Attachment 2 Performance Work Statement (REV 1).pdf
PDF 875 KB Posted
- Attached to
- Elevator Maintenance, Repair and Inspection Services Federal contract opportunity
- Solicitation number
- FA462020QA200
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Performance Work Statement (REV 2).pdf | ||
| Attachment 1 FA462020QA200 - Combo RFQ Elevators (REV 2).pdf | ||
| SF30 Amendment 3 FA462020QA200.pdf | ||
| SF30 Amendment 2.pdf | ||
| Attachment 1 FA462020QA200 - Combo RFQ - FY21 Elevators (REV 1).pdf | ||
| Attachment 4 Past Performance Questionnaire (REV 1).pdf | ||
| SF30 Amendment 1 FA462020QA200.pdf | ||
| Attachment 4 Past Performance Questionaire (REV 1).pdf | ||
| Attachment 2 Wage Determination.pdf | ||
| FA462020QA200 - Combo RFQ - FY21 Elevators.pdf | ||
| Attachment 1 Performance Work Statement.pdf | ||
| Attachment 3 OPSEC Information.pdf | ||
| Attachment 4 Past Performance Questionnaire.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR FAIRCHILD AFB WA
VERTICAL TRANSPORTATION EQUIPMENT
MAINTENANCE, REPAIR, & INSPECTION
SERVICES
23 SEPTEMBER 2019
FA462020QA200
Attachment 1 Performance Work Statement
PERFORMANCE WORK STATEMENT (PWS) FOR
VERTICAL TRANSPORTATION EQUIPMENT MAINTENANCE, REPAIR, &
INSPECTION SERVICES
1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Fairchild AFB WA in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph 2 below). The VTE and their locations will be listed in Appendix A. NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix A: freight and passenger elevators, escalators, and may include wheelchair/stair lifts, dock levelers, and dumbwaiters.
1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, the monthly fixed price includes all inspections, maintenance, repairs, including replaceing lights, and routine and emergency service calls. This contract allows the government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.
1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2016 (or applicable code for year VTE put in service) Safety Code for Elevators and Escalators (ASME A17.1); ANSI/ASME A17.2-2017, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment); A17.3-2015, Safety Code for Existing Elevators and Escalators (applicable to equipment); National Fire Protection Association Standards (NFPA); Unified Facilities Criteria (UFC) 3-600-01; Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer
(OEM).
2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:
2.1. Alterations (a.k.a., modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)
2.2. Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in the contract.
2.3. Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.
2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.
2.5. In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the Contracting Officer’s Representative (COR). The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.
3. DEFINITIONS:
3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing VTE and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely.
Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.
3.2 Alteration. An alteration is also on existing VTE but is not included under the full maintenance service arrangement. Alteration/modernization will be covered on an over and above Contract Line Item or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.
4. MAINTENANCE AND INSPECTION SERVICES:
4.1. The Contractor with the CO/COR (or representative) shall determine the working order and condition of all VTE listed in Appendix A within thirty (30) calendar days of contract award. The government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the Contractor to replace the missing items, accomplish the repair, and reimburse the Contractor in accordance with the contract. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3. The Contractor and the CO shall certify their agreement as to the working order of the equipment. All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).
4.2. The Contractor shall develop and submit to the government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days after contract award to cover both the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The Contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure the contractor’s compliance with all minimum code requirements.
4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.
4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required.
4.5. The Contractor shall perform necessary inspections and tests as required under ASME A17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five-(5)-year test for all traction and roped hydraulic elevators regardless of due date. The three- (3) - year test shall be scheduled in conjunction with the annual test two years later from the first annual test. Annual safety inspection test certificates will be displayed in the cab of the elevator. The certificate will show the month the test was completed and when the next test is due. Copies will be provided to the building facility manager and COR.
4.6. The government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor will be notified in writing of any determination and may be responsible for the corrective actions.
4.7. The Contractor shall prepare and submit a written report within two (2) business days of work. The report shall identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.
4.8. The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR upon request;
however, no later than one (1) business day of a request to review.
