This document is a Contractor Questions & Government Answers file for a CATM (Close Air Target Maintenance) Cleaning Service. The cleaning requirement involves a total of 18,104 sq. ft. of range space, with a one-time cleaning anticipated between 24-26 September 2025. Key details include: no incumbent contractor, with similar services previously performed under contract FA461322C0005; no target holders or filters require cleaning; and the cleaning involves frangible ammunition residue composed of compressed Copper, Zinc, Tin, Tungsten, and a Polymer Binder.

Notable technical details include contractor responsibilities for manual auger plate removal and damage repair, and an unresolved question about surface sampling thresholds (40 micrograms/sf) which will be addressed in Amendment 2 on 15 September. The solicitation due date has been amended to 16 September to accommodate clarification. The cleaning will involve a space where lead ammunition has been used, and the frangible ammunition is designed to disintegrate upon impact with hard surfaces. Images of a drain gate are provided with the document, showing a metal-covered access point with debris inside.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CATM Cleaning Service

Contractor Questions & Government Answers

Question 1. What is the total square footage of the space that will require cleaning?

The total square footage of the range is 18,104 sq. ft

Question 2. Are any as-builts available?

As-Builts are unavailable at this time; however, the auger’s part & serial numbers are:

SK: 3282SC-100L/4 CUS

SN: /800940645700 003

Question 3. Will the Government drop the auger if manual removal of material within the auger is necessary?

If manual removal is necessary, the contractor is responsible for dropping auger plates. If any damage occurs during the process of dropping the plates/ cleaning, the contractor is responsible for repairing all damages at no additional cost to the government.

Question 4. How many target holders are there that will require cleaning?

IAW the PWS, the target holders do not require cleaning at this time.

Question 5. Will the replacement of filters be included in the contract?

No filters will need to be cleaned or replaced for this cleaning.

Question 6. Will swipe surface sampling need to be conducted on all horizontal surfaces or only from the floor. Is the successful post-cleaning threshold of 40 micrograms/sf applicable at all locations? This is likely not achievable given the use of lead ammunition where porous floor surfaces exist.

Technical experts are currently not available to answer this question. Amendment 2 will be posted on 15 Sept to provide clarification. The solicitation due date has also been amended to 16 Sept to accommodate for the delay.

Question 7. What is the anticipated start date?

The anticipated start date for this requirement is between 24-26 September 2025.

Question 8. Can a picture be provided of the drain gate?

Please see below for pictures of the drain gate.

Question 9. Who is the incumbent?

Currently, there is not an incumbent; however, similar services have been performed (please see question 10).

Question 10. What was the previous contract?

Although services requested are not identical, similar services were performed on contract: FA461322C0005

Question 11. Is this a one-time cleaning of the CATM range? If not, what is the cleaning frequency?

This requirement is for the one time cleaning of the CATM range.

Question 12. What types of metals are included in the frangible rounds?

Frangible Ammunitions is made up of compressed Copper, Zinc, Tin, Tungsten and a Polymer Binder and designed to disintegrate upon impact with a hard surface.

Attachment 6- Government Q&A
CATM Drain Gate1
CATM Drain Gate2
CATM Drain Gate3
CATM Drain Gate4

File details come from the government source that posted it. Updated .