File Type Posted
1442 - 20 May.docx DOCX document
Wage Determination —
FY09 PROTECTIVE COATINGS SOW —
Seed Project SOW.docx DOCX document
Signed Past Performance Questionnaire cover page.pdf PDF
Past Performance Questionaire.docx DOCX document
Wage Determination —
Wage Determination —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Yr

FA4625-09-R-0001Attachment 1
CLINDESCRIPTIONUNITEST. QTYUNIT PRICEAMOUNT ($)
Nonpersonal Services: Provide all supervision, personnel, equipment, vehicles, materials/supplies (including paint/coatings) and other items or services necessary to perform protective coating services at Whiteman AFB, MO from 1 Oct 2009 - 30 Sept 2010 in accordance with the SOWEstimated
0001Base Exteriors, under 10'SF75,000
0002Base Exteriors, over 10'SF150,000
0003Partial Exteriors and TrimSF10,000
0004Base Interiors, under 10'SF144,125
0005Base Interiors, over 10'SF130,000
0006Partial Interiors and trimSF7,323
0007Finish and repair of drywall surfacesSF8,550
0008Repair and install wall coveringsSF5,000
0009Install type II wall coveringSF5,000
0010Install type III wall coveringSF5,000
0011Remove wall coveringSF5,000
0012Remove wall covering, Skim coat for paintSF10,000
0013Base paint striping/marking, arrows,barsSF100,000
0014Painting and stencilingSF5,000
0015Grinding, shot blasting, asphalt and concreteSF15,000
0016Power wash exteriors, 0 - 4000 PSISF75,000
0017Metal roof preperation and painting (paint)SF280,000
0018Metal roof preperation/coat (elastomeric)SF100,000
0019Paint Annual air field markingsSF96,000
0020Paint fire hydrantsEA100
0021Paint power distibution boxesEA150
0022Flight line warning signsEA125
0023Paint pipe and structural steelSF30,000
0024Repair Exterior Drivit/Stucco surfacesSF2,000
0025Chemical paint removalSF5,000
0026Paint lines interior flooors enamel or urethaneSF5,000
0027Appy exterior stain/sealer wood surfacesSF8,000
0028Apply elastomeric coatings on surfacesSF25,000
0029Install thermoplastic pavement markingsSF5,000
0030Apply emulsified sealer after CLIN 2015SF8,000
0031Paint steel door and frame, all sidesEA200
0032High pressure power wash 4000 - 7000 PSISF5,000
0033Additional surface preperation (extreme case)SF3,000
Total For Base Year$

Opt 1 FA4625-09-R-0001 Attachment 1

CLINDESCRIPTIONUNITEST. QTYUNIT PRICEAMOUNT ($)
Nonpersonal Services: Provide all supervision, personnel, equipment, vehicles, materials/supplies (including paint/coatings) and other items or services necessary to perform protective coating services at Whiteman AFB, MO from 1 Oct 2010 - 30 Sept 2011 in accordance with the SOWEstimated
1001Base Exteriors, under 10'SF75,000
1002Base Exteriors, over 10'SF150,000
1003Partial Exteriors and TrimSF10,000
1004Base Interiors, under 10'SF144,125
1005Base Interiors, over 10'SF130,000
1006Partial Interiors and trimSF7,323
1007Finish and repair of drywall surfacesSF8,550
1008Repair and install wall coveringsSF5,000
1009Install type II wall coveringSF5,000
1010Install type III wall coveringSF5,000
1011Remove wall coveringSF5,000
1012Remove wall covering, Skim coat for paintSF10,000
1013Base paint striping/marking, arrows,barsSF100,000
1014Painting and stencilingSF5,000
1015Grinding, shot blasting, asphalt and concreteSF15,000
1016Power wash exteriors, 0 - 4000 PSISF75,000
1017Metal roof preperation and painting (paint)SF280,000
1018Metal roof preperation/coat (elastomeric)SF100,000
1019Paint Annual air field markingsSF96,000
1020Paint fire hydrantsEA100
1021Paint power distibution boxesEA150
1022Flight line warning signsEA125
1023Paint pipe and structural steelSF30,000
1024Repair Exterior Drivit/Stucco surfacesSF2,000
1025Chemical paint removalSF5,000
1026Paint lines interior flooors enamel or urethaneSF5,000
1027Appy exterior stain/sealer wood surfacesSF8,000
1028Apply elastomeric coatings on surfacesSF25,000
1029Install thermoplastic pavement markingsSF5,000
1030Apply emulsified sealer after CLIN 2015SF8,000
1031Paint steel door and frame, all sidesEA200
1032High pressure power wash 4000 - 7000 PSISF5,000
1033Additional surface preperation (extreme case)SF3,000
Total For Option Year 1$

