Attach. 2 - Pricing Schedule Amend 0003.pdf

PDF 361 KB Posted

Attached to
Bldg 2071 Carpet Replacement
Solicitation number
FA462025QA935
Issued by

About this file

This document is a Pricing Schedule for a carpet replacement project at Fairchild Air Force Base, specifically for Building 2071. The pricing schedule is structured with four line items: (1) Carpet Cost, (2) Adhesive Cost, (3) Cove Base Cost, and (4) Delivery/Installation Costs. Each item requires vendors to quote the cost separately, with Item 4 encompassing the total delivery, tools, labor, and installation expenses for removing old and installing new carpet, adhesive, and cove base. The pricing schedule is designed for vendors to provide unit prices and total amounts for each line item, with a final Total Evaluated Price (TEP) calculation. The solicitation is issued by the Department of the Air Force Air Mobility Command under contract number FA462025QA935, seeking a comprehensive carpet replacement solution for the specified building.

View the file

Other files

File Type Posted
25QA935 Amend 3 SF30.pdf PDF
Amend 2 SF30.pdf PDF
Amend 1 SF30.pdf PDF
Attach. 1 - Statement of Work.pdf PDF
Attach. 2 - Pricing Schedule.pdf PDF
25QA935 COMBO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462025QA935 – Building 2071 Carpet

PRICING SCHEDULE

Item Description Quantity Units Unit Price Total

Amount

Carpet Cost

Include total cost of carpet only.

Installation costs, tools, labor, and equipment will be quoted on Item 4.

_________ Sq. Ft. $_______ $________

Adhesive Cost

Include total cost of adhesive only. Installation costs, tools, labor, and equipment will be quoted on Item 4.

__________ Each $_______ $_______

Cove Base Cost

Include total cost of cove base only. Installation costs, tools, labor, and equipment will be quoted on Item 4.

Linear.

Ft.

Delivery/Installation Costs

Include the total cost of all delivery, tools, labor, and installation for the removal of old and installation of new carpet, adhesive, and cove base.

1 Lot $_______ $_______

Total Evaluated Price

(TEP)

Total All Contract Line Items (CLINs) $

File details come from the government source that posted it. Updated .