Attach_1_-_Performance_Work_Statement_-_WTs.pdf

PDF 229 KB Posted

Attached to
Wind Turbine Generator Maintenance Federal contract opportunity
Solicitation number
FA4613-13-R-0024
Issued by
Department of the Air Force Global Strike Command

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Wind Turbine Generator Maintenance, newest first.
File Type Posted
WTGM_Q A_-_Version_4.pdf PDF
WTGM_Q A_-_Version_3.pdf PDF
WTGM_Q A_-_Version_2.pdf PDF
WTGM_Q A.pdf PDF
Attach_2_-_Wage_Determinations_2005-2587.PDF PDF
FA4613-13-R-0024_Solicitation.pdf PDF
Attach_3_-_Past_Performance_Survey.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WIND TURBINE MAINTENANCE

Performance Work Statement (PWS)

PREPARED BY

90 CES/CEOSS

26 JULY 2013

F. E. WARREN AFB, WY 82005

TABLE OF CONTENTS

Section Title Page No.

1. SCOPE OF WORK

2. DESCRIPTION OF SERVICES . . . . . . . . . . . . . . . . . . . . . . . . . … 3

2.1. QUALIFICATIONS . . . . . . . . . . . . . . . . . . ….. 3

2.2. SCHEDULED MAINTENANCE AND INSPECTIONS

2.3 POINT OF DEMARCATION 4

2.4. ALARM NOTIFICATIONS

2.5. DOCUMENTATION

2.6. SECURING TURBINES . . . . . . . . . . . . . . . . . . . …. 4

2.7. MFT MEETINGS

2.8. SOFTWARE & TRAINING

3. SERVICES SUMMARY

4. GENERAL INFORMATION

4.1. HOURS OF OPERATION

4.2. EMERGENCY SERVICES

4.3. PERSONNEL & VEHICLE PASSES/ID & SECURITY

4.4. CONTRACTOR EMPLOYEES

4.5. CONDUCT AND APPEARANCE

4.6. CONFLICT OF INTEREST

4.7. PROTECTION OF GOVERNMENT PROPERTY

4.8. SOLID WASTE DISPOSAL

4.9. STATE, LOCAL, AIR FORCE & FEDERAL REGULATIONS .. 8

4.10. GOVERNMENT FURNISHED FACILITY

Wind Turbine Maintenance

Performance Work Statement

1. SCOPE OF WORK

The contractor shall provide full service maintenance of two Vestas V47 660 kilowatt wind turbine generators (WTG’s) and one Gamesa G87 2 megawatt WTG at F. E. Warren AFB, WY. The Vestas V47 turbines are located atop 50 meter (164’) high tubular towers and the Gamesa G87 is located atop 67 meter (220’) high tubular tower. The Contractor shall provide all supervision, personnel, equipment, vehicles, transportation, tools and services necessary to perform work as outlined in this Performance Work Statement (PWS). Also, the contractor shall provide annual blade inspections for all WTGs. The objective of the PWS is to provide routine maintenance for the F. E. Warren Wind Farm. Major components are NOT considered routine maintenance, for example, but not limited to, replacement of:

blade, gearbox, generator, blade bearing, yaw bearing, main bearing and for the G87 transformer, SF6 high voltage disconnects switch or converter, these items will be replaced under a separate contract if necessary.

2. DESCRIPTION OF SERVICES

2.1. QUALIFICATIONS

The contractor shall have a minimum of three years of experience working with megawatt and sub-megawatt wind turbine generators (WTG’s).

2.2. SCHEDULED MAINTENANCE AND INSPECTIONS:

2.2.1 Preventive Maintenance includes but is not limited to laser alignment, cleaning and visual inspection of all parts per manufacturer recommendations, on-site balancing, commutator and slip ring service, filter replacements, lubrication of all parts per manufacturer recommendations, equipment inspections, and all other manufacturer recommendations. All preventive maintenance shall be scheduled in advance and have minimal impact on wind turbine operation. Frequency of maintenance, shall at a minimum, meet Manufacturer’s recommendations.

2.2.2 Predictive Maintenance includes but is not limited to vibration and modal analysis, Motor Circuit Evaluation (MCE) doble testing, partial discharge testing, operation deflection mode shape, finite element analysis software, synchronous rotor diagnostics, current analysis trending, thermography, ultrasonic testing, oil analysis, motor efficiency testing, and all other manufacturer recommendations. All predictive maintenance shall be scheduled in advance and have minimal impact on wind turbine operation.