Opt 2

FA4625-09-R-0001Attachment 1
CLINDESCRIPTIONUNITEST. QTYUNIT PRICEAMOUNT ($)
Nonpersonal Services: Provide all supervision, personnel, equipment, vehicles, materials/supplies (including paint/coatings) and other items or services necessary to perform protective coating services at Whiteman AFB, MO from 1 Oct 2011 - 30 Sept 2012 in accordance with the SOWEstimated
2001Base Exteriors, under 10'SF75,000
2002Base Exteriors, over 10'SF150,000
2003Partial Exteriors and TrimSF10,000
2004Base Interiors, under 10'SF144,125
2005Base Interiors, over 10'SF130,000
2006Partial Interiors and trimSF7,323
2007Finish and repair of drywall surfacesSF8,550
2008Repair and install wall coveringsSF5,000
2009Install type II wall coveringSF5,000
2010Install type III wall coveringSF5,000
2011Remove wall coveringSF5,000
2012Remove wall covering, Skim coat for paintSF10,000
2013Base paint striping/marking, arrows,barsSF100,000
2014Painting and stencilingSF5,000
2015Grinding, shot blasting, asphalt and concreteSF15,000
2016Power wash exteriors, 0 - 4000 PSISF75,000
2017Metal roof preperation and painting (paint)SF280,000
2018Metal roof preperation/coat (elastomeric)SF100,000
2019Paint Annual air field markingsSF96,000
2020Paint fire hydrantsEA100
2021Paint power distibution boxesEA150
2022Flight line warning signsEA125
2023Paint pipe and structural steelSF30,000
2024Repair Exterior Drivit/Stucco surfacesSF2,000
2025Chemical paint removalSF5,000
2026Paint lines interior flooors enamel or urethaneSF5,000
2027Appy exterior stain/sealer wood surfacesSF8,000
2028Apply elastomeric coatings on surfacesSF25,000
2029Install thermoplastic pavement markingsSF5,000
2030Apply emulsified sealer after CLIN 2015SF8,000
2031Paint steel door and frame, all sidesEA200
2032High pressure power wash 4000 - 7000 PSISF5,000
2033Additional surface preperation (extreme case)SF3,000
Total For Option Year 2$

Opt 3

FA4625-09-R-0001Attachment 1
CLINDESCRIPTIONUNITEST. QTYUNIT PRICEAMOUNT ($)
Nonpersonal Services: Provide all supervision, personnel, equipment, vehicles, materials/supplies (including paint/coatings) and other items or services necessary to perform protective coating services at Whiteman AFB, MO from 1 Oct 2012 - 30 Sept 2013 in accordance with the SOWEstimated
3001Base Exteriors, under 10'SF75,000
3002Base Exteriors, over 10'SF150,000
3003Partial Exteriors and TrimSF10,000
3004Base Interiors, under 10'SF144,125
3005Base Interiors, over 10'SF130,000
3006Partial Interiors and trimSF7,323
3007Finish and repair of drywall surfacesSF8,550
3008Repair and install wall coveringsSF5,000
3009Install type II wall coveringSF5,000
3010Install type III wall coveringSF5,000
3011Remove wall coveringSF5,000
3012Remove wall covering, Skim coat for paintSF10,000
3013Base paint striping/marking, arrows,barsSF100,000
3014Painting and stencilingSF5,000
3015Grinding, shot blasting, asphalt and concreteSF15,000
3016Power wash exteriors, 0 - 4000 PSISF75,000
3017Metal roof preperation and painting (paint)SF280,000
3018Metal roof preperation/coat (elastomeric)SF100,000
3019Paint Annual air field markingsSF96,000
3020Paint fire hydrantsEA100
3021Paint power distibution boxesEA150
3022Flight line warning signsEA125
3023Paint pipe and structural steelSF30,000
3024Repair Exterior Drivit/Stucco surfacesSF2,000
3025Chemical paint removalSF5,000
3026Paint lines interior flooors enamel or urethaneSF5,000
3027Appy exterior stain/sealer wood surfacesSF8,000
3028Apply elastomeric coatings on surfacesSF25,000
3029Install thermoplastic pavement markingsSF5,000
3030Apply emulsified sealer after CLIN 2015SF8,000
3031Paint steel door and frame, all sidesEA200
3032High pressure power wash 4000 - 7000 PSISF5,000
3033Additional surface preperation (extreme case)SF3,000
Total For Option Year 3$

Opt 4 FA4625-09-R-0001 Attachment 1

CLINDESCRIPTIONUNITEST. QTYUNIT PRICEAMOUNT ($)
Nonpersonal Services: Provide all supervision, personnel, equipment, vehicles, materials/supplies (including paint/coatings) and other items or services necessary to perform protective coating services at Whiteman AFB, MO from 1 Oct 2013 - 30 Sept 2014 in accordance with the SOWEstimated
4001Base Exteriors, under 10'SF75,000
4002Base Exteriors, over 10'SF150,000
4003Partial Exteriors and TrimSF10,000
4004Base Interiors, under 10'SF144,125
4005Base Interiors, over 10'SF130,000
4006Partial Interiors and trimSF7,323
4007Finish and repair of drywall surfacesSF8,550
4008Repair and install wall coveringsSF5,000
4009Install type II wall coveringSF5,000
4010Install type III wall coveringSF5,000
4011Remove wall coveringSF5,000
4012Remove wall covering, Skim coat for paintSF10,000
4013Base paint striping/marking, arrows,barsSF100,000
4014Painting and stencilingSF5,000
4015Grinding, shot blasting, asphalt and concreteSF15,000
4016Power wash exteriors, 0 - 4000 PSISF75,000
4017Metal roof preperation and painting (paint)SF280,000
4018Metal roof preperation/coat (elastomeric)SF100,000
4019Paint Annual air field markingsSF96,000
4020Paint fire hydrantsEA100
4021Paint power distibution boxesEA150
4022Flight line warning signsEA125
4023Paint pipe and structural steelSF30,000
4024Repair Exterior Drivit/Stucco surfacesSF2,000
4025Chemical paint removalSF5,000
4026Paint lines interior flooors enamel or urethaneSF5,000
4027Appy exterior stain/sealer wood surfacesSF8,000
4028Apply elastomeric coatings on surfacesSF25,000
4029Install thermoplastic pavement markingsSF5,000
4030Apply emulsified sealer after CLIN 2015SF8,000
4031Paint steel door and frame, all sidesEA200
4032High pressure power wash 4000 - 7000 PSISF5,000
4033Additional surface preperation (extreme case)SF3,000
Total For Option Year 4$

Totals

FA4625-09-R-0001Attachment 1
Total for Base Year$
Total for Option Year 1$
Total for Option Year 2$
Total for Option Year 3$
Total for Option Year 4$

Total Contract Amount $