Atch_2_-_OWS_Price_List_(Locked).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Oil/Water Separator Maintenance Services Federal contract opportunity
- Solicitation number
- FA4621-19-Q-A008
About this file
OWS Price List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_2_-_OWS_Price_List_(Locked).xlsx | XLSX spreadsheet | |
| Solicitation_Amendment_FA462119QA0080001_SF_30.pdf | ||
| Atch_1_-_OWS_PWS.doc | DOC document | |
| OWS_Solicitation_Questions.docx | DOCX document | |
| Atch_3_-_Wage_Determination.pdf | ||
| Atch_4_-_Past_Performance_Questionnaire.pdf | ||
| FA4621-19-Q-A008.pdf | ||
| OWS_Synopsis_Signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price List
| Oil/Water Separator Services | |||||
| Base Year - 1 Apr 2019 to 31 Mar 2020 | (FY19) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 0001 AA | Maintenance of Oil/Water Separators: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary for the inspection, cleaning, pumping, and maintenance of oil/water separators listed in Appendix A and in accordance with the PWS para. 1.1.1. through 1.1.2., 1.1.4., 1.1.6., and 1.1.7. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
SIGNAL CODE: A
| 12 | Month(s) | $ - 0 | ||
| 0001 AB | Testing/Analysis: FFP Non-Personal Services. The Contractor shall provide all materials, equipment, tools, supervision, and labor necessary to perform sampling , and testing/analysis of oil/water separators in accordance with the PWS, Appendix A, and B, and para. 1.1.1., 1.1.3. through 1.1.3.3. (Each item includes sampling of 24 oil/water separators, and a total of (18) individual and composite testing/analysis samples as required by the quarterly, and annual test requirements in the PWS). (Item description same for all subsequent option year CLINs) |
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 4 | Each (Quarterly) | $ - 0 | ||
| 0001 AC | MFH and Base Sewer Line Flush: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary to flush 186,000 (estimate) linear feet of base sewer lines as listed in Appendix A and in accordance with PWS para. 1.4 - 1.4.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1 | Each | $ - 0 | ||
| 0001 AD | Septic/Holding Tank Pump/Interior Trench Drain Outlets: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to properly empty all septic tank, holding tank and interior trench drain outlet contents. (As needed basis) listed in Appendix A and in accordance with PWS para. 1.3. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 54 | Each | $ - 0 | ||
| 0001 AE | Clean Grease Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to service each grease trap listed in Appendix A, and in accordance with PWS para. 1.2., and 1.2.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
SIGNAL CODE: A
| 12 | Each | $ - 0 | ||
| 0001 AF | Maintain Sand Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the maintenance of 4 sand traps located at separators 2, 3, and 5 as listed in Appendix A, and in accordance with PWS para. 1.1.5. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ - 0 | ||
| 0001 AG | Maintain Interior Trench Drains: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to maintain the interior trench drain outlets and their service lines, as listed in Appendix A, and in accordance with PWS para. 1.5. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | ||
| 0001 AH | Disposal of Non-Hazardous Waste: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of Non-Hazardous Waste (liquid and solid) in accordance with PWS para. 1.1.1.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ - 0 | ||
| 0001 AI | Disposal of Hazardous Waste: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of hazardous waste (liquid and solid) in accordance with PWS para. 1.1.1.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1,600 | Gallon(s) | $ - 0 | ||
| 0001 AJ | Parts: FFP - Requirements |
Non-Personal Services. Reimburse contractor for parts used to repair the oil/water serparator systems in accordance with PWS para. 1.1.1. and 1.1.2. in an amount not to exceed $6,457.00. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 1 | Lot | $ - 0 | ||
| 0001 AK | Labor Hours for Parts Installation: FFP - Requirements |
Non-Personal Services. Labor hours for parts installation for oil/water separator maintenance and repairs in accordance with PWS para. 1.1.1. and 1.1.2. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination
| SIGNAL CODE: A | 20 | Hour(s) | $ - 0 | ||
| 0001 AL | Emergency Service Calls: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the inspection, maintenance, testing, analysis and cleaning of oil/water separators listed in Appendix A and in accordance with PWS para. 1.7. (Item description same for all subsequent option year CLINs)
Base Year (1 Apr 2019 to 31 Mar 2020) FOB: Destination SIGNAL CODE: A 10 Hour(s) $ - 0
TOTAL FY 19: $ - 0
| Option Year (1) - 1 Apr 2020 to 31 Mar 2021 | (FY20) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 1001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ - 0 | |
| 1001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 4 | Each (Quarterly) | $ - 0 | |