Frequency of maintenance shall, at a minimum, meet manufacturer recommendations. Analytical results for testing and diagnostics shall be summarized in a report within one week of receiving the results. The report shall include any recommendations for actions needed based on the results.

The Contractor shall also conduct annual rope-based blade inspections, concurrent with other maintenance to minimize downtime at the three WTGs. Blade inspection and/or repair shall be documented in a technical report within one week of the activity and shall include a physical description of the condition of each blade, description and photographs of any observed damage, description of repair of known damage, recommendation for repair of any new damage observed, etc.

The Contractor shall set a schedule for all maintenance and inspections, and submit schedule for approval to the Contracting Officer (CO) within 30 days of contract award. Deviations to this schedule shall be approved by the CO prior to execution.

The Contractor shall notify the Contracting Officer Representative (COR) within two hours of any problem discovered during the service and maintenance events. Notification to the COR shall be done by phone call and e-mail. All work done on the WTGs shall be documented in a technical report (section 2.5). Reports will include applicable checklists and photographs.

2.3. POINT OF DEMARCATION (POD):

The POD for the two Vestas WTGs is all electrical power components and equipment on the generator side of the step-up transformers, up to the 690 Volt lugs of the transformer. The POD for the Gamesa WTG is all electrical power components and equipment on the 34.5KV elbow side of the transformer.

2.4. ALARM NOTIFICATIONS:

The Contractor shall, upon an alarm notification, respond by dispatching a crew of technicians to begin troubleshooting and fault analysis within three hours to include weekends, down days, family days, holidays, etc. The Contractor shall notify the COR the next duty day by phone call and/or e-mail. There is currently no Supervisory Control and Data Acquisition (SCADA) system for any of the WTGs. The 90 Civil Engineering Squadron plans to have a SCADA system in place and operational as soon as funding allows.

2.5. DOCUMENTATION:

All maintenance (scheduled & unscheduled) performed by the Contractor shall be annotated and maintained in a binder/log book at the base of each turbine with an additional copy provided to the COR within 24 hours or first duty day after maintenance is performed. The binder/log book shall at a minimum record individual identity, date, time and purpose of any visit to the wind turbine, the nature of any work performed thereon and such other details that may be pertinent to each turbine.

2.6. SECURING TURBINES FOR EXTENDED OUT-OF-SERVICE PERIODS:

The Contractor shall secure the turbines within 4 hours of a fault resulting in an out-of-service turbine generator, when diagnostics indicate or repair parts lead time may require the turbine to remain out-of-service for more than 8 hours, by releasing the hydraulic rotor brake.

2.7. MFT MEETING:

The Multi Function Team (MFT) is a customer-focused team instituted under the authority of senior leadership. The members of the team are responsible for managing the requirements over the life of the contract. The team shall consist of, but is not limited to, the following positions: Contracting Officer (CO), Contract Administrator (CA), Contracting Officer Representative (COR), Contractor, Functional

Commander (FC), Quality Assurance Program Coordinator (QAPC), and Technical Representative. The MFT shall meet monthly or if required the CO can call an off-cycle meeting.

2.8. SOFTWARE AND TRAINING:

The Contractor shall upgrade the control software with the latest version and provide software licenses to the Government (two copies) and its representatives (one copy). The Contractor shall provide training on the control software to the COR when required.

3. SERVICES SUMMARY

Performance Objective SOW Ref. Performance Threshold

1. SCHEDULED MAINTENANCE: The Contractor shall accomplish this task IAW this PWS

Para.2.2. 3 Valid Discrepancies per month

2. ALARM NOTIFICATION: The Contractor shall accomplish this task IAW this PWS

Para.2.4. 1 Valid Discrepancy per month

4. GENERAL INFORMATION

4.1. HOURS OF OPERATION:

The Contractor shall perform most of the services required under this contract during the normal operating hours. The Contractor shall, as a minimum, perform scheduled maintenance services from 7:30 A.M. to 4:30 P.M., Monday through Friday, excluding Federal Holidays. At the pre-performance conference and within one duty day of changes, the contractor shall provide a listing of business, home, cell or pager numbers, and email address of the Project Manager to the CO and COR. The following personnel and/or organizations are authorized to contact those individuals directly; CO, COR, CE Customer Service, Fire Department and Security Forces. The contractor shall report ALL contractor labor hours (including subcontractor hours) required for performance of services provided under this contract for this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www/ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

4.2. EMERGENCY SERVICES:

The Contractor can obtain emergency services from the following phone numbers: Security Forces: 773- 3501, Fire Protection: 773-2931, Ambulance Service and in the event of an emergency: 911.