4.9. The Contractor will coordinate within 30 days after award with the Fairchild AFB Fire Department to ensure that the Fire Department has all the fire keys for elevators located on Fairchild AFB WA.
5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the VTE at no additional cost to the government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency).
Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency. The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14.21.13 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, UFGS 14 24 13 Hydraulic Passenger Elevators, and UFGS 14 24 23 Hydraulic Freight Elevators for guidance.
5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.
5.1.1. In the event that an elevator, dumbwaiter, handicapped lift, or chairlift fails or malfunctions, the contractor shall be notified by the COR.
5.1.2. The Contractor shall respond in-person to the VTE and begin work on routine service calls at no additional cost to the government within three (3) business days after receipt of the call on regular scheduled work days/hours.
5.1.3. The Contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the
CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.
5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.
5.2.1. In the event that an elevator, dumbwaiter, handicapped lift, or chairlift fails or malfunctions, the contractor shall be notified by the COR.
5.2.2. The Contractor shall respond in person to the VTE and begin work on emergency service calls within
(1) business day after receipt of the call.
5.2.3. The Contractor shall report to the work location, survey the repair, and provide base contracting an estimate of time to repair and cost of repairs not covered in the basic full maintenance service contract but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.
6. SERVICES SUMMARY.
The government will evaluate the Contractor performance in accordance with the following criteria.
Performance evaluations will be rendered in one or more government databases for that purpose.
Performance Objective PWS Paragraph
Performance Threshold Remedy
1. Written Maintenance Control Program (MCP) for each VTE for all equipment.
MCP identifies all maintenance intervals to include safety inspections.
4 MCP in accordance with ASME A17.1 delivered to CO in 30 calendar days of contract award.
Re-perform within 3 Business Days
2. VTE Service Availability 4 VTE availability is 95%.
Calculation = ((sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)).
Re-perform within 1 Business Day
3. Repair Service Call Routine – Response Time.
Response to routine calls within time specified in paragraph 5.1.2.
5 Response to routine service calls are on-time 100% of the time on a monthly basis.
Emergency Call:
Re-perform within 1 Business Day
Routine Call: Re-perform within 2 Business Days
4. Repair Service Call Emergency – Response Time.
5 Response to emergency service calls are on-time
Re-perform same day
Response to emergency calls within time specified in paragraph 5.2.2.
100% of the time on a monthly basis.
5. Service Call Repairs – Repair Quality.
Repairs are of high quality resulting in reduced call backs.
5 Only two call backs of the same problem (same instance) each month.
Contrator identifies and corrects unreliable parts or repair methods
6. Inspection – MCP Adherence 4.2,4.3 Conducts Inspection IAW
MCP 100%
Any deviation or revisions must have CO Approval
7. Preventative Maintenance - MCP Adherence
4.7., 5.1.3, 5.2.3.
Preventative maintenance performed to MCP 100% of time.
Re-perform within 1 Business Day
8. Reporting including annual inspection certificates
2, 4, 5 Submit reports in a manner consistent with PWS 100% of the time.
Re-perform within 1 Business Day
7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government does not anticipate providing any government furnished property (GFP). All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR.
8. GENERAL INFORMATION.
8.1. QUALITY CONTROL. Contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance.
The Contractor shall maintain the QCP throughout the period of performance of the contract. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.
8.2. QUALITY ASSURANCE. The government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.
8.3. HOURS OF OPERATION. Hours of Operation. The contractor shall VTE maintenance services during normal duty hours which are 0730-1630, Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the CO. The contractor is not required to provide service on federal holidays, except in emergency situations. Federal holidays are as follows:
New Year’s Day - 1 January Labor Day - 1st Monday in September Martin Luther King Day - 3rd Monday in January Columbus Day - 2nd Monday in October Washington’s Birthday - 3rd Monday in February Veteran’s Day - 11 November Memorial Day - last Monday in May Thanksgiving Day - 4th Thursday in November Independence Day - 4 July Christmas Day - 25 December
8.4. SECURITY REQUIREMENTS. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Police Squadron, Pass and Registration and will comply with Fairchild AFB directives. After award of contract, the contractor shall request through the COR, CO, and Security Forces that base passes and identification badges be issued for their employees and work vehicles.
