Attch_1_LFS_PWS_dtd_3_Sep_15.docx

DOCX document 85 KB Posted

Attached to
Loop Filtration System Installation Services Federal contract opportunity
Solicitation number
FA4620-15-Q-A024
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 1 Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Loop Filtration System Installation Services, newest first.
File Type Posted
Synopsis_of_Award_-_Loop_Filtration.pdf PDF
Attch_2_LFS_QASP_dtd_4_Sep_15.docx DOCX document
Attch_3_PPQ.docx DOCX document
FA4620-15-Q-A024.pdf PDF
Attch_4_Wage_Determination.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4620-15-Q-A024

Attachment 1

PERFORMANCE-BASED WORK STATEMENT (PWS)

FOR

LOOP FILTRATION SYSTEM INSTALL

FAIRCHILD AFB, WA

3 September 2015

1. Description Of Services The contractor shall take all actions necessary to install sixty-five (65) Loop Filtration Systems (LFS) in thirty-eight (38) selected buildings on Fairchild AFB, WA. The LFS will be provided as Government-furnished material. The filters are located in the mechanical rooms of each building. The Government will provide parts as listed in Appendix B, as needed, to install and connect the LFS. However, it is the offeror’s responsibility to identify missing parts and furnish them as required. All work must be accomplished in accordance with all applicable laws and regulations, building codes and the applicable portions of the base design standards. LFS must be fully functional when all work is completed.

2.0 Task Requirements and Applicable Documents.

2.1. The LFS to be installed are SHELCO systems model # 2BFS-2C-3-GPA. The maximum operating pressure is 150 psig (10.3 bar) at 300 ºF. The connections inlet/outlet specification is RF flange (Standard) 3”- 12 HPl. The following gasket materials are acceptable: EPR (FDA Grade) Buna, Silicone, Teflon Encapsulated Silicone, and Viton.

2.2. The contractor shall install the LFS in an accessible location. Accessibility to other equipment in the mechanical room must not be impinged. Access panels to other equipment in the mechanical room shall not be obstructed and all installed equipment must meet spacing mandates identified in the base design standards and applicable building codes. Each mechanical room has a slightly different layout and the system installation must be designed to meet the system’s individual setup.

2.3. The contractor shall provide all labor, equipment, materials, pipings, insulations and parts besides what is provided as government furnished material, listed in Appendix B. The contractor shall provide its standard commercial warranty to all works and parts furnished under the contract.

2.4. After installation all LFS shall be operationally tested prior to acceptance by the government. All parts installed must be working properly with no leaks. The Contracting Officer Representative (COR) will inspect all installed LFS prior to acceptance of work.

2.5 SERVICES SUMMARY. The Services Summary provides a synopsis of the key performance objectives that relate directly to standards of performance required to meet mission needs for Fairchild’s boiler LFS. Assigned performance thresholds provide a baseline for the COR to determine whether the contractor has performed satisfactorily. These performance objectives and thresholds are key to the customer being able to achieve mission success. It is imperative that the contractor perform LFS installation services satisfactorily in order to achieve that success.

SERVICES SUMMARY

Performance Objective
PWS Para
Performance Threshold
All LFS are installed in an accessible location and not impeding access to panels or other equipment in the mechanical room.
PWS Para 2.2
No more than 1 valid customer complaint for all system installed
All LFS are installed properly with no leaks or defects.
PWS Para 2.4
No more than 1 valid customer complaint for all system installed

3. Government-furnished material. The materials that are contained in each building vary based on design and installation of the boilers and A/C systems. Not all parts needed to install the LFS are provided by the government and the contractor is responsible for providing any additional parts needed to make the systems fully operational. Parts supplied by the government are identified in Appendix B. In addition the government will supply utilities.

4. GENERAL INFORMATION.

4.1 QUALITY CONTROL. The Contractor shall utilize their own internal Quality Control (QC) processes to ensure the government receives quality services. If the COR annotates recurring unsatisfactory performance, they may request the Contractor’s QC plan to ensure that it is sufficient for the required services.