4.3. PERSONNEL, VEHICLE PASSES/IDENTIFICATION AND BASE SECURITY:

http://www/ecmra.mil

4.3.1. The Contractor shall obtain all necessary cards, passes, decals, or other items required for access to work areas. The Contractor shall fill out all required paperwork then submit it to the Base Contracting Office (Bldg 208).

4.3.2. All Contractor owned or privately owned vehicles requiring licenses must obtain a vehicle registration pass, which requires proper state vehicle registration, proof of insurance and valid driver’s license. Upon completion or termination of the contract, or an individual’s employment, the Contractor shall immediately return the cards, decals and other material to Pass and ID.

4.3.3. The Contractor shall comply with all F. E. Warren Air Force Base (FEWAFB) security requirements IAW AFI 31-101, Physical Security Program, and AFI 31-209, Air Force Resource Protection Program. The Contractor shall furnish the CO, COR, and Security Forces (Bldg. 34), a current list of contractor personnel, upon request.

4.3.4. The Contractor shall be responsible for safeguarding all government property provided for contractor use. At the end of each workday, the Contractor shall secure all government facilities accessed during the workday. The Contractor shall maintain government furnished facilities to the same standards as similar areas/facilities occupied by the Government. These areas shall, at all times, be clean and neat, free of fire hazards, and free of unsanitary/unsightly conditions and safety hazards.

4.3.5. The Contractor shall establish and implement key control methods to ensure keys issued to them by the government are not lost, duplicated, misplaced or used by unauthorized persons. The Contractor shall immediately report occurrences of lost or duplicated keys to the CO. In the event the CO cannot be reached, the Contractor shall notify the Security Forces at ext. 3501. If keys are lost or duplicated by the Contractor or employees, the Contractor shall be required, to replace locks without cost to the Government. The Government may replace all locks and keys for that system and the total cost deducted from the monthly payment due to the Contractor if master keys are lost or duplicated by the Contractor or employees. The Contractor shall control access to all government provided lock combinations.

4.4. CONTRACTOR EMPLOYEES/KEY PERSONNEL/CERTIFICATIONS/LICENSES:

4.4.1. Prior to contract start date the following information must be provided to the CO and kept current for the Primary Project Manager and Alternate: name, business phone number, cell phone and a 24-hour a day phone number. The CO must be notified of any changes in personnel within 24 hours of the change.

The Contractor shall furnish all certificates of competency to the CO and COR at the pre-performance conference.

4.4.2. The Contractor shall provide a Primary Project Manager (PM) and an Alternate Project Manager (APM) who shall have full authority to act for the Contractor on all contract matters, including Work Orders, sign and negotiate contract modifications and shall be responsible for the management and performance of all daily work.

4.5. CONDUCT AND APPEARANCE:

4.5.1 Employees shall dress in a manner that meets industry standards safety requirements. Wearing of any military uniform, or parts thereof, is prohibited under this contract.

4.5.2. Smoking in government facilities is prohibited.

4.5.3. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the CO as a potential threat to the health, safety, security, general well being, or operational mission of the installation and its population.

4.5.4. Contractor personnel shall conduct themselves in a professional, courteous, and workmanlike manner at all times while on FEWAFB.

4.6. CONFLICT OF INTEREST:

The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. Nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense Directive 5500.7 Standards of Conduct.

4.7. PROTECTION OF GOVERNMENT PROPERTY:

4.7.1. The Contractor shall take all necessary precautions to ensure against damage to Government property. Any damage caused by the contractor shall be repaired or replaced, at no cost to the Government. The Contractor shall complete all repairs within two duty days with materials of like type, quality, and finish by skilled mechanics of the trades involved. Should the Contractor fail to complete repairs within the times allowed the Government reserves the right to correct the damages and deduct all costs from the Contractor’s monthly payment. All damage caused by the contractor shall be reported in writing within 24 hours to the CO.

4.7.2. All company vehicles shall be operated IAW base traffic regulations.

4.7.3. The Contractor and employees shall comply with Fire Prevention and Protection as defined in AFI 32-2001 90, SW Supplement 1. A copy of this regulation may be obtained upon request to the COR.

Base fire prevention personnel may make periodic routine inspections for regulation compliance.