8.5. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES DURING
CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS
COMBATANT COMMANDER. This service does not meet the criteria for continuation of performance during a crisis.
8.6. SPECIAL QUALIFICATIONS. The Contractor must be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to CO/COR upon request) in maintenance of VTE.
8.7. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/COR. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.
8.8. Base Closures. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.
8.9. Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes. All documentation needed for base passes shall be submitted at the Pre-Performance Conference.
8.10. ENVIRONMENTALLY PREFERABLE PURCHASING. In order to comply with federally mandated environmental preference programs and Department of Defense (DOD) “Sustainable Procurement Program” (SPP) policy, Fairchild AFB requires the use of environmentally preferable products and services. These program elements include: recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, products which are non-ozone depleting or are non-toxic or less toxic alternatives and environmentally preferable products. These program elements are described on the Fed Center website at https://www.fedcenter.gov/programs/buygreen/. The Green Procurement Compilation website (http://sftool.gov/greenprocurement) provides a comprehensive green purchasing resource and identifies all product types covered by mandatory federal environmental programs.
8.10.1. PRODUCTS AND MATERIALS. If it is determined that if a product does not meet government performance requirements, the contractor shall submit a proposed alternative that would meet the performance requirements with the lowest environmental impact for evaluation and acceptance. Products that fall under the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) shall meet the minimum recovered (recycled) content. Bio-based products shall meet the requirements of the biobased product listing from the United States Department of Agriculture (USDA) (http://www.biopreferred.gov/). The contractor shall purchase and use Energy Star or other energy-efficient items listed on the Department of Energy’s Federal Energy Management Program (FEMP) Product Energy Efficiency Recommendations product list. Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. Before implementing any change that
FA462020QA200
Attachment 1 Performance Work Statement https://www.fedcenter.gov/programs/buygreen/ http://sftool.gov/greenprocurement https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program http://www.biopreferred.gov/ results from amendments to these listed publications that will result in a change to the contract price, the contractor shall submit to the Contracting Officer a price proposal within 30 calendar days following receipt of the change. An equitable adjustment (increase or decrease) shall be negotiated.
8.11. CONTRACTOR HAZARDOUS MATERIALS. In accordance with AFI 32-7086, Hazardous Materials Management, 4 Feb 15, a hazardous material includes all items covered under EPCRA tracking requirements, the OSHA HAZCOM standard, and all Class I and II Ozone Depleting Substances. The Contractor shall be responsible for the proper storage, management, and disposal of any hazardous material brought on Base for contractor use.
8.12. HAZARDOUS MATERIAL STORAGE. For any single hazardous material stored on-site in a quantity equal to or exceeding 55-gallons at any time, the contractor shall provide secondary containment for the entire quantity of that hazardous material. Hazardous material shall be stored within a locked secure area not accessible to the base populace after hours. All containers of hazardous material shall be clearly and properly labeled; closed when not in use; and stored in an upright, secure position.
8.13. HAZARDOUS MATERIAL AUTHORIZATION. The Contractor shall submit to the COR, prior to using hazardous materials (HAZMAT), a Contractor Hazardous Material Work Sheet and corresponding Safety Data Sheet (SDS) for each hazardous material to be brought onto the base during the performance of the contract. This work sheet and SDS shall be completed for each and every hazardous material to be used by the Contractor. If during the course of the contract, items not previously identified are to be brought on the base, the Contractor shall submit a Work Sheet and SDS for approval prior to bringing the HAZMAT onto the base.
8.14. HAZARDOUS MATERIAL USAGE. Within seven calendar days of the end of every month, the Contractor shall submit to COR, the quantities of each hazardous material actually used on the base during the month, utilizing and annotating the government-provided chemical authorization list. List can be obtained from 92 CES/CEIE via the COR. This information should be included in the monthly report described above.
