Attachment 1 - Performance Work Statement.pdf
PDF 2 MB Posted
- Attached to
- 90 CS Premise Wiring Upgrade Federal contract opportunity
- Solicitation number
- FA461322Q1033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Provisions and Clauses.pdf | ||
| Combine Synopsis Solicitation.pdf | ||
| Attachment 2 - TIC Handbook 2022.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 6 - Questions and Answers Govt Responses Part 1.pdf | ||
| Attachment 7 - Questions and Answers Govt Responses Part 2.pdf | ||
| Questions and Answers - Govt Responses Part 1.pdf | ||
| Attachment 5 - Provisions and Clauses.pdf | ||
| Attachment 1 - Performance Work Statement.pdf | ||
| Attachment 2 - TIC Handbook 2022.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 4 - Site Visit Agenda.pdf | ||
| Combine Synopsis Solicitation.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
90 CS PREMISE WIRING UPGRADE
SERVICE
F.E. Warren Air Force Base, Wyoming
06 September 2022
[NOTE: table of contents populates based upon the font “Styles” feature in Word. For example, “1” is associated with Heading 1; “1.1, 1.2, 1.3” are associated with Heading 2. When adding any paragraphs to those levels, be sure to click the applicable style (i.e. Heading 1, 2, or 3)]
RFQ FA461322Q1033
Attachment 1
Table of Contents
1. Description of Services
1.1. Basic Services
1.2. Testing, Drawings, and Acceptance
1.3. Deliverables Table
2. Services Summary
3. Government Furnished Property and/or Services
3.1. Government Furnished Property
3.2. Government Furnished Services
3.3. Government Property Incidental to the Place of Performance
4. General Information
4.1. Quality Control
4.2. Quality Assurance
4.3. Security Requirements
4.4. Operational Security (OPSEC)
4.5. Location/Hours of Operation
4.6. Conservation of Utilities
4.7. Environmental Controls
4.8. Safety Requirements
4.9. Contractor Personnel
4.10. Records
5. Appendices
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
1. Description of Services.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform cable replacement services at F.E. Warren Air Force Base, Wyoming, in accordance with the 90th Telecommunications Installation Criteria Handbook (TIC) where applicable, and applicable federal, state, local laws and regulations and this performance work statement (PWS). Appendix D contains a list of documents reference in this PWS or are hereby recognized as a standard of good practice to follow during the performance of all work.
1.1. Basic Services. The contractor shall remove Category 5 (CAT 5) or older cables that run from the Main
Communications Equipment Room (CER) to each communication jack and replace with new Category 6 (CAT
6) cables. Additional work will include but is not limited to install faceplates, patch panel(s), cable management, terminations, labeling, and any other work as identified in this PWS.
1.1.1. Cable Management. The contractor shall use existing cable pathways where there are no defects to the support system and cable fill will not exceed the 40% rule as stipulated in the National Electrical Code (NFPA 70). If new cable pathways need to be installed the contractor will use the most direct route available and adhere to the TIC standards of installation (TIC page 4). All cable pathways, currently existing or newly installed, will be secured per TIC standards.
1.1.2. Cable Replacement. The contractor shall remove current cables that run from the CER to each communication jack and replace with new CAT 6 cable. Each communication jack in a duplex outlet will have two CAT 6 cables, one for Voice and one for Data and each quad‐plex outlet will have four CAT 6 cables, two for Voice and two for Data. Each cable run shall be a continuous individual cable from the communication jack to the CER (TIC page 2). The cable jacket for Voice shall be white in color and the LAN cable jacket shall be blue in color. The CAT 6 cable shall be labeled (TIC page 7) and meet the technical specifications (TIC page 2) of the TIC.
1.1.3. Faceplate Installation. All existing outlet faceplates will be removed and replaced, like for like, with a new duplex or quad‐plex faceplate, unless otherwise approved by 90 CS. The faceplate color will be the same as the buildings existing faceplate color, white or ivory. The faceplate shall be able to comply with the labeling requirements (TIC page 8). The faceplates shall be labelled as per the TIC labeling requirements (TIC page 8).