| 1001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1 | Each | $ - 0 | |
| 1001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 54 | Each | $ - 0 | |
| 1001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 16 | Each | $ - 0 | |
| 1001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ - 0 | |
| 1002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ - 0 | |
| 1001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 12 | Month(s) | $ - 0 | |
| 1001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1,600 | Gallon(s) | $ - 0 | |
| 1001 AJ | Parts: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 1 | Lot | $ - 0 | |
| 1001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 20 | Hour(s) | $ - 0 | |
| 1001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2020 to 31 Mar 2021) | 10 | Hour(s) | $ - 0 |
TOTAL FY 20: $ - 0
| Option Year (2) - 1 Apr 2021 to 31 Mar 2022 | (FY21) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 2001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ - 0 | |
| 2001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 4 | Each (Quarterly) | $ - 0 | |
| 2001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1 | Each | $ - 0 | |
| 2001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 54 | Each | $ - 0 | |
| 2001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 16 | Each | $ - 0 | |
| 2001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ - 0 | |
| 2002 AG | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ - 0 | |
| 2001 AH | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 12 | Month(s) | $ - 0 | |
| 2001 AI | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1,600 | Gallon(s) | $ - 0 | |
| 2001 AJ | Parts: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 1 | Lot | $ - 0 | |
| 2001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 20 | Hour(s) | $ - 0 | |
| 2001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2021 to 31 Mar 2022) | 10 | Hour(s) | $ - 0 |
TOTAL FY 21: $ - 0
| Option Year (3) - 1 Apr 2022 to 31 Mar 2023 | (FY22) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 3001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ - 0 | |
| 3001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 4 | Each (Quarterly) | $ - 0 | |
| 3001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1 | Each | $ - 0 | |
| 3001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 54 | Each | $ - 0 | |
| 3001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 16 | Each | $ - 0 | |
| 3001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ - 0 | |
| 3002 AF | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ - 0 | |
| 3001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 12 | Month(s) | $ - 0 | |
| 3001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1,600 | Gallon(s) | $ - 0 | |
| 3001 AJ | Parts: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 1 | Lot | $ - 0 | |
| 3001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 20 | Hour(s) | $ - 0 | |
| 3001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2022 to 31 Mar 2023) | 10 | Hour(s) | $ - 0 |
TOTAL FY 21: $ - 0
| Option Year (4) - 1 Apr 2023 to 31 Mar 2024 | (FY22) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 4001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | $ - 0 | |
| 4001 AB | Testing/Analysis: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 4 | Each (Quarterly) | $ - 0 | |
| 4001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1 | Each | $ - 0 | |
| 4001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 54 | Each | $ - 0 | |
| 4001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 16 | Each | $ - 0 | |
| 4001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | $ - 0 | |
| 4002 AF | Maintain Interior Trench Drains: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | $ - 0 | |
| 4001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 12 | Month(s) | $ - 0 | |
| 4001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1,600 | Gallon(s) | $ - 0 | |
| 4001 AJ | Parts: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 1 | Lot | $ - 0 | |
| 4001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 20 | Hour(s) | $ - 0 | |
| 4001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Apr 2023 to 31 Mar 2024) | 10 | Hour(s) | $ - 0 |
TOTAL FY 22: $ - 0
| PRICE LIST SUMMARY | |||
| Base Year 1 Apr 2019 to 31 Mar 2020 | |||
| 0001 | Oil/Water Separator Services | FY19 TOTAL: | $ - 0 |
| Option Year (1) 1 Apr 2020 to 31 Mar 2021 | |||
| 1001 | Oil/Water Separator Services | FY20 TOTAL: | $ - 0 |
| Option Year (2) 1 Apr 2021 to 31 Mar 2022 | |||
| 2001 | Oil/Water Separator Services | FY21 TOTAL: | $ - 0 |
| Option Year (3) 1 Apr 2022 to 31 Mar 2023 | |||
| 3001 | Oil/Water Separator Services | FY22 TOTAL: | $ - 0 |
| Option Year (4) 1 Apr 2023 to 31 Mar 2024 | |||
| 4001 | Oil/Water Separator Services | FY23 TOTAL: | $ - 0 |
CONTRACT GRAND TOTAL: (BASE PLUS OPTION YEARS) $ - 0
&"Times New Roman,Regular"&12FA4621-19-Q-A008, Oil/Water Separator Services
| &"-,Bold"&12&UPRICE LIST | |
| 20 February 2019 | &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
File details come from the government source that posted it.