This is a site plan and excavation route map for a fiber optic infrastructure project at Vandenberg Space Force Base. The document depicts a proposed excavation route spanning 10,500 linear feet from handhole 75AB to manhole 75C, illustrated on a 2019 aerial imagery base map of the installation. The proposed path is marked in red with multiple access points identified, including three manholes (MH 75A, MH 75C) and several pullboxes and handholes along the corridor. The project includes installation of 1.25-inch fiber optic ducts with 14-gauge tracer wire, with specific infrastructure elements labeled at various coordinates and reference numbers throughout the route.

The map serves as a technical reference document for construction planning, indicating the physical layout of the proposed underground utility installation across varied terrain within the military installation. The legend identifies key features including the proposed excavation path, existing fiberoptic line (shown in purple), buildings, vehicle parking areas, and road networks. The scale and coordinate references provide precise geographical documentation necessary for project execution and contractor bid preparation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ÔÑ RMH 75 A

HH 75 AB

ÔÑ

EA

.2

SI

D R

D U

C

TS

w ith g a ge tr ac er w ire

00075 00082

00070R00008060050906300064

0007038900081

000600080000089068907R66R µ 480 720 960240 120 0 240 Feet

Legend ---------- Proposed Path

R manhole

5 pullbox

ÔÑ handhole proposed fiberoptic line Address_P

Buildings

Vehicle Parking

Road Labels

Vandenberg_Imagery 2019_BaseAll.sid

RGB

Red: Band_1

Green: Band_2

Blue: Band_3

Proposed excavation route 10,500 feet HH 75AB to MH75C

Proposed excavation route 10,500 feet HH 75AB to MH75C

Proposed excavation route 10,500 feet HH 75AB to MH75C