The bezel color for Voice will be white and LAN will be green.
1.1.4. Jack Assembly Termination. The contractor will use CAT 6 RJ45 jack assembly. The jack assembly will meet the RJ45 Pinout T‐568B standard (TIC page 9), see Appendix A for diagram.
1.1.5. Patch Panel Installation. The contractor shall install new CAT 6 patch panel with 110 interface in the CER rack. The patch panel shall have a minimum of 24 ports and shall have at least 12 spare ports after all cables are connected. The contractor shall make the connections to each port. Each jack from a communication jack outlet shall be terminated on the same patch panel in consecutive order (White first, then Blue corresponding) (TIC page 5), see Appendix B for diagram. The patch panel shall be labelled as per the TIC labeling requirements (TIC page 7).
1.1.6. Workplace Condition. The workplace shall be clean of all debris and restored to original or better condition.
1.1.7. Drop Ceiling Panels. The Contractor shall be responsible for replacing ceiling panels that are damaged by contractor personnel.
1.1.8. Service Outages. The Contractor shall coordinate planned outages with the site POC at least 7 calendar days in advance of the outage if the implementation necessitates disruption of service, (e.g., communications, electrical, or other utilities). The Contractor shall be responsible for preventing any unscheduled outages (i.e. cutting or disabling any in‐service cables or equipment).
1.2. Testing, Drawings, and Acceptance.
1.2.1. Contractor Testing. The Contractor shall certify and test all telecommunication cable as required (TIC page 6). A copy of the results shall be provided to the 90 CS Project Manager using common electronic software (i.e. PDF, Word, etc.). The Contractor shall make all corrective actions discovered upon testing to bring any deficiencies up to compliance as specified (TIC page 6).
1.2.2. Drawings. The Contractor shall provide drawings reflecting “AS‐BUILT” conditions to 90 CS with the cable certification records. These shall include overall routing of new cable and butterfly drawings of each communication conduit used indicating entry and exit of the installed cabling in those conduits, as well items identified in the TIC (TIC page 7). The final drawings will be provided to 90 CS prior to the final acceptance of the work to perform final review of drawings and inspect installation (TIC page 6 and 7).
1.2.3. Acceptance. The Government will review the Contractor’s installation to ensure all PWS requirements are met and all required items were complied with.
1.3. Deliverables Table
Deliverable Requirement
Contract Manager Information Within 3 days of contract award
Preliminary Schedule Within 7 days of contract award
Project Plan Within 14 days of contract award
Project start date Within 90 days of contract award
Project completion date Within 60 days of project start date
Contract Personnel List No later than 14 days before project start date
Strand test results Upon project completion
As‐Built Package Upon project completion
2. Services Summary.
The contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance Objective to be met, service delivery must be in substantial compliance with applicable performance standards. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor Quality Control is unacceptable. The following is a list of the key performance objectives that will be verified as contractually compliant by Government personnel; however, inspection of any contract requirement is authorized.
Performance Objective
PWS
Para.
Performance Threshold Percent Method of
Surveillance
Adhere to all Service Installation Standards and Requirements as identified or reference
1.2.3.
Any deviation from standard must be approved by 90 CS.
100% Random Inspections Final walkthrough
CAT 6 Cable Test 1.2.1. 100% Functionality 100% Provide Strand Test Results
Deliverables 1.3. 100% Timely Reporting 100%
3. Government Furnished Property and/or Services
3.1. Government Furnished Property.
3.1.1. None
3.2. Government Furnished Services.
3.2.1. None
3.3. Government Property Incidental to the Place of Performance.
3.3.1. None
4. General Information.
4.1. Quality Control.
The contractor is required to control the quality of service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services Summary.
4.2. Quality Assurance
The Government will evaluate the contractor’s performance by monitoring the contractor’s performance to ensure services are received. The Government will evaluate the contractor’s performance through on‐site inspections and receipt of customer complaints. The Government will inspect each task as completed. The Government will investigate complaints received from customers. The Government shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s). Remedies for non‐conforming services will be resolved IAW the applicable Inspection/Acceptance clause attached within the contract.
