Attach 1. Statement of Work.pdf

PDF 3 MB Posted

Attached to
FY25 LRS Vertical Carousels
Solicitation number
FA462025QA906
Issued by

About this file

The document is a Statement of Work (SOW) for the replacement of seven vertical carousels at Fairchild Air Force Base. The government requires the contractor to remove existing Remstar Vertical Carousels from multiple locations, dispose of debris in compliance with local, federal, and state regulations, and return serviceable parts to the government. Four carousels are certified for replacement (Carousel C, E, F, and H), with three additional carousels (Carousel G, IPE Carousel, and Envision Carousel) as optional installations.

Each carousel has specific technical requirements, including dimensions of 120"-124" wide, 65.80"-72" deep, and 17'-25' high, with 16-23 multipurpose carriers, worksurfaces 12-15" deep, and power requirements of 480V / 3~ / 50/60 Hz. The carousels must include safety features such as emergency hand cranks, automatic chain tensioners, access opening lights, and safety-light curtains. The contractor must provide certified electricians to disconnect and reconnect power, utilize existing Heavy Duty Safety Switches, and install the new vertical carousels at two locations within Fairchild Air Force Base. Additional requirements include providing forklift and scissor lifts, and using scrap metal bins for old carousel disposal.

View the file

Other files

File Type Posted
25QA906 Amendment 04.pdf PDF
25QA906 Amendment 03.pdf PDF
25QA906 Amendment 02.pdf PDF
Attach.1 Statement of Work Amend 02.pdf PDF
25QA906 Amendment 01.pdf PDF
25QA906 Combo Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Vertical Carousels

July 2025

FA462025QA906

Attach 1. Statement of Work

Statement of Work (SOW) For

Vertical Carousels

Fairchild AFB, WA

1. BACKGROUND: In multiple locations across Fairchild Air Force Base, aging vertical carousel filing systems are utilized. This effective method of storing supplies allows for efficient utilization of space and ease of retrieval.

2. SCOPE OF WORK: The Contractor shall remove existing carousels by disassembling and disposing of debris/waste in accordance with all local, federal and state regulations. In addition, serviceable parts to include shelves, bins, drawers, assemblies, doors, and the like shall be returned to the government. The contractor shall install new vertical carousel, test for operational capability and disposal of any debris/waste.

The government is requesting (7) Vertical Carousels, four certified and three as an option. The following carousel units shall be delivered and installed at 400 S. Gate 35 Road, Bldg. 2045, Fairchild AFB, WA 99011.

LRS Carousel C LRS Carousel E LRS Carousel F LRS Carousel H LRS Carousel G (Option)

The following carousel units shall be delivered and installed at 500 Arnold Road, Bldg. 2163, Fairchild

AFB, WA 99011.

LRS IPE Carousel (Option) LRS Envision Carousel (Option)

3. OBJECTIVES: Ensure efficient supplies, records and materials storage and handling.

4. REQUIREMENTS: Parts numbers and salient characteristics for each carousel will be specified in the appendices and by CLIN. All parts provided shall be new. No refurbished materials will be accepted.

Standard manufacturer warranties on parts and labor rates shall apply.

5. DELIVERY: All work shall be completed, inspected, and accepted within the time specified upon award.

6. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Personnel performing the work requested will be escorted for the duration on the installation. Individuals must be able to pass a background check that will be conducted prior to entry of the installation. Individuals performing the work will be required to provide their full name, DOB, SSN, driver’s license issuing state and license number to gain access to the installation.

7. PLACE OF PERFORMANCE: All work will be performed on Fairchild Air Force Base in the buildings/locations specified in the appendices and by CLIN.

8. GENERAL INFORMATION:

8.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with points of contact identified in appendices and by CLIN.

January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day

Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day

1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day

4th Thursday in November Thanksgiving Day December 25 Christmas

9. APPENDICES:

Appendix A: LRS Carousel C

Appendix B: LRS Carousel E

Appendix C: LRS Carousel F

Appendix D: LRS Carousel H

Appendix E: LRS Carousel G (Option)

Appendix F: LRS IPE Carousel (Option)

Appendix G: LRS Envision Carousel (Option)

Appendix A – Carousel C

Specifications/Work: Carousel C 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Each Multipurpose Carriers to have 1 Intermediate Shelves for a total of 46 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) Total bins in

Carousel 368 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.

Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached Provide certified electrician to disconnect the power from Carousel C prior to dismantling. The contractor will remove Heavy Duty Safety Switch from Carousel C and re-install on replacement Once the new VC is installed, The contractor shall provide certified electrician to connect power to

Carousel C.

Tear down existing unit (Remstar Vertical Carousel 02.002517/002) and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install

Additional Requirements for seller

Scrap metal bins for disposal of old carousel.

