This is Amendment 0001 to solicitation FA462026QA225, issued by the 92nd Contracting Squadron at Fairchild Air Force Base, Washington, effective April 9, 2026. The amendment serves as a Questions and Answers addendum to the original solicitation dated April 7, 2026, addressing five inquiries from prospective bidders regarding portable fire extinguisher maintenance and repair services at the air base.

Key clarifications provided include: (1) bidders exceeding the SBA threshold will not be considered; (2) the $25 per repair line item covers only minor repairs above contractual obligations, excluding high-pressure CO₂ hydrostatic testing, recharging, and K-Class extinguisher services; (3) on-site work using an enclosed, custom-fabricated trailer for hydrostatic testing, six-year maintenance processes, and refilling is permitted and preferred; (4) trailer storage on base in a secure hangar location may be available depending on trailer size; and (5) mandatory monthly visits are required, and contractors cannot consolidate all maintenance into a single two to three-week trip, as extinguishers must remain available for aircraft operations at the station. Offerors must acknowledge receipt of this amendment and complete blocks 15a, 15b, and 15c on the Standard Form 30, providing one copy with their proposal. The contracting officer is Benjamin Hampton.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXCEPTION OF SF 30, APPROVED BY NARS 5/79

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

FA462026QA225

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09-April-2026

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

FA4620 7. ADMINISTERED BY (If other than Item 6)

CODE

92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: zachery.ray.2@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√) 9A. AMENDMENT OF SOLICITATION NO.

X

FA462026QA225

All Offerors 9B. DATED (SEE ITEM 11)

07-April-2026

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [X] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE SUMMARY OF CHANGES

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Bejamin Hampton, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FA462026QA225

Amendment 0001 Page 2

SUMMARY OF CHANGES

The purpose of this Amendment is to: answer questions received in response to the solicitation.

1. Q: If a bidder exceeds the SBA threshold, would their bid be considered non-responsive, or is the threshold used for evaluation purposes only?

A: They would not be considered.

2. Q: I would like clarification on the “$25 per repair” line item for all portable fire extinguishers.

Specifically, does this amount include services such as high-pressure CO₂ hydrostatic testing and recharge, or the recharge of K-Class extinguishers where the cost of chemical alone exceeds $25 and cannot be reclaimed? Or is the $25 intended strictly to cover minor repairs as stated?

A: Strictly to cover minor repairs above contractual obligations.

3. Q: My company performs all work on site in an enclosed, and custom fabricated trailer (hydrostatic testing, 6 YR maintenance processes, refilling, etc.), removing the inconvenience of the customer having to worry about the logistics of the fire equipment. Would we be able to perform the required work on site at the air base?

A: Yes, we do not anticipate any issues utilizing a trailer. Actually, this is preferred.

4. Q: If we were to perform all work on site. Could we potentially store our trailer on base in a secure area until the contract is complete?

A: Depends on the size of the trailer as we have a site inside the hangar that may work for storage

5. Q: Our technicians work very fast and efficiently, so would we be able to knock out all of the extinguishers which require maintenance in one two to three week trip, or should we plan on the mandatory monthly visits?

A: No, rationale is due to the use of extinguishers on aircraft that are on station. Every effort will be made to ensure maximum availability of assets when contractor personnel are here, but do to our mission sets we won’t be able to have all assets available at once.

Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.