4.2.1. The services to be performed by the contractor during the period of this contract shall (at all times and places) be subject to review by the Contracting Officer or authorized representative(s).
4.3. Security Requirements.
The Government will provide the contractor with access to the buildings necessary to perform the work under this PWS. The contractor shall be subject to all Department of Defense rules and regulations while working on this military installation. The contractor shall provide all necessary personnel information for base access to the Government Project manager at least 14 days prior to beginning work.
4.3.1. Personnel Information. The Contractor shall submit a written request on company letterhead to the
Project Manager listing the following: contract number, location of work site, start and stop dates, and names of contractor personnel needing access to the base. When reporting to the registration office, the authorized Contractor personnel must provide a valid driver’s license for each individual and valid vehicle insurance certificate or rental agreement for each vehicle, to obtain access to the base.
4.4. Operational Security (OPSEC).
The contractor shall adhere to the following minimum requirements in support of this requirement:
4.4.1. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official Business, controlled unclassified information may only be transmitted as directed in the PWS.
4.4.2. The Contractor shall not post to company websites, publications, newsletters or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the Project Manager or Contracting Officer, as applicable.
4.4.3. Because observation of events, operations, physical changes, etc. may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.) Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data or information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:
4.4.3.1. Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to vessels, aircraft, or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, vehicle, vessel or aircraft movements;
specialized equipment orders, deliveries, shipments, etc., Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the Project Manager or Contracting Officer, as applicable.
4.4.3.2. Government issued badges, identification shall be removed and/or concealed from plain sight when off base and shall not be left in vehicles or unprotected. Badges and passes may not be duplicated, copied or loaned to others. Lost or stolen identification badges, vehicle passes etc. will be immediately reported to the Project Manager, Contracting Officer, and/or installation Security Office.
4.5. Location/Hours of Operation.
4.5.1. Location. Place of performance is at FE Warren AFB WY. Telework shall not be permitted for this task order/contract.
4.5.2. Normal Hours of Operation. The contractor shall perform the services required under this contract during the normal operating hours of the site. The average workweek consists of 7:00 AM and 4:00 PM (MST), Monday through Friday, excluding holidays and base closures. During the planning phase of the project, the Government will identify any locations that require installation and cutover after normal business hours to avoid unnecessary operational mission impact. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the 90 CS Project Manager and Contracting Officer at least 7 working days in advance. The contractor shall accomplish the installation with minimum disruption of daily resident
4.5.3. Recognized Holidays. The contractor is not required to provide service on the following days:
New Year’s Day Labor Day Martin Luther King Day Columbus Day Presidents Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.6. Conservation of Utilities.
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
4.6.1. Lights shall be used only in areas where and when work is actually being performed.
4.6.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
4.6.3. Water faucets or valves shall be turned off after the required use has been accomplished.
4.6.4. Government telephones shall be used only for official Government business.
4.7. Environmental Controls.
4.7.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.
4.7.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the F.E. Warren AFB Fire Dept at 911 (landline) or 307‐773‐2931 (cell phone). The liability for the spill or release of such substances rests solely with the contractor and its agent.
4.7.3. Hazardous Material (HM). In the event that hazardous materials will be used in the execution of this contract, the contractor shall comply with all federal, state and local regulations concerning the use, storage, and reporting of HM in accordance with AFI 32‐7086, Hazardous Materials Management. The contractor shall be required to obtain authorization per the Installation Hazardous Materials Management Program before ordering or purchasing any hazardous product and may not may not bring a HM onto F.E. Warren AFB property, nor use a HM, until the contractor receives all required authorizations. This authorization process may take up to three weeks.
4.7.4. Green Procurement Program (GPP). In performance of this contract, contractors shall use
Environmental Protection Agency (EPA) designated recycled content products, Information Technology (IT) Energy Star products/appliances, Federal Energy Management Program (FEMP) Designated Energy Efficient Low Stand By Power products/appliances, U.S. Department of Agriculture (USDA) Bio based/Bio preferred products, Environmentally preferable products, Electronic Product Environmental Assessment Tool (EPEAT) registered products, Water Sense or other water efficient products, non‐ or Low Ozone depleting substances under the Significant New Alternatives Policy (SNAP), non or Low toxic or hazardous constituents (e.g. non‐ VOC paint) and any other environmentally sustainable product/method, to the greatest extent possible.