4.2 QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

4.3 Hours of Operation. The Contractor shall work during normal operating hours of 7:30 AM – 4:30 PM, Monday through Friday, excluding Federal holidays. If the Contractor wants to work other than normal operating hours, approval from the Contracting Officer must be obtained via a written request (email is acceptable) submitted at least two days prior to the date the work is to occur. The following Federal Holidays are observed:

January 1New Year’s Day
3rd Monday in JanuaryMartin Luther King, Jr. Day
3rd Monday in FebruaryPresident’s Day
Last Monday in MayMemorial Day
July 4Independence Day
1st Monday in SeptemberLabor Day
2nd Monday in OctoberColumbus Day
November 11Veterans Day
4th Thursday in NovemberThanksgiving Day
December 25Christmas

4.4. Access through the base entry gates may be delayed due to heavy vehicular traffic, exercises, or real-world emergencies.

4.5. The contractor shall not block the entry/exit doors to buildings during the course of their work. All contractor personnel shall not park in designated Reserved Parking spaces.

4.6. The Contractor shall comply, and assure any and all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, on site, Material Safety Data Sheets (MSDS) for all chemicals used. A copy of all MSDS shall be provided to the CO/COR. The MSDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility. The Contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the CO/COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.

4.6.1 In the event the Contractor comes upon hazardous materials (asbestos/lead based paint), that is beyond the contractor’s ability to deal with, the Contractor shall immediately stop work and contact the COR for further instructions.

4.7 CONTINUATION OF MISSION ESSENTIAL FUNCTIONS. IAW DoDI 1100.22 (Policy and Procedures for Determining Workforce Mix), and any applicable Air Force implementation, unless otherwise directed by an authorized Government representative, it is determined that this requirement is determined NOT mission essential during a crisis.

4.8. Period of Performance. The performance period shall not exceed 120 calendar days from the date of contract award.

Attachments:

Appendix A– Buildings that Require Loop Filtration System Appendix B- Government furnished materials Appendix C– Site Location Plans (to be provided to successful offeror)

APPENDIX A

BUILDINGS THAT REQUIRE LOOP FILTRATION SYSTEM INSTALLATION

Building
Quantity of LFS
Work Order #
Remarks
3
1
50877
Chilled Water Only
644
2
50929
716
2
50930
1012
1
50931
1019
1
50932
1204
2
50915
1256
1
50920
1258
1
50922
1354
2
50923
1712
2
50924
2005
1
50933
Chilled Water Only
2007
1
50934
Chilled Water Only
2036
1
50936
2040
2
50937
2048
2
50939
Hot Water Only
2060
2
50943
2065
1
50944
2071
2
50945
2075
1
50946
2080
1
50947
2090
2
50948
2096
2
50949
2097
2
50950
2115
1
50951
2125
2
50952
2140
2
50953
2185
2
50962
2249
3
50956
2258
2
50957
2259
2
50959
2380
2
50896
2392
2
50895
2393
2
50894
2447
2
50906
2451
2
50907
2465
2
50908
2500
1
50909
4400
3
50912