Burning of any material by the Contractor is prohibited.

4.8. SOLID WASTE DISPOSAL:

4.8.1. The Contractor shall properly dispose of all waste and debris. As much of the organic waste as possible shall be recycled. All other waste shall be disposed of properly according to all applicable OSHA and AFOSH standards. The Contractor shall be responsible for turning in organic waste to the base composting facility. However, if facility is closed it is the responsibility of the contractor to ensure organic waste is turned into certified composting facility off base, at no additional cost to the Government.

4.8.2. Transporting debris or policed materials shall be accomplished in a manner preventing particles from becoming airborne, such as in covered vehicle beds or enclosed dumpster boxes.

4.9. STATE, LOCAL, AIR FORCE AND FEDERAL GUIDELINES AND REGULATIONS:

4.9.1. The Contractor shall comply with OSHA requirements and provide the COR with a Material Safety Data Sheet (MSDS) on each chemical utilized during the service of this contract. A list of materials with the appropriate MSDS sheets shall be provided by the Contractor prior to beginning contract performance and prior to use of any new materials. The Contractor shall submit any new or changed MSDS to the Contracting Officers Representative for acceptance prior to use. The Contractor shall perform all work in accordance with federal, state, local environmental instructions to minimize pollution, exploitation, and degradation of environmental and natural resources. The Contractor shall maintain all MSDS in accordance with applicable OSHA regulations and criteria.

4.9.2. The Contractor shall ensure that their operations do not expose any personnel to any hazardous conditions (i.e., noise, chemicals, smoke, exhaust, etc.) as covered by OSHA/AFOSH Standards. The Contractor shall not store hazardous chemicals on base.

4.9.3. The Contractor shall immediately notify the COR and Fire Department (ext. 773-2931 or 911), if any fuels, oils or other harmful materials are spilled.

4.10. GOVERNMENT FURNISHED FACILITY/EQUIPMENT:

See Appendix A of the PWS for furnished spare parts list for WTGs.

The Contractor will be provided the spare parts listed in Attachment 1 at the time of award. All acquisition of parts needed/required after initial award will be the responsibility of the Contractor.

A report containing all spare parts used/consumed during the maintenance process and an inventory of remaining parts will be provided to the CO and COR at the end of the base year and each option year.