8.15. HAZARDOUS MATERIAL REMOVAL. No hazardous material shall be left on-site at the end of a contract.
8.16. COSTS OR FINES. Any costs or fines levied against the installation due to the contractor’s failure to comply with applicable Federal, State, or local laws shall be borne by the contractor.
8.17. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL
CLEARANCES AND VEHICLE PASSES. All documentation needed for base passes shall be submitted at the Pre-Performance Conference. Due to the nature of the work only US nationals or verified Green Card holders are eligible to enter FAFB and all personnel must have a pictured ID that is compliant with the REAL ID Act of 2005. Due to the sensitive nature of the mission performed at Fairchild all contractors performing work under this contract must be U.S. Citizens.
8.18. COMPLIANCE WITH LAWS AND REGULATIONS. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change the term of this contract, the contractor shall comply with such law/regulation as changed. If there is an increase or decrease in cost as a result of the change, the contractor shall immediately inform the CO.
8.19. WEAPONS, FIREARMS, AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately-owned vehicle while on FAFB.
8.20. REPORTING REQUIREMENTS. Contractor personnel shall report any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information.to the Law Enforcement (LE) Desk at (509) 247-5494.
8.21. PHYSICAL SECURITY. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
8.22. PERSONNEL APPEARANCE. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, bearing the company name or logo that is visible at all times. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
8.23. KEY CONTROL. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks at cost to the government. The government may, however, at its option, replace the affected lock or locks or, at its option perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system at the contractor’s expense.
8.24. RESTRICTIONS. The government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.
8.25. NON-PERSONAL SERVICES AND/OR INHERENTLY GOVERNMENTAL SERVICES.
The government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the CO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the government.
APPENDICES.
A. Include VTE Equipment Listing B. Publications C. Acronyms
Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair and Inspection Services
Appendix A
Item Type of VTE Location of VTE/Stops Manufacturer
Capacity
(LBS)
S/N# Year
Installed
Geared Passenger
Bldg 1204, Air Traffic Control Tower 8 Stops
Schindler Haughton, 1984
1200 lbs
18359
Selective/Collective Hydraulic Passenger
Bldg 1252, Survival Inn Billeting 3 Stops
Millar
3500 lbs
61643
Bldg 2005, 2 Stops
Dover
2500 lbs
EG3760
Bldg 2007, 92
OSS
EJ3118
Bldg 2090, 92 ARS, Squadron Operations
EJ3118
Bldg 2097, 92
AMXS
2 Stops
Montgomery
KONE
90039
Hydraulic Rotary
Bldg 2245, 92
CPTS, 92/141 CS
Montgomery
KONE, 1988
60250
Bldg 2380, Education Center/Library
3500 lbs
EK8957
Item Type of VTE
Location of VTE/Stops
Manufacturer Capacity
(LBS)
S/N# Year
Installed
Hydraulic Passenger
Bldg 2045, Logistics Readiness Sq 2 Stops
Schindler 2500 lbs 866A365H02
10 Hydraulic Cargo
Bldg 2045, Logistics Readiness SQ 2 Stops
ACUA 4000lbs EY4890
11 Traction Passenger
Bldg 2187 92
ARW HQ
2 stops
ThyssenKrupp Synergy 85S
3000 lbs P-1 CBU275
Hydraulic Passenger
Bldg 12 68 SERE
HQ
2 Stops Schindler
3500 lbs 3304
Hydraulic Passenger
Bldg 12 68 SERE
HQ
2 Stops ThyssenKrupp
2500 lbs EBU975
Hydraulic Passenger
Bldg 2379 Fittness Center 2 Stops ThyssenKrupp
2500 lbs EAT590
Hydraulic Passenger
Bldg 4400, Army Reserve Center ThyssenKrupp
Tac-20 3500 lbs EY4890
FA462020QA200
