Attachment 1 - PWS 10 Sept 2025.pdf

PDF 221 KB Posted

Attached to
Traffic Light Control Panel Replacement
Solicitation number
FA46132425Q0020
Issued by

About this file

This Performance Work Statement (PWS) details a contract for Traffic Light Control Panels replacement at F.E. Warren Air Force Base in Cheyenne, Wyoming, scheduled for September 2025. The project involves replacing/updating major components in traffic control cabinets at four intersections, including replacing outdated system elements such as Malfunction Management Units, Load Switches, Flashers, Bus Interface Units, and other critical infrastructure. The contractor will be responsible for procuring, delivering, and installing new components, ensuring compatibility with the existing Yunex system, and providing initial training to approximately 10 base personnel.

Key requirements include maintaining traffic flow during the project, submitting a temporary traffic control plan if needed, and providing materials and one-year workmanship warranties. The work will be performed Monday through Friday from 0730-1630 hours, with components selected to address existing system limitations, particularly cold temperature performance issues. The contractor must adhere to strict security, operational security (OPSEC), and safety requirements, and use environmentally sustainable products where possible. The project aims to update the base's aging traffic control infrastructure while ensuring minimal disruption to base operations.

View the file

Other files

File Type Posted
Solicitation - FA461325Q0020.pdf PDF
Attachment 2 - Vendor Confirmation Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

Traffic Light Control Panels Replacement

F.E. Warren Air Force Base, Wyoming

10 Sept 2025

Table of Contents

1. Description of Services

1.1. Basic Services

2. Services Summary

3. Government Furnished Property and/or Services

3.1. Government Furnished Property

3.2. Government Furnished Services

3.3. Government Property Incidental to the Place of Performance

4. General Information

4.1. Quality Control

4.2. Security Requirements

4.3. Operational Security (OPSEC)

4.4. Anti-Terrorism

4.5. Location/Hours of Operation

4.6. Safety Requirements

4.7. Privatized Utility Systems

4.8. Contractor Personnel

1. Description of Services.

The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform Traffic Light Control Panels replacement services at F.E. Warren Air Force Base, Wyoming, in accordance with all applicable federal, state, local laws and regulations and this performance work statement (PWS).

1.1. Basic Services. Contractor will be responsible for replacing/updating all major components within existing traffic control cabinets at (4) intersections at FE Warren Air Force Base in Cheyenne, WY.

Intersection locations are listed in Table 1 of section 4.5.3. The contractor shall procure, deliver, install, and provide initial training to approximately 10 F.E. Warren AFB designated personnel regarding basic system functions, operation, and maintenance including changing/replacing filters, maintenance schedule, and troubleshooting. Training must be completed prior to the contract end/acceptance of the project and is to include Electric Shop personal. Review of existing system indicates that most components are 20-30 years old. Current system is Yunex for all major components. Current system functions but is at the end of its service life and 2 intersections have issues with cold temperatures causing signal failure. Components to be replaced in each (4) cabinets include but are not limited to, the following:

• Malfunction Management Unit (to replace existing conflict monitors)

• Load Switch

• Flashers

• Bus Interface Units

• Flash Transfer Relays

• Exhaust fans

• Uninterrupted Power Supply (UPS) - must be capable of operating intersection in 4 way flashing configuration for a minimum of 12 hours

• Replace mercury contact switches with Solid State Drive (SSD) components

• Supply padlocks (all keyed alike) for each cabinet

• Update/replace existing pedestrian signage at each intersection to reflect most recent Manual on Uniform Traffic Control Devices (MUTCD) standards

All new/replacement components must be compatible with other existing parts of traffic control system.

No work on existing traffic lights/poles is anticipated as part of this contract. Contractor must maintain traffic flow through all intersections throughout duration of the project. If component replacement will require temporary disconnection of traffic lights, a temporary traffic control plan must be submitted to the project manager and approved by security forces prior to implementation.

The contractor shall provide materials warranties and one (1) year workmanship warranties as a specified for the equipment included. The warranty shall include all labor and material coverage against equipment and components.