APPENDIX B

GOVERNMENT FURNISHED MATERIAL

Bldg 3

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 644

NOUN
CSL#
ITEM
Quantity
ELBOW
AA107C
2” BLK IRON 90 DEG
6
ELBOW
AA107S
¾” BLK IRON 90 DEG
2
NIPPLE
AA112D
¾” BLK IRON 2” LONG
1
NIPPLE
AA112J
¾” BLK IRON CLOSE
1
NIPPLE
AA113G
¾” BLK IRON 6” LONG
1
PIPE
AA115Z
2” 21’ long
2
FAUCET
AA118V
½” HOSE BIB
1
VALVE
AA128M
¾” BALL VALVE
2
VALVE
AC247I
½” BALL VALVE
2
WASHER
AC405R
FLAT 5/8” X-THK
1 BX
BOLT
AC423X
GRADE 5 HEX 5/8”
2
NUT
AC437M
HEX Z/P 5/8”
1 BX
WASHER
AC437T
LOCK Z/P 5/8”
1 BX
INSULATION
AC616S
FIBERGLASS 21/2”x1” ELBOW
10
ELBOW
AC619B
3” BLK IRON 90 DEG
12
ELBOW
AC619D
2 ½”” BLK IRON 90 DEG
6
REDUCER
AC619F
3” to 2 ½” BLK IRON THREADED
4
NIPPLE
AC619M
4” BLK IRON 6” LONG
2
NIPPLE
AC619N
3” BLK IRON PIPE 6”
12
TEE
AC658L
3” BLK IRON
4
FLANGE
AC658V
3” 4 BOLT
4
UNION
AC686K
2 ½” BLK IRON
2
VALVE
AC784R
3” BALL
6
ASSEMBLY
AC784T
ASSYMBLY
2
GASKET
AC787W
3” NON ASBESTOS
2
BUSHING
AC808H
3” to 2” REDUCER
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6
NIPPLE
AC876C
2 ½” BLK IRON PIPE CLOSE
8
INSULATION
AC887U
FIBERGLASS 21/2”x1” 3' LONG
15
INSULATION
AC887V
21/2”x1” TEE
2
TEE
AC887W
2 ½” BLK IRON
2
CAP
AC887X
2 ½” BLK IRON
1
PLUG
AC887Y
2 ½” BLK IRON
1

Bldg 716

NOUN
CSL#
ITEM
Quantity
UNION
AA009H
1 ½” BLK IRON
2
UNION
AA010T
2” BLK IRON
4
TEE
AA066C
1 ½” BLK IRON
4
ELBOW
AA106K
1 ½” BLK IRON 90 DEGREE
10
ELBOW
AA107C
2” BLK IRON 90 DEGREE
10
ELBOW
AA107S
¾” BLK IRON 90 DEGREE
4
NIPPLE
AA107T
1 ½” BLK IRON CLOSE
4
NIPPLE
AA108O
1 ½” BLK IRON 6” LONG
4
NIPPLE
AA111S
2” BLK IRON 6” LONG
4
NIPPLE
AA112D
¾” BLK IRON 2” LONG
2
NIPPLE
AA112J
¾” BLK IRON CLOSE
2
NIPPLE
AA113G
¾” BLK IRON 6” LONG
2
PIPE
AA115J
1 ½” BLK IRON 21’ LONG
1
PIPE
AA115Z
2” BLK IRON 21’ LONG
1
VALVE
AA128M
¾” BALL VALVE
4
NIPPLE
AA156A
1 ½” BLK IRON 21’ LONG
4
TEE
AB629R
2” BLK IRON
2
NIPPLE
AB661U
2” BLK IRON 4” LONG
4
NIPPLE
AB669D
2” BLK IRON CLOSE
4
VALVE
AC247J
2” BALL VALVE THREADED
3
BOLT
AC423X
GRADE 5 HEX 5/8”X3”
4
VALVE
AC429P
1 ½” BALL VALVE BRASS
5
NUT
AC437M
GRADE 5 HEX 5/8”
1 BX
WASHER
AC437T
5/8” LOCK Z/P 5/8”
1 BX
UNION
AC482D
1 ½’ DIELECTRIC SWT X FPT COPPER
2
ELBOW
AC619B
3” BLK IRON 90 DEGREE
11
NIPPLE
AC619N
3” BLK IRON 6” LONG
11
TEE
AC658L
3” BLK IRON
4
VALVE
AC782K
1 ½” CHK
2
ASSEMBLY
AC784T
FILTER ASSYMBLY
2
GASKET
AC787W
3” NON ASBESTOS
4
BUSHING
AC808H
3” TO 2” BLK IRON
2
UNION
AC832J
3” BLK IRON
6
BUSHING
AC876J
REDUCER 3” TO 1 ½”
2