Attachment 1 Performance Work Statement
1159108879C Highlight
1159108879C Highlight
Appendix B – PUBLICATIONS LIST
In addition to all applicable federal, state, and local laws and regulations, the following instructions, forms, and guidance shall be followed in the performance of this contract. Copies can be viewed at the following websites:
a) http://www.e-publishing.af.mil/
b) http://www.dtic.mil/whs/directives/infomgt/forms/index.htm, and DoD
c) http://www.dtic.mil/whs/directives/corres/ins1.html
d) https://www.gsa.gov/reference/forms#
e) https://www.esd.whs.mil/Directives/forms/
PUBLICATION/FORM TITLE DATE
Pub.L. 109-13, 119 Stat. 302 Real ID Act 2005 AFI 16-1406 Air Force Industrial Security Program 25 Aug 2015 AFI 17-130 Cyber Security Management 31 Aug 2015 AFI 32-7086 Hazardous Materials Management 04 Feb 2015 AFI 33-322 Records Management Program 04 Jun 2012 AFI 33-332 Air Force Privacy and Civil Liberties Program 12 Jan 2015 AFI63-101-20-101 Integrated Life Cycle Management 09 May 2017 AFI 63-138 Service Acquisition 11 May 2017 AFI 71-101V1 Criminal Investigations Program 08 Oct 2015 AFI 71-101V2 Protective Service Matters 23 Jan 2015 AFPD 33-3 Information Management 08 Sep 2011 AFMAN 33-363 Management of Records 01 Mar 2008 DODI 1100.22 Policy and Procedures for Determining Workforce Mix 01 Dec 2017
DODM 5200.1, Vol 1-4 DOD Information Security Program 24 Feb 2012 DODM 5200.2 Procedures for the DoD Personnel Security Program (PSP) 03 Apr 2017 DODI 5220.22M&R National Industrial Security Program 01 May 2018 DODI 5200.02 DOD Personnel Security Program 11 May 2018 DODI 5200.46 DOD Investigative and Adjudicative Guidance for Issuing the Common Access Card 04 May 2018
DOD 6025.18 DOD Health Information Privacy Regulation 13 Mar 2019 ASME A17.1-2016 Safety Code for Elevators and Escalators, 17 Nov 2016 ASME A17.1, Appendix N Using a Qualified Elevator Inspector
17 Nov 2016 ANSI/ASME A17.2 Guide for Inspection of Elevators, Escalators and Moving
Walkways
UFC 3-600-01 Fire Protection Engineering for Facilities Change 3, 10 May 2019
UFGS 14.21.13 Electric Traction Freight Elevators 1 May 2015 UFGS 14.21.23 Electric Traction Passenger Elevators 1 May 2015 UFGS 14.24.13 and 23 Hydraulic Elevators Passenger/Freight 1 May 2015 http://www.e-publishing.af.mil/ http://www.dtic.mil/whs/directives/infomgt/forms/index.htm%2C%20and%20DoD http://www.dtic.mil/whs/directives/corres/ins1.html https://www.gsa.gov/reference/forms https://www.esd.whs.mil/Directives/forms/
APPENDIX C – ACRYONYMS
AFI Air Force Instruction AFMAN Air Force Manual AFOSH Air Force Occupational Safety and Health AMC Air Mobility Command ANSI American National Standards Institute
ASME
American Society of Mechanical Engineers CAC Common Access Card
CAP Corrective Action Plan CBT Computer Based Training COMSEC Communications Security CTIP Combat Trafficking in Person CTO Commercial Travel Office DEERS Defense Enrollment Eligibility Reporting System DISCO Defense Industrial Security Clearance Office EPA Enviornmental Protection Agency FAFB Fairchild Air Force Base FSO Facility Security Officer GTC Government Travel Card IA Information Awareness IAW In Accordance With IT Information Technology MX Maintenance NFPA National Fire Protection Association OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Administration TDY Temporary Duty TFAT Total Force Awareness Training TMT Task Management Tool TSOS Tanker Squadron Operations Support QEI Qualified Elevator Inspector UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UTC Unit Type Code VTE Vertical Transportation Equipment
| PERFORMANCE WORK STATEMENT |
| Appendix B – PUBLICATIONS LIST |
File details come from the government source that posted it. Updated .