Past Performance Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to Loop Filtration System Installation Services, newest first.
File Type Posted
Synopsis_of_Award_-_Loop_Filtration.pdf PDF
Attch_2_LFS_QASP_dtd_4_Sep_15.docx DOCX document
FA4620-15-Q-A024.pdf PDF
Attch_1_LFS_PWS_dtd_3_Sep_15.docx DOCX document
Attch_4_Wage_Determination.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4620-15-Q-A024

Attachment 3

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name: ____________________ Telephone Number: ____________________ Address: __________________________ Fax Number: _________________________ __________________________ Point of Contact: ______________________

__________________________
__________________________

Project Title and Brief Description of Work: _____________________________________*

Contract Number Provided by Offeror: ___________________ Dollar Amount: ________*

Contract Period or Dates of Performance Provided by Offeror: ______________________* Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.

* Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

B. RESPONDENT INFORMATION:

Name of Respondent: _____________________ Title: ____________________________

Address: _____________________Telephone Number: ___________________ _____________________________Fax Number:_____________________
_____________________________Email Address: _____________________

C. SEND COMPLETED SURVEY FORM TO: SrA Naomi Haney at naomi.haney@us.af.mil D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E
G
S
M
U
N
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral

Performance meets/met contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets/met contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
Performance meets/met contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Performance does not meet/did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet/did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

Place an “X” in the appropriate column using the definitions matrix above.

The contractor:
E
G
S
M
U
N
1.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
2.
Provided effective quality control and/or inspection procedures to meet contract requirements.
3.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
4.
Identified problems as they occurred and suggested alternative approaches.
5.
Met established project schedules.
6.
Was responsive to contract changes.
7.
Provided adequate project supervision.
8.
How would you rate the contractor's overall performance on this contract?
9.
Was the requirement related to performing maintenance, installation, or repair of hot water boiler systems?
YES/NO
10.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES/NO

11.
Would you award another contract to this contractor? If not, explain why in “remarks.”

YES/NO

Remarks:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________