Attachment 5 - Site Visit Attendence.pdf

PDF 10 MB Posted

Attached to
PKAA - ATS Replacement & Disconnection (Service)
Solicitation number
FA461325Q0026
Issued by

About this file

This is a Performance Work Statement (PWS) for replacing Automatic Transfer Switches (ATS) and disconnects in three buildings at F.E. Warren Air Force Base, Wyoming. The project involves removing existing ATS units in Buildings 34, 363, and 1284 and installing new transfer switches with specific technical requirements, including voltage, amperage, and pole specifications for each building. The contractor must complete the work within 120 calendar days, with installation coordinated with the government facility manager and completed in phases to allow personnel relocation.

Key performance objectives include zero deficiencies during demolition and installation, proper equipment disposal, minimal blackout time during switch replacement, and compliance with safety standards. The contractor is responsible for testing the new ATS units, ensuring operational integrity, and following National Electric Code safety procedures. Additional requirements include submitting a safety and health plan, maintaining physical and personnel security, and adhering to environmental and anti-terrorism protocols. The solicitation is set aside for small businesses, with questions due by September 23, 2025, and quotes due by September 29, 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .