This document is an amendment to Solicitation FA462024QA233 for the Warrior DFAC Dishwasher contract. The amendment extends the offer due date from June 25, 2024 to July 2, 2024 and provides responses to questions from prospective offerors. The questions cover availability of as-built drawings, photos of the current setup, floor plans, loading dock access, and disposal of old equipment. The amendment indicates that concept drawings will be provided as attachments and that a dumpster will be available, but no full floor plans are available. The solicitation requires the contractor to provide and install a Hobart Model CLPS86EN-ADV+BUILDUP dishwasher and an Aerowerks Model QP244100 tabling unit in accordance with the Statement of Work.

View the file

Other files for this federal contract opportunity

Other files attached to Warrior DFAC Dishwasher, newest first.
File Type Posted
Attach. 1 - Statement of Work (Amend 02).pdf PDF
Amend 02.pdf PDF
Attach. 2 - Concept Drawing.pdf PDF
Amend 0001 24QA233 Combo.pdf PDF
Attach. 1 - Statement of Work.pdf PDF
24QA233 DFAC Dishwasher.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXCEPTION OF SF 30, APPROVED BY NARS 5/79

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

FA462024QA233

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

25Jun24

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

FA4620 7. ADMINISTERED BY (If other than Item 6)

CODE

92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: brandon.terry.9@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

X

FA462024QA233

All Offerors 9B. DATED (SEE ITEM 11)

11June2024

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [X] is extended, [] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE SUMMARY OF CHANGES

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Brandon M. Terry, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FA462024QA233

Amendment 0001 Page 2

SUMMARY OF CHANGES

The purpose of this Amendment is to:

1. Extend the date offers due from 25 June 2024 to 2 July 2024 at 1:00 p.m. PST.

2. Respond to questions received from prospective offerors:

Q1. Are there any current as built drawings for the current Hobart unit (CLPS86ENADV+BUILDUP)?

A1. Concept Drawing Attached

Q2. Are there any current as bult drawings for the Aeroworks tabling (QP244100)?

A2. Concept Drawing Attached

Q3. Are there any pictures available of the current set up?

A3. photos will be included in a follow on amendment later in the week.

Q4. Are there any drawings available of the space these units will be installed into?

A4. Concept Drawing Attached

Q5. Is there clear access to a loading dock and the ability to get large equipment into and out of the dish area for installation.

A5. Yes, a loading dock is available

Q6. Will the old units be disposed of by the government?

A6. No, As stated in the SOW it is the contractors responsibility

Q7. Will a dumpster be made available for trash/packaging?

A7. Yes, a dumpster is available

Q8. Is there a drawing/floor plan available?

A8. No

Q9. Does this include installation of the new equipment as well as removal and disposal of the old equipment?

A9. Yes, this includes installation of the new equipment as well as removal and disposal of the old equipment as stated in the statement of work.

Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.

END SUMMARY OF CHANGES

List of Attachments

Attach. 2 – Concept Drawing