4.7.5. Asbestos. Due to the age of the building, the contractor must test for asbestos and lead prior to drilling into the real property. The government will not provide an asbestos report and it is incumbent upon the contractor to conduct the testing and abatement if required for installation. If the contractor detects asbestos or lead, the contractor must properly abate and dispose of the asbestos/lead (released during any drilling) IAW applicable laws and regulations. When testing, abating, or disposing, the contractor must take the necessary precautions to protect their employees, the public, and building occupants. If desired by the contractor, the contractor can hire a sub‐contractor to conduct the asbestos/lead testing and abatement;
however, ensuring proper qualifications will be the responsibility of the contractor.
4.8. Safety Requirements.
4.8.1. In performing work under this contract, the contractor shall:
4.8.1.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
4.8.1.2. Record and report promptly (within one hour), to the project manager or contracting officer, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.
4.8.1.3. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
4.9. Contractor Personnel.
4.9.1. Contract Manager: The contractor shall provide a contract manager who is knowledgeable of telecommunication cable installations and shall be responsible for the performance of the services. The contract manager must be able to read, write, speak, and understand English.
4.9.1.1 The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
4.9.1.2 The contract manager shall be available within 24 hours of a request by the Government to meet to discuss problems.
4.9.2. Contractor Employees: The contractor shall not employ persons for work on this contract if such employee is a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population.
4.9.2.1. The Contractor shall utilize employees who have adequate training, skills, and knowledge to perform the requirements in this PWS.
4.9.2.2. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
Contractor personnel who interact with Government personnel shall be able to communicate effectively in English.
4.9.2.3. The consumption of alcoholic beverages by Contractor personnel while on duty is strictly forbidden.
The use of illegal drugs by Contractor Personnel is strictly forbidden. The Contractor shall immediately remove any personnel who is under the influence of alcohol or drugs.
4.10. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in the 90th Telecommunications Installation Criteria Handbook, Applicable Publications and Forms. If requested by the Government, the contractor shall provide the original record, or a reproducible copy of any such record within five working days of receipt of the request.
5. Appendices
A. CAT 6 Wiring, Termination, & Connections
B. Sample Floor Plan W/Cable Numbering
C. Floor Plans
D. References
E. Product Examples
APPENDIX A
CAT 6 WIRING, TERMINATION & CONNECTIONS
APPENDIX B
SAMPLE FLOOR PLAN W/CABLE NUMBERING
APPENDIX C
FLOOR PLANS
Building 149
Building 286
Building 325
Building 846
APPENDIX D
The following documents are referenced within this document or are hereby recognized as a standard of good practice to be followed during the performance of all work.
National Fire Protection Association NFPA 70 National Electrical Code Underwriter’s Laboratories UL Standards for CAT 6 UTP Wire Rural Utility Service PE‐39 Specifications for Filled Telephone Cable PE‐80 Specifications for Gas Tube Surge Arrestors PE‐89 Specifications for Filled Telephone Cable with Expanded Insulation Uniform Building Code (UBC)
NEMA
Manufacturer’s Association AFR 88‐15 Criteria for AF Construction Air Force Documents AF TB 95‐03 Cabling and Distribution Systems AFSSI 7010 Emission Security Assessment AFSSM 7011 Emission Security Countermeasures
