Attach.1 Statement of Work Amend 02.pdf
PDF 4 MB Posted
- Attached to
- FY25 LRS Vertical Carousels
- Solicitation number
- FA462025QA906
About this file
This Statement of Work (SOW) details the replacement of vertical carousels at Fairchild Air Force Base, Washington. The government is seeking a contractor to remove seven existing vertical carousel filing systems (four certified and three optional), which involve disassembling and disposing of debris/waste in compliance with local, federal, and state regulations. Serviceable parts such as shelves, bins, drawers, and assemblies must be returned to the government.
The specific carousels to be replaced are located in two buildings: LRS Carousels C, E, F, H, and G (option) in Building 2045, and LRS IPE and Envision Carousels (options) in Building 2163. Each carousel has detailed specifications, including dimensions of 120-124" wide, 65.80-72" deep, and 17-25' high, with 16-23 multipurpose carriers. Key requirements include 480V power supply, emergency hand crank, automatic chain tensioner, safety-light curtain, and access opening light. A certified electrician must handle power disconnection, wiring, and reconnection. The total project must be completed within 120 days after receipt of order, with all new parts being new and not refurbished.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25QA906 Amendment 04.pdf | ||
| 25QA906 Amendment 03.pdf | ||
| 25QA906 Amendment 02.pdf | ||
| 25QA906 Amendment 01.pdf | ||
| 25QA906 Combo Final.pdf | ||
| Attach 1. Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Vertical Carousels
July 2025
FA462025QA906 - FY25 Vertical Carousels Attachment 1 - Statement of Work Amendment 002
Statement of Work (SOW) For
Vertical Carousels
Fairchild AFB, WA
1. BACKGROUND: In multiple locations across Fairchild Air Force Base, aging vertical carousel filing systems are utilized. This effective method of storing supplies allows for efficient utilization of space and ease of retrieval.
2. SCOPE OF WORK: The Contractor shall remove existing carousels by disassembling and disposing of debris/waste in accordance with all local, federal and state regulations. In addition, serviceable parts to include shelves, bins, drawers, assemblies, doors, and the like shall be returned to the government. The contractor shall install new vertical carousel, test for operational capability and disposal of any debris/waste.
The government is requesting (7) Vertical Carousels, four certified and three as an option. The following carousel units shall be delivered and installed at 400 S. Gate 35 Road, Bldg. 2045, Fairchild AFB, WA 99011.
LRS Carousel C LRS Carousel E LRS Carousel F LRS Carousel H LRS Carousel G (Option)
The following carousel units shall be delivered and installed at 500 Arnold Road, Bldg. 2163, Fairchild
AFB, WA 99011.
LRS IPE Carousel (Option) LRS Envision Carousel (Option)
3. OBJECTIVES: Ensure efficient supplies, records and materials storage and handling.
4. REQUIREMENTS: Parts numbers and salient characteristics for each carousel will be specified in the appendices and by CLIN. All parts provided shall be new. No refurbished materials will be accepted.
Standard manufacturer warranties on parts and labor rates shall apply.
5. DELIVERY: All work shall be completed, inspected, and accepted within 120 days ARO.
6. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Personnel performing the work requested will be escorted for the duration on the installation. Individuals must be able to pass a background check that will be conducted prior to entry of the installation. Individuals performing the work will be required to provide their full name, DOB, SSN, driver’s license issuing state and license number to gain access to the installation.
7. PLACE OF PERFORMANCE: All work will be performed on Fairchild Air Force Base in the buildings/locations specified in the appendices and by CLIN.
FA462025QA906 - FY25 Vertical Carousels
8. GENERAL INFORMATION:
8.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with points of contact identified in appendices and by CLIN.
January 1 New Year’s Day
3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
9. APPENDICES:
Appendix A: LRS Carousel C
Appendix B: LRS Carousel E
Appendix C: LRS Carousel F
Appendix D: LRS Carousel H
Appendix E: LRS Carousel G (Option)
Appendix F: LRS IPE Carousel (Option)
Appendix G: LRS Envision Carousel (Option)
FA462025QA906 - FY25 Vertical Carousels
Appendix A – Carousel C
Specifications/Work: Carousel C 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Each Multipurpose Carriers to have 1 Intermediate Shelves for a total of 46 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) Total bins in
Carousel 368 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.
Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached Provide certified electrician to disconnect the power from Carousel C prior to dismantling. The contractor will remove Heavy Duty Safety Switch from Carousel C and re-install on replacement Once the new VC is installed, The contractor shall provide certified electrician to connect power to
Carousel C.
Tear down existing unit (Remstar Vertical Carousel 02.002517/002) and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install
Additional Requirements for seller
Scrap metal bins for disposal of old carousel.
Forklift and scissor lift for installation crew use for duration of installation
Appendix B – Carousel E.
Specifications: Carousel E 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.
Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached
The contractor shall provide certified electrician to disconnect the power from carousels E and F and split the power source to create two separate power sources. The electrician shall reconnect the power to Carousel F to continue operation while Carousel E is dismantled.