2. Services Summary.

The contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance Objective to be met, service delivery must be in substantial compliance with applicable performance standards. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor

Quality Control is unacceptable. The following is a list of the key performance objectives that will be verified as contractually compliant by Government personnel; however, inspection of any contract requirement is authorized.

Performance Objective PWS Para. Performance Threshold Method of Surveillance

SS-1: Replace/update all major components within existing traffic control cabinets at four intersections

1.1 Zero deficiencies. System

operates without errors.

100% Inspection

SS-2: Provide initial training to designated personnel.

1.1 Zero deficiencies. Initial training

is scheduled/performed IAW

PWS.

Customer Feedback

3. Government Furnished Property and/or Services

3.1. Government Furnished Property.

3.1.1. None

3.2. Government Furnished Services.

3.2.1. Utilities. The Government will furnish the electricity, water, and sewage services (as necessary) for the accomplishment of service IAW this PWS.

3.3. Government Property Incidental to the Place of Performance.

3.3.1. None

4. General Information.

4.1. Quality Control.

The contractor is required to control the quality-of-service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services Summary.

4.2. Security Requirements.

The contractor shall be responsible for all passes issued to their employees under this contract.

Applications shall be coordinated by the Contracting Officer or designated representative. At the time of application, Security Forces will conduct a background check on employees. Upon termination of employment or contract completion, the contractor shall be responsible for returning identification cards/base passes to Security Forces within 24 hours.

4.2.1. REAL ID-Compliant Identification.

IAW DoDM 5200.08V3_DAFMAN 31-101V3_DAFGM 2024-01, Installation Perimeter Access

Control. Base access and Common Access Cards (CAC) requests will require REAL ID-Compliant identification for Base access and CAC creation. Failure of the vendor to ensure personnel have REAL ID-compliant identification will result in denial of Base access and CAC requests.

4.2.2 Physical Security. At the close of each workday, Government facilities, property, and materials shall be secured. All building access points shall be closed at the end of each shift.

Contractors will be allowed to store tools and materials in a single bay for the duration of the project.

4.3. Operational Security (OPSEC).

The contractor shall adhere to the following minimum requirements in support of this requirement:

4.3.1. All contractors, subcontractors, their employees, associates, and consultants who have access to critical information and indicators must comply with the Air Force-sponsored Operations Security (OPSEC) program.

4.3.2. OPSEC is an information-related capability that preserves friendly essential secrecy by using a process to identify, control, and protect critical information and indicators. If critical information and indicators are disclosed, it could allow adversaries or potential adversaries to identify and exploit friendly vulnerabilities leading to increased risk to mission failure or the loss of life. The desired effect of OPSEC is to influence the adversary’s behavior and actions by reducing the adversary’s ability to collect and exploit critical information and indicators about friendly activities.

4.3.3. Responsibilities:

4.3.3.1. Contractors must ensure employees receive OPSEC education that includes an overview of the OPSEC process, the definition of OPSEC, its purpose, what is critical information, the individual’s role in protecting critical information, and the general adversary threat to the AF’s critical information.

Additionally, OPSEC education must include updated threat information, changes to critical information and indicators, new procedures and/or OPSEC measures implemented, altered, or deleted by the organization.

4.3.3.2. DoD Contractors with OPSEC requirements or that have access to critical information and indicators shall complete initial and annually-recurring refresher training. Accomplishment of initial OPSEC training must not exceed 90 days from initial assignment to a contract with OPSEC requirements.

Access to mission-critical information will not be allowed until OPSEC education has been completed and documented.

4.3.3.3. OPSEC education is a continuous requirement. The host unit OPSEC coordinator must track OPSEC training statistics to include the personnel working on the contract, when each individual received the required initial OPSEC training, and when refresher training is due and/or completed.

4.3.4. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Controlled unclassified information (CUI) may only be transmitted as directed in this PWS.

4.3.5. The Contractor shall not post to company websites, publications, newsletters, or other media any images, data, or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the COR or CO, as applicable.

4.3.6. Prior to seeking approval through the F. E. Warren AFB Public Affairs, any information to be released outside of official U.S. Government channels, via any media (to include electronic communications), must be approved through an OPSEC review. All personnel must promptly report OPSEC-related incidents, issues, and concerns to the host-unit OPSEC coordinator.

