This document is a Request for Information (RFI) for a federal contract opportunity involving asbestos and lead abatement at Vandenberg Space Forces Base. The project scope includes removing 2,016 square feet of 9"x9" vinyl composition floor tiles with black mastic and 2,500 square feet of lead-based green ceramic wall tiles with mastic adhesive in Building 870. Key details include that no existing asbestos or lead survey is available, and contractors must independently verify quantities. The project will require HVAC shutdown, contractor-provided restroom facilities, and a third-party industrial hygienist for final clearance. Contractors must anticipate potential security-related access delays when entering the base and confirm utility and power availability during the AF Form-103 work permit process. Both restrooms will be included in the abatement scope, with the goal of preparing the building for Amentum's relocation by the end