Once the new VC is installed, The contractor shall provide certified electrician to connect power to Carousel E.
Tear down existing unit (Remstar Vertical Carousel 02.002519/002). and save the following parts for client to store, the Power Supply and the Display Panel
Work to be done as part of new machine install
Additional Requirements for seller
Appendix C – Carousel F
Specifications: Carousel F 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.
Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached
The contractor shall provide certified electrician to disconnect the power from carousels F while Carousel F is dismantled.
Once the new VC is installed, The contractor shall provide certified electrician to connect power to Carousel F.
Tear down existing unit (Remstar Vertical Carousel 02.002519/002) and save the following parts for client to store, the Power Supply and the Display Panel
Work to be done as part of new machine install
Additional Requirements for seller
Appendix D – Carousel H
Specifications: Carousel H 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) 6 Multipurpose Carriers to have 1 Intermediate Shelves for a total of 12 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) 5 Multipurpose Carriers to have 0 Intermediate Shelves for a total of 5 Levels 5 Multipurpose Carriers to have 2 Intermediate Shelves for a total of 15 Levels Each intermediate shelf must hold 16 bins (24” X 5-6/8” X 5”that have up to 6 dividers) Total Levels within the 16 Carriers is 32 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached
The contractor shall provide certified electrician to disconnect the power from carousels H while Carousel H is dismantled.
The contractor will utilize the wall mounted Heavy Duty Safety Switch for Carousel H when installing for the replacement
The contractor shall install Carousel H Once the new VC is installed, The contractor shall provide certified electrician to connect power to
Carousel H.
Tear down existing unit (Remstar Vertical Carousel 500003281) and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install
Additional Requirements for seller
Scrap metal bins for disposal of old carousel.
Forklift and scissor lift for installation crew use for duration of installation
FA462025QA906 - FY25 Vertical Carousels
Appendix E– Carousel G
Specifications: Carousel G 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) 6 Multipurpose Carriers to have 1 Intermediate Shelves for a total of 12 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) 5 Multipurpose Carriers to have 0 Intermediate Shelves for a total of 5 Levels 5 Multipurpose Carriers to have 2 Intermediate Shelves for a total of 15 Levels Each intermediate shelf must hold 16 bins (24” X 5-6/8” X 5”that have up to 6 dividers) Total Levels within the 16 Carriers is 32 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached
The contractor shall provide certified electrician to disconnect the power from carousels G while Carousel G is dismantled.
The contractor will utilize the wall mounted Heavy Duty Safety Switch for Carousel G when installing for the replacement
The contractor shall install IPE Carousel Once the new VC is installed, The contractor shall provide certified electrician to connect power to
Carousel G.
Tear down existing unit (Remstar Vertical Carousel 500003282). and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install
Additional Requirements for seller
Scrap metal bins for disposal of old carousel.
Forklift and scissor lift for installation crew use for duration of installation
FA462025QA906 - FY25 Vertical Carousels
Main entry into Bldg 2045
Drive are to where the carousels are.
Carousel C area
Carousel G Area
Carousel H Area
Carousel E&F area
Appendix F – IPE Carousel
Specifications: IPE Carousel 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached The contractor shall provide certified electrician to run wiring from the power panel to where the new
IPE carousel will be installed.
The contractor shall install IPE Carousel The contractor shall provide certified electrician to connect power to newly installed IPE carousel and test.
Work to be done as part of new machine install
Additional Requirements for seller
New Carousel placement will be where the divider is currently. All this will be moved just prior to installation.
Main Panel is about 15 feet north of carousel placement
Conduits go up about 20 feet
Conduit runs about 25 feet south from main turn
Conduit can run East to west about 25 feet from the north to south run
End of conduit can run to the beam then drop down 6-10 feet to connect to the new carousel.
View from where the new carousel will be to there equipment will need to be move through
The new carousel will be placed front of the white wall. All items in that area will be moved prior to Installation
Main entry and work area for equipment
Appendix G – Envision Carousel
Specifications: Envision Carousel 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached The contractor shall provide certified electrician to run wiring from the power panel to where the new
Envision carousel will be installed.
The contractor shall install Envision Carousel The contractor shall provide certified electrician to connect power to newly installed Envision carousel and test.
Work to be done as part of new machine install
Additional Requirements for seller
New installation will start where the wall dividers are and go left. The file cabinets will be where the carousel will be.
The Power box is on the east wall within the Envision area, approximately 22 Feet to the new carousel and the conduit going up about 17 Feet
Conduits currently run above where the new carousel will be. 24-26 Feet from Upper conduit
This is the entrance in Envision to where the parts to assemble the carousel will have to go. To the left of the open gate, that fence is a rolling gate, 10 Feet Wide
Main entry and work area for equipment
Heavy Duty Safety Switch to be removed from dismantled carousel and installed on new one.
Possible need for Shims to level out