Appendix A – Furnished Spare Parts

CSL Description Part Number Qty V47

AC453D Automotive & Industrial Grease 149047 58

AC453G Suitable for Lubrication of Bearings 149139 11

AC453H Castrol Optipit Special Grease 149064 1

AC453L Formulated Grease for Yaw System 149156 15

AC453N Mineral oil spray for Yaw system 149187 23

AC453Q Used for long care Lub. Of Bearings 149190 44

AC454Q Low viscosity lubricant spray 149074 23

AC454T Hydraulic, Synthetic Element 109113 3

AC454U Spin-on Cartridge Filter Element 109062 2

AC454V High Pressure, Depth Insert Filter 130552 3

AC454W BG Stacked Filter Insert 109046 8

AC456H Aux, relay, trip main circ. Br. Q8 116270 3

AC456H Relay thermostat brake 116270 1

AC456H Relay, stand still heating 116270 14

AC456H Aux. relay, power fac. Corr. 1 116270 14

AC456I Automatic fuse, aux. Supply 116612 1

AC456J Automatic fuse, motors 188251 1

AC456K Automatic fuse, Voltage measuring 188249 1

AC456M Automatic fuse, contactor coils 116617 1

AC456M Automatic fuse, processor supply 116617 1

AC456O Earth-leakage Circ. Breaker light S091993 1

AC456R Contactor, yaw motor CW/CCW S093330 12

AC456T Relay, supply control voltage 116253 6

AC456U Thermo relay, yaw motor, 50 Hz S093185 2

AC456V Yaw Motor, 60 Hz 115254 3

AC456W Cable, twist-sensor 703537 1

AC458P Contactor, hydraulic pump S093341 2

AC458U Thermo relay, hydraulic pump 188235 1

AC458V Thermo relay, nacelle vent.Low 188230 3

AC458W Thermo relay, nacelle vent.high S093182 3

AC458Z Inductive sensor, rotor 114252 2

AC459B Inductive sensor, generator 114264 2

AC459D 3 Pole Contactor, 230V Coil (Comp.# K601) S093679 3

AC459E Capacitor, 12.5kVAr, 690V, 60Hz S092368 3

AC459F Fuse, capacitor 188560 3

AC459H Contactor, Bypass S093289 2

AC459I Capacitor RC-link phase L2 S092396 4

AC459J Linear transducer (Hydraulic) 114295 2

AC459W Cable, linear transducer 703586 2

AC459X Emergency Stop button, yaw plate 116361 2

AC459Z Relay, communication switch 116262 4

AC460A Thermostat brake S093189 2

AC460L Watch dog 51021703 2

AC461G Filter Insert/PV-2-7-V Pump/ELMotor F-9999 1

AC461J Air Treatment Filter D103 2

AC496P For Enclosed Gear Drives & Bearings 149341 2

AC497T Zinc hex nut ISO 10511 M16 8 Tzn 157729 18

AC499M VRCC Control Processor 51027306 9

AC499N 600KW VRCC Resistor Unit 705100 2

AC499O 1700V VRCC Processor 705180 6

AC510R Battery Charger 880448 1

AC514H Metal Extension Frame 190700 1

AC519U CABLE W584 COMM. 7.5 F/ FOR VRCC 737561 3

AC527S MODULE CT3409 RACK UNIT 51340901 2

AC539L CIRCUIT Q8 CIRCUIT BREAKER, SACE ISOMAX S6N630 117049 2

AC539N MOTOR HYD. AM112MZ4 VOLT 60HZ. 115259 3

AC539N MOTOR HYD.AEG. AM112MZ4 60HZ 115259 3

AC539O MODULE THYRISTORS MOD TT215N22KOF 2200V S092106 6

AC539W CONTACTOR EH800-30-11 230/240V 50HV S093026 1

AC539X SWITCH PRESSURE BRAKE DS302/F-55/SS 109155 3

AC539Y SWITCH PRESSURE BRAKE DS302/F-55/SS 109156 3

AC539Z SOLENOID 3/2 W1DCA8 24VDC 131325 2

AC540A SOLENOID 24V AS32101A-A1794-24V 109596 2

AC540J CABLE ANEMOMETER W381, V39 703592 4

AC540L CABLE W382 FOR WIND VANE, V39 703593 4

AC543B 3-PHASE YAW MOTOR 115253 1

AC584O CHAMFER WASHER ISO 7090 M16 300HV 157016 24

G87

AC498F SEALING RING 6X1 50237 1

AC498G SEALING RING 10X1 50238 1

AC498H SEALING RING 20X2 50239 1

AC498I SEALING RING 25X2 50240 1

AC498J SEALING RING 30X3 50241 1

AC498N SEALING RING 38X3 50242 1

AC498P POWER SUPPLY 51027 2

AC498Q ENCODER 50300 1

AC498S POWER SUPPLY 10A 50973 1

AC498T POWER SUPPLY 2.5A 50971 1

AC498U POWER SUPPLY 5A 50972 1

AC498V SENSOR PT100 50840 1

AC498X CIRCUIT BREAK 12.5-16A 188251 3

AC498Y PUMP SIDE COUPLING 42/55 A; BLK IRON 50836 2