Bldg 1012

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
6
NIPPLE
AC619N
3” BLK IRON 6” long
6
TEE
AC658L
3” BLK IRON THREADED
2
FLANGE
AC658V
3” 4 Bolt
2
ASSEMBLY
AC784T
Filter System
1
UNION
AC832J
3” BLK IRON
3

Bldg 1019

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
6
NIPPLE
AC619N
3” BLK IRON 6” long
6
TEE
AC658L
3” BLK IRON THREADED
2
FLANGE
AC658V
3” 4 Bolt
2
VALVE
AC784R
3” Ball Valve
3
ASSEMBLY
AC784T
Filter System
1
UNION
AC832J
3” BLK IRON
3

Bldg 1204

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 1256

NOUN
CSL#
ITEM
Quantity
NIPPLE
AC619N
3” BLK IRON 6” long
8
ASSEMBLY
AC784T
Filter System
1

Bldg 1258

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 1354

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 1712

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2005

NOUN
CSL#
ITEM
Quantity
ELBOW
AA106S
½” BLK IRON 90 DEG
4
PIPE
AA171V
3” BLK IRON STD W 21’
3
ELBOW
AC619B
3” BLK IRON 90 DEG
12
NIPPLE
AC619N
3” BLK IRON PIPE 6”
12
FLANGE
AC658V
3” 4 BOLT
4
VALVE
AC784R
3” BALL
6
ASSEMBLY
AC784T
ASSYMBLY
1
GASKET
AC787W
3” NON ASBESTOS
2
UNION
AC832I
3” DIELECTRIC SWEAT COPR/STEEL
10
UNION
AC832J
3” BLK IRON
6

Bldg 2007

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 2036

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 2040

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2048

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
18
NIPPLE
AC619N
3” BLK IRON 6” long
18
TEE
AC658L
3” BLK IRON THREADED
6
FLANGE
AC658V
3” 4 Bolt
6
VALVE
AC784R
3” BALL VALVE
7
ASSEMBLY
AC784T
Filter System
2
UNION
AC832J
3” BLK IRON
9

Bldg 2060

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2065

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 2071

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2075

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 2080

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
1

Bldg 2090

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
11
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
43
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
4
UNION
AC832J
3” BLK IRON
6

Bldg 2096

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2097

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
2
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2?
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2115

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” 90 degree
24
NIPPLE
AC619N
3” nipple 6” long
24
TEE
AC658L
3” threaded
8
FLANGE
AC658V
3” 4 Bolt
8
VALVE
AC784R
3” Ball Valve
12
ASSEMBLY
AC784T
Filter System
1

Bldg 2125

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2140

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
2

Bldg 2185

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
2

Bldg 2249

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
3

Bldg 2258

NOUN
CSL#
ITEM
Quantity
TEE
AA007Q
¾” BLK IRON PIPE
4
TAPE
AA065Y
TEFLON
20
ELBOW
AA106S
½” BLK IRON 90 DEG
4
NIPPLE
AA109G
½” BLK IRON PIPE CLOSE
4
NIPPLE
AA109U
½” BLK IRON PIPE 2”
2
NIPPLE
AA110C
½” BLK IRON PIPE 6”
2
PIPE
AA115Z
2” 21’ long
2
FAUCET
AA118V
½” HOSE BIB
1
VALVE
AC247I
½” BALL VALVE
2
VENT
AC408J
AIR 3/4M X ½” BRASS
2
INSULATION
AC616S
FIBERGLASS 21/2”x1” ELBOW
4
ELBOW
AC619B
3” BLK IRON 90 DEG
12
NIPPLE
AC619N
3” BLK IRON PIPE 6”
12
TAPE
AC619O
INSULATION 3”X150’
1
TEE
AC658L
3” BLK IRON
4
FLANGE
AC658V
3” 4 BOLT
4
REDUCER
AC658Y
3” to 2” BLK IRON
2
VALVE
AC697U
2 ½” BALL
4
VALVE
AC784R
3” BALL
6
ASSEMBLY
AC784T
ASSYMBLY
2
GASKET
AC787W
3” NON ASBESTOS
2
ELBOW
AC789L
2 ½” BLK IRON 90 DEG
4
GASKET
AC823Y
2 ½” VICTAULIC
5
UNION
AC832J
3” BLK IRON
6
NIPPLE
AC876C
2 ½” BLK IRON PIPE CLOSE
8
INSULATION
AC887U
FIBERGLASS 21/2”x1” 3' LONG
15
INSULATION
AC887V
21/2”x1” TEE
2
TEE
AC887W
2 ½” BLK IRON
2
BUSHING
AC898G
REDUCER 3” to 2 ½” BLK IRON
2
ELBOW
AC904F
2 ½” BLK IRON 45 DEGREE
4