Review UFC 3‐580‐01 Telecommunications Interior
Infrastructure Planning and Design MIL‐HDBK‐419A (Vol. 1 & 2) Grounding, Bonding, and Shielding for Electronic Equipment and Facilities
MIL‐STD‐188‐124B ‐‐‐ Grounding, Bonding and Shielding for Common Long Haul/Tactical Communications Systems Including Ground Based Communications‐Electronics Facilities and Equipment
FAA‐STD‐019 REV E ‐‐‐ Lighting and Surge Protection, Grounding, Bonding, and Shielding Requirements for Facilities and Electronic Equipment
UL467 ‐‐‐ Grounding & Bonding Equipment
ANSI/TIA Standards ANSI/TIA‐526‐7‐A Measurement of Optical
Power Loss of Installed Single‐Mode Fiber Cable Plant, Adoption of IEC 61280‐4‐2 edition 2: Fiber‐ Optic Communications Subsystem Test Procedures – Part 4‐2: Installed Cable Plant – Single‐Mode Attenuation and Optical Return Loss Measurement
ANSI/TIA‐526‐14‐C Optical Power Loss Measurement of Installed Multimode Fiber Cable
Plant; Modification of IEC 61280‐4‐1 edition 2, Fiber‐Optic Communications Subsystem Test Procedures‐ Part 4‐1: Installed Cable Plant‐ Multimode Attenuation Measurement
ANSI/TIA‐568‐B Commercial Building Telecommunications Cabling Standard
ANSI/TIA‐568‐C.O Generic Telecommunications Cabling for Customer Premises
ANSI/TIA‐568‐C.0‐1 Generic Telecommunications Cabling for Customer Premises – Addendum 1, Updated References for Balanced Twisted Pair
ANSI/TIA‐568 Generic Telecommunications Cabling for Customers Premises – Addendum 2, General Updates
ANSI/TIA‐568 Commercial Building Telecommunications Cabling Standard
ANSI/TIA‐568 Commercial Building Telecommunications Cabling Standard (Addendum 1 – Pathways and Spaces
ANSI/TIA ‐568 Commercial Building Telecommunications Cable Standard‐Addendum 2, General Updates
ANSI/TIA‐568 Balanced Twisted Telecommunications Cabling and Components Standards
ANSI/TIA‐568‐Errata Sheet ANSI/TIA‐568 Optical Fiber Cabling Components
Standard ANSI/TIA‐568 Optical Fiber Cabling Components
Standard – Addendum 1, Addition of OM4 Cabled Optical Fiber and Array Connectivity
ANSI/TIA‐568 Broadband Coaxial Cabling and Components Standards
ANSI/TIA‐569 Telecommunications Pathways and Spaces
ANSI/TIA‐569 Telecommunications pathways and Spaces Addendum 1 – Revised temperature and Humidity Requirements for telecommunications Spaces
ANSI/TIA‐569‐Errata Sheet ANSI/TIA‐570 Residential Telecommunications
Infrastructure Standard ANSI/TIA‐598‐Residential Telecommunications
Infrastructure Standard ANSI/TIA‐606 Administration Standard for
Telecommunications Infrastructure ANSI/TIA‐607 Generic Telecommunications
Bonding and Grounding (Earthing) for Customer Premises
ANSI/TIA‐758 Customer‐owned Outside Plant Telecommunications Infrastructure Standard
ANSI/TIA‐942
TSB 36 Cable Requirements for Digital Systems TSB 40 Termination Components TSB 67 Cable Testing SP2840 CAT 6 Component Specifications
International Electrical and IEEE 802.6 MAN System requirements Electronics Engineers Association IEEE 802.8 Fiber Optic Advisory Board Standards IEEE 802.9 Integration of Voice and Data Systems IEEE 802.10 LAN Security Measures IEEE 802.3U 100BaseT and 100BaseX Standards IBC International Building Code
BITSEP Handbook Version 3.0 August 2010
90th Communications Squadron Telecommunications Installation Criteria
APPENDIX E
90th Communication Squadron has a small supply of Optical Cable Corporation parts to replace damaged jacks, bezels, or faceplates. The table below is a list of manufacturer’s part number and is an example of products that meet the product specifications of the PWS and TIC Handbook 2022.
Description Manufacturer Part Number
Duplex Faceplate / Office White FPSR0201
Duplex Faceplate / Ivory FPSR0200
Quad‐plex Faceplate / Office White FPSR0401
Quad‐plex Faceplate / Ivory FPSR0400
Jack UMJ CAT6 568A/B / Office White UMJA601
Jack UMJ CAT6 568A/B / Green UMJA604
Jack UMJ CAT6 568A/B / Black UMJA602D