This document is a set of Questions and Answers related to a federal contract opportunity for a 10 Channel UHF Repeater at F.E. Warren AFB. The key details are:
The contract opportunity is a Firm Fixed-Price contract for a "turnkey" Project 25 compliant Enterprise Land Mobile Radio (ELMR) upgrade from 5 VHF channels to 10 UHF channels. This includes antennas, new radio equipment, installation of a 90' self-supporting tower, and an uninterruptible power supply. The contractor will provide all design, installation, configuration, testing, training, and warranty services.
The contract has a 210-day period of performance (180 days for materials, 30 days for project completion). Quotes are due by 2pm Mountain Time on September 3, 2024. A site visit is scheduled for August 22, 2024. The procurement is a 100% small business set-aside with a NAICS code of 517111. Award will be made to the lowest-priced technically acceptable offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1a Provisions and Clauses.pdf | ||
| Attachment 4 UPDATED SOO 5 SEP 2024.pdf | ||
| Attachment 3 UPDATED Response Form.pdf | ||
| Attachment 1 UPDATED Provisions and Clauses.pdf | ||
| Attachment 4 Updated Statement of Objectives 29 August 2024.pdf | ||
| Attachment 7 - Seed Mix.pdf | ||
| Attachment 5 - Wage Determination.pdf | ||
| Attachment 2 - Additional clauses.pdf | ||
| Attachment 3 Response Form.pdf | ||
| Attachment 4 - Statement of Objectives 7 August 2024.pdf | ||
| Attachment 1 - Provisions and Clauses.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
10 Channel UHF Repeater
28 August 2024
1. What is the tower distance from the building?
a. 50’
2. Type of tower to be used?
a. Composite Pole with internal grounding and Transmission Line feeds.
3. Is there tower lighting?
a. No
4. Are we doing anything for access road like laying gravel?
a. Not required for this project.
5. What are the testing requirements?
a. Optimize all RF equipment after system installation to ensure optimal performance and reliability. Time and synchronize the network among the dispatch consoles, the management terminals, and the RF site to ensure maximum system reliability.
6. Are installing a fence – what size?
a. Fence is not required for Composite Pole.
7. Soil/Ground Remediation?
a. Spread topsoil and replant with native grasses, attached is our seed mix (See Attachment 7).
8. Spoils – Spread on site or removed?
a. Slope to grade and spread on site; match existing grade
9. Frequency pairs?
a. Provided upon contract award
10. Who is responsible for soil testing?
11. Environmental study? – Who is responsible?