AC499P PT100 OIL SENSOR GP003004 1

AC499Q PT100 SENSOR, BEARING 1 GP003014 1

AC499R IGBT MODULE + CONVERTER GP036986 1

AC499S CONTROL MODULE GP043715 1

AC499T ANEMOMETER 9000601 1

AC499U WIND VANE 9000602 1

AC499V CABLE TIE 530MM GP001017 1

AC499X O-RING 177,17X191,15 GP020975 1

AC499Y FUSE BASE GP014575 1

AC500D CURRENT TRANSDUCER GP011811 2

AC500E CURRENT TRANSFORMER GP012969 2

AC500F CONTROL UNIT GP012965 2

AC500H RELAY P393169 1

AC500I OGS OVERSPEED GUARD SYSTEM P393115 1

AC500K ELECTRIC ARC DETECTOR P393170 1

AC500L CAPACITOR 3UF GP014672 1

AC500N POSITION SENSOR 193895 3

AC500P ULTRASONIC ANEMOMETER 106426 1

AC500R RELAY GP013110 2

AC500S HYGROSTAT GP014679 1

AC500T THERMOSTAT GP014676 1

AC500U OVERVOLT. PROTECTOR GP012974 1

AC500V FILM GP014589 1

AC500W RESISTOR FILTER GP014597 1

AC500X CURRENT TRANSFORMER GP012973 1

AC500Y TEMPERATURE SENSOR GP014680 1

AC500Z ELECTRONIC FUSE GP004891 2

AC501B MODULE TWO DIGITAL INPUTS GP007546 2

AC501C ANALOG OUTPUTS GP004898 2

AC501D TEMPERATURE READER GP004895 5

AC501E ANALOG INPUTS GP004897 2

AC501F INTERBUS OUTPUT GP007637 2

AC501G CPU FAN GP009823 1

AC501H PLC HEADER GP007548 1

AC501O PLC HEADER GP004888 2

AC501P BATTERY CHARGER GP007357 1

AC501S POWER SUPPLY GP011830 2

AC501V POWER SUPPLY GP011820 1

AC501W CONVERTER GP004899 2

AC501X DIGITAL OUTPUTS GP004890 3

AC501Y COMMUNICATIONS GP004896 2

AC502B MODULE COMM. DIGITAL INPUT CARD GP004892 2

AC502C INLINE CONTROLLER GP007638 1

AC502E RELAY GP011826 2

AC502F CARTRIDGE FUSE GP011827 1

AC502G FUSE HOLDER GP011825 2

AC502I CONNECTOR GP011829 1

AC502J 2.5 TERMINAL BLOCK WITH SPRING CAGE GP004858 1

AC502L 2.5MM TWO-LEVEL SPRING TERMINAL GP004866 1

AC502N RELAY COIL 4 CONTACTS GP007544 1

AC502O THERMOSTAT GP007571 1

AC502P HYGROSTAT GP011821 1

AC502Q THERMOSTAT GP011822 1

AC502R CONNECTOR GP011824 2

AC502U FILTER CARD GP011831 1

AC502W VENTILATION DAMPER ACTUATOR GP009355 2

AC502X POWER SUPPLY SYSTEM GP010672 1

AC502Y INVERTER FAN GP011813 3

AC502Z CONTROL UNIT GP012964 1

AC503A CARD GP011832 1

AC503B ENCODER INTERFACE GP011818 1

AC503C POWER SUPPLY FOR MODULES GP004889 2

AC503D FUSE 800A GP011816 5

AC503E FUSE 1000A GP011817 3

AC503F FAN GP011814 2

AC503G SENSOR PT100 114279 1

AC503H INDUCTIVE SENSOR 114941 1

AC503S PT100 SENSOR, RINGS GP011982 1

AC503T FAN VENTILATIN 9" BLADE GP014600 1

AC503U MOTOR 1.5KW GP005890 2

AC503V RESISTOR GP011828 2

AC503W PT100 INSULATED BEARING GP011980 1

AC503X SENSOR PT100 GP007526 1

AC503Y VOLTAGE CONTROL FILTER GP012967 1

AC503Z BATTERY GP007356 1

AC504A ACTIVE CROWBAR UNIT GP012962 1

AC504B RESISTOR GP012963 1

AC504C FUSE 630A GP014590 1

AC504D CAPACITOR 5100UF GP014600 1

AC520N CABLE WS251B C393085 2

AC520X ANALYZER NETWORK 50/60HZ 230V GP007671 1

AC520Y PROTECTOR OVERVOLT 385VAC GP007674 2

AC521J POWER SUPPLY CONVERTER CARD GP089748 2

AC521K FUSE 400AMP 690VOLT GP0996428 6

AC521L POWER SUPPLY NCBC CONTROL GP090774 1

AC579J ADJUSTMENT TOOL FOR BALLUFF SENSOR GP016965 1

AC581J RELAY KR330 RELECO SV-1303-012 GP088288 1

AC583O CONTROLLER INLINE 200LBS/SQIN ILC 200 GP007638 1

AC592T SOLENOID VALVE 50784 2

AC592U BLOWER FAN GP14598 1

AC593L TRANSFORMER GP014580 1

AC594F LEFT YAW BONFIGLIOLI GEAR C430031C 1

HAZARDOUS MATERIALS

AC453D SHELL RHODINA GREASE 0939 149047 18

AC453L SHELL STAMINA HDS 2 5385.010.020 9

AC453N KLUBER GRAFLOSCON A-G 1 ULTRA 149187 or 149189 21

AC453Q KLUBER KLUGERPLEX BEM 41-132 149190 40

F. E. WARREN AFB, WY 82005
Performance Work Statement
1. SCOPE OF WORK
2. DESCRIPTION OF SERVICES
4. GENERAL INFORMATION