Bldg 2259

NOUN
CSL#
ITEM
Quantity
TEE
AA007Q
¾” BLK IRON PIPE
4
TAPE
AA065Y
TEFLON
20
NIPPLE
AA109G
½” BLK IRON PIPE CLOSE
4
NIPPLE
AA109U
½” BLK IRON PIPE 2”
2
NIPPLE
AA110C
½” BLK IRON PIPE 6”
2
PIPE
AA115Z
2” 21’ long
2
FAUCET
AA118V
½” HOSE BIB
1
VALVE
AC247I
½” BALL VALVE
2
VENT
AC408J
AIR 3/4M X ½” BRASS
2
INSULATION
AC616S
FIBERGLASS 21/2”x1” ELBOW
4
ELBOW
AC619B
3” BLK IRON 90 DEG
12
NIPPLE
AC619N
3” BLK IRON PIPE 6”
12
TAPE
AC619O
INSULATION 3”X150’
1
ASSEMBLY
AC784T
ASSYMBLY
2
GASKET
AC787W
3” NON ASBESTOS
2
GASKET
AC823Y
2 ½” VICTAULIC
5
INSULATION
AC887U
FIBERGLASS 21/2”x1” 3' LONG
15
INSULATION
AC887V
21/2”x1” TEE
2
BUSHING
AC898G
REDUCER 3” to 2 ½” BLK IRON
2

Bldg 2380

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
4
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
8
UNION
AC832J
3” BLK IRON
3

Bldg 2392

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
9
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
4
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
8
UNION
AC832J
3” BLK IRON
4

Bldg 2393

NOUN
CSL#
ITEM
Quantity
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
3
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2447

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
3
VALVE
AC784R
3” BALL VALVE
10
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
6

Bldg 2451

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
3
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
4

Bldg 2465

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
12
NIPPLE
AC619N
3” BLK IRON 6” long
12
TEE
AC658L
3” BLK IRON THREADED
3
FLANGE
AC658V
3” 4 Bolt
3
VALVE
AC784R
3” BALL VALVE
6
ASSEMBLY
AC784T
Filter System
2
UNION
AC832I
3” DIELECTRIC
10
UNION
AC832J
3” BLK IRON
4

Bldg 2500

NOUN
CSL#
ITEM
Quantity
ELBOW
AC619B
3” BLK IRON 90 DEGREE
6
NIPPLE
AC619N
3” BLK IRON 6” long
4
TEE
AC658L
3” BLK IRON THREADED
2
FLANGE
AC658V
3” 4 Bolt
2
VALVE
AC784R
3” BALL VALVE
3
ASSEMBLY
AC784T
Filter System
1
UNION
AC832J
3” BLK IRON
1

Bldg 4400

NOUN
CSL#
ITEM
Quantity
ASSEMBLY
AC784T
Filter System
3

Appendix C. Site Location Plans (to be provided to successful offeror)

File details come from the government source that posted it. Updated .