4.3.7. Contractor shall restrict access to those individuals with a valid need-to-know who are actually providing services under the contract. Further dissemination to other contractors, subcontractors, or other government agencies and private individuals or organizations is prohibited unless authorized in writing.

4.3.8. Because observation of events, operations, physical changes, etc., may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793. Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data/information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:

4.3.8.1. Tactics, techniques, and procedures, production, or work schedules, any visible or concealed modifications, upgrades, additions to vessels, aircraft, or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, vehicle, vessel, or aircraft movements; specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the COR or CO, as applicable.

4.3.8.2. Government issued badges, identification shall be removed and/or concealed from plain sight when off base and shall not be left in vehicles or unprotected areas. Badges and passes may not be duplicated, copied, or loaned to others. Lost or stolen identification badges, vehicle passes, etc., will be immediately reported to the COR, CO, and/or Installation Security Office.

4.4. Anti-Terrorism

4.4.1. Notification: If the Contractor (contract employees/subcontractors) identify any suspicious activity, they shall contact the Base Defense Operations Center (BDOC) at 307-773-3501 (On-installation)/Missile Security Control (MSC) at 307-773-2701 (Off-installation) and notify the CO and COR (if appointed) that they contacted the BDOC and/or MSC.

4.4.2. Training. Contractor employees that require routine physical access to a Federally-controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter and send a copy of their employees’ training certificate(s) to the CO and COR (if assigned). Training is located at Joint Knowledge Online (JKO) website:

https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf

4.5. Location/Hours of Operation.

4.5.1. Location. Place of performance is at FE Warren AFB WY. Telework shall not be permitted for this task order/contract.

4.5.2. Normal Hours of Operation. The contractor shall perform the services required under this contract during the hours listed within Table 1, Location and Hours of Work. The contractor may work (with prior approval of the CO) extended hours to ensure timely completion of work at no additional cost to the Government.

4.5.3. Recognized Holidays. The contractor is not required to provide service on the following days, unless otherwise noted:

• New Year's Day (January 1).

• Birthday of Martin Luther King, Jr. (Third Monday in January).

• Washington's Birthday (Third Monday in February).

• Memorial Day (Last Monday in May).

• Juneteenth National Independence Day (June 19).

• Independence Day (July 4).

• Labor Day (First Monday in September).

• Columbus Day (Second Monday in October).

• Veterans Day (November 11).

• Thanksgiving Day (Fourth Thursday in November).

• Christmas Day (December 25).

If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

Table 1. Location and Hours of Work

Name of Intersection Days Time

Randall Avenue & Rogers Road Monday - Friday 0730 – 1630 hrs

Randall Avenue & Old Glory Road Monday – Friday 0730 – 1630 hrs

Randall Avenue & Schiever Road Monday – Friday 0730 – 1630 hrs

Old Glory Road & Missile Drive Monday – Friday 0730 – 1630 hrs

4.5.4. Emergency Services. On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above. The project areas will be actively in use by civilians and base throughout the duration of this project.

4.5.4.1. The project site is subject to fire and safety inspections without notice. Any violation of fire and safety standards may result in work stoppage.

4.5.4.2. In case of an emergency, the Base Fire Department, Security Forces, or their representative shall have the authority to order the contractor to terminate work and clear the area of personnel and equipment. Then contractor shall comply to an order with all possible speed.

4.5.5. Green Procurement Program (GPP). In performance of this contract, contractors shall use Environmental Protection Agency (EPA) designated recycled content products, Information Technology (IT) Energy Star products/appliances, Federal Energy Management Program (FEMP) Designated Energy Efficient Low Stand By Power products/appliances, U.S. Department of Agriculture (USDA) Bio based/Bio preferred products, Environmentally preferable products, Electronic Product Environmental Assessment Tool (EPEAT) registered products, Water Sense or other water efficient products, non- or Low Ozone depleting substances under the Significant New Alternatives Policy (SNAP), non or Low toxic or hazardous constituents (e.g. non-VOC paint) and any other environmentally sustainable product/method, to the greatest extent possible.

