Attach. 2 - Pricing Schedule Amend 0003.pdf
PDF 361 KB Posted
- Attached to
- Bldg 2071 Carpet Replacement
- Solicitation number
- FA462025QA935
About this file
This document is a Pricing Schedule for a carpet replacement project at Fairchild Air Force Base, specifically for Building 2071. The pricing schedule is structured with four line items: (1) Carpet Cost, (2) Adhesive Cost, (3) Cove Base Cost, and (4) Delivery/Installation Costs. Each item requires vendors to quote the cost separately, with Item 4 encompassing the total delivery, tools, labor, and installation expenses for removing old and installing new carpet, adhesive, and cove base. The pricing schedule is designed for vendors to provide unit prices and total amounts for each line item, with a final Total Evaluated Price (TEP) calculation. The solicitation is issued by the Department of the Air Force Air Mobility Command under contract number FA462025QA935, seeking a comprehensive carpet replacement solution for the specified building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25QA935 Amend 3 SF30.pdf | ||
| Amend 2 SF30.pdf | ||
| Amend 1 SF30.pdf | ||
| Attach. 1 - Statement of Work.pdf | ||
| Attach. 2 - Pricing Schedule.pdf | ||
| 25QA935 COMBO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA462025QA935 – Building 2071 Carpet
PRICING SCHEDULE
Item Description Quantity Units Unit Price Total
Amount
Carpet Cost
Include total cost of carpet only.
Installation costs, tools, labor, and equipment will be quoted on Item 4.
_________ Sq. Ft. $_______ $________
Adhesive Cost
Include total cost of adhesive only. Installation costs, tools, labor, and equipment will be quoted on Item 4.
__________ Each $_______ $_______
Cove Base Cost
Include total cost of cove base only. Installation costs, tools, labor, and equipment will be quoted on Item 4.
Linear.
Ft.
Delivery/Installation Costs
Include the total cost of all delivery, tools, labor, and installation for the removal of old and installation of new carpet, adhesive, and cove base.
1 Lot $_______ $_______
Total Evaluated Price
(TEP)
Total All Contract Line Items (CLINs) $
File details come from the government source that posted it. Updated .