Forklift and scissor lift for installation crew use for duration of installation

Appendix B – Carousel E.

Specifications: Carousel E 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.

Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached

The contractor shall provide certified electrician to disconnect the power from carousels E and F and split the power source to create two separate power sources. The electrician shall reconnect the power to Carousel F to continue operation while Carousel E is dismantled.

Once the new VC is installed, The contractor shall provide certified electrician to connect power to Carousel E.

Tear down existing unit (Remstar Vertical Carousel 02.002519/002). and save the following parts for client to store, the Power Supply and the Display Panel

Work to be done as part of new machine install

Additional Requirements for seller

Appendix C – Carousel F

Specifications: Carousel F 121-123” wide x 65.80 - 67” deep x 23'4" – 25’ high Worksurface – 12-15” deep 23 Multipurpose Carriers (L= 98-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank provides access to stored products at all times.

Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached

The contractor shall provide certified electrician to disconnect the power from carousels F while Carousel F is dismantled.

Once the new VC is installed, The contractor shall provide certified electrician to connect power to Carousel F.

Tear down existing unit (Remstar Vertical Carousel 02.002519/002) and save the following parts for client to store, the Power Supply and the Display Panel

Work to be done as part of new machine install

Additional Requirements for seller

Appendix D – Carousel H

Specifications: Carousel H 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) 6 Multipurpose Carriers to have 1 Intermediate Shelves for a total of 12 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) 5 Multipurpose Carriers to have 0 Intermediate Shelves for a total of 5 Levels 5 Multipurpose Carriers to have 2 Intermediate Shelves for a total of 15 Levels Each intermediate shelf must hold 16 bins (24” X 5-6/8” X 5”that have up to 6 dividers) Total Levels within the 16 Carriers is 32 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached

The contractor shall provide certified electrician to disconnect the power from carousels H while Carousel H is dismantled.

The contractor will utilize the wall mounted Heavy Duty Safety Switch for Carousel H when installing for the replacement

The contractor shall install Carousel H Once the new VC is installed, The contractor shall provide certified electrician to connect power to

Carousel H.

Tear down existing unit (Remstar Vertical Carousel 500003281) and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install

Additional Requirements for seller

Scrap metal bins for disposal of old carousel.

Forklift and scissor lift for installation crew use for duration of installation

Appendix E– Carousel G

Specifications: Carousel G 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) 6 Multipurpose Carriers to have 1 Intermediate Shelves for a total of 12 Levels Each intermediate shelf must hold 8 bins (24” X 12” X 8.5” that have up to 3 dividers) 5 Multipurpose Carriers to have 0 Intermediate Shelves for a total of 5 Levels 5 Multipurpose Carriers to have 2 Intermediate Shelves for a total of 15 Levels Each intermediate shelf must hold 16 bins (24” X 5-6/8” X 5”that have up to 6 dividers) Total Levels within the 16 Carriers is 32 Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached

The contractor shall provide certified electrician to disconnect the power from carousels G while Carousel G is dismantled.

The contractor will utilize the wall mounted Heavy Duty Safety Switch for Carousel G when installing for the replacement

The contractor shall install IPE Carousel Once the new VC is installed, The contractor shall provide certified electrician to connect power to

Carousel G.

Tear down existing unit (Remstar Vertical Carousel 500003282). and save the following parts for client to store, the Power Supply and the Display Panel Work to be done as part of new machine install

Additional Requirements for seller

Scrap metal bins for disposal of old carousel.

Forklift and scissor lift for installation crew use for duration of installation

Appendix F – IPE Carousel

Specifications: IPE Carousel 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached The contractor shall provide certified electrician to run wiring from the power panel to where the new

IPE carousel will be installed.

The contractor shall install IPE Carousel The contractor shall provide certified electrician to connect power to newly installed IPE carousel and test.

Work to be done as part of new machine install

Additional Requirements for seller

Appendix G – Envision Carousel

Specifications: Envision Carousel 120”- 124” wide x 70”-72” deep x 17’- 18’ high Worksurface – 12-15” deep 16 Multipurpose Carriers (L= 96-1/2” X H= 20” X D= 24-1/2”) Power Requirement: 480V / 3~ / 50/60 Hz Emergency hand crank Automatic chain tensioner Access opening light for improved visibility at work shelf and access opening Safety-light curtain: Automatically stops carousel rotation when breached The contractor shall provide certified electrician to run wiring from the power panel to where the new

Envision carousel will be installed.

The contractor shall install Envision Carousel The contractor shall provide certified electrician to connect power to newly installed Envision carousel and test.

Work to be done as part of new machine install

Additional Requirements for seller

Heavy Duty Safety Switch to be removed from dismantled carousel and installed on new one.

Possible need for Shims to level out