4.5.5.1 Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the F.E. Warren AFB Fire Dept at 911 (landline) or 307-773-2931 (cell phone). The liability for the spill or release of such substance(s) rests solely with the contractor and its agent.

4.5.5.2 Hazardous Material (HM). If hazardous materials will be used in the execution of this contract, the contractor shall comply with all federal, state and local regulations concerning the use, storage, and reporting of HM in accordance with DAFMAN 32-7002, Environmental Compliance and Pollution Prevention. The contractor shall be required to obtain authorization per the Installation Hazardous Materials Management Program before ordering or purchasing any hazardous product and may not bring a HM onto F.E. Warren AFB property, nor use a HM, until the contractor receives all required authorizations. This authorization process may take up to three weeks. The contractor shall provide the information listed in Attachment 1 of Section 01 57 19.05 32 to request authorization for all hazardous materials proposed for use on FE Warren AFB or the missile field.

4.6. Safety Requirements.

4.6.1. In performing work under this contract, the contractor shall:

4.6.1.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.6.1.3. Record and report promptly (within one hour), to the contracting officer or designated COR, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.

4.6.1.4. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.

4.7. Privatized Utility Systems.

4.7.1. The electrical distribution utility system at F.E. Warren Air Force Base has been sold to High West

Energy (“System Owner”) as part of the USAF Utilities Privatization (UP) effort. Therefore, the System Owner is the sole provider of these utility services to the installation and should be viewed just like any other local utility Contractor.

4.7.2. Newly installed system infrastructure and modifications of (or connections to) existing system infrastructure identified in the specifications and drawings must be coordinated with the System Owner prior to the contract start date. The System Owner must be integrated into the design, inspection of construction, tie-in to existing utilities, and conveyance of any exterior utilities. The preferred process for connecting facilities is to request that the System Owner install the required connecting facilities, up to a point of demarcation to be identified by the Government, as a connection charge. However, if a connection charge cannot be negotiated, work may be accomplished by the Prime Construction Contractor and later connected to the System Owner’s system, provided that the System Owner’s connection criteria, as set forth in its utility services contract with the Government, are met. Any fees associated with connecting Contractor constructed infrastructure to the System Owner’s system must be negotiated with the System Owner. All work on the system or facilities expected to connect to the system shall comply with the System Owner’s specifications and construction standards.

In no event shall the Contractor cap, connect to, or otherwise touch the System Owner’s infrastructure without the System Owner’s express written permission. This also applies in the event of a utility strike involving the System Owner’s infrastructure.

4.7.3. System Owner Office Hours:

• Monday thru Thursday, 7:30am – 5:00pm MST

4.7.4. If the Contractor requests the System Owner’s efforts outside of the above identified business hours, additional costs may be incurred by the Contractor due to the scheduling of the request.

For a non-emergency, the System Owner may be contacted at:

• Project Manager, Carl Whispell o 307-773-2017

For emergencies or utility strikes involving the System Owner’s infrastructure, please follow standard procedures identified on the Dig Permit Request Checklist.

4.8. Contractor Personnel.

4.8.1. Contract Manager: the contractor shall provide a contract manager who shall be responsible for the performance of the services. The name of the contract manager shall be provided to the CO in writing prior to the beginning of the first performance period. The contract manager must be able to read, write, speak, and understand English.

4.8.1.1 The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.

4.8.2. Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

4.8.2.1. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.

1. Description of Services.
2. Services Summary.
3. Government Furnished Property and/or Services
3.1. Government Furnished Property.
3.2. Government Furnished Services.
3.3. Government Property Incidental to the Place of Performance.
4. General Information.
4.1. Quality Control.
4.3.1. All contractors, subcontractors, their employees, associates, and consultants who have access to critical information and indicators must comply with the Air Force-sponsored Operations Security (OPSEC) program.
4.4. Anti-Terrorism
4.5. Location/Hours of Operation.
4.6. Safety Requirements.
4.8. Contractor Personnel.

File details come from the government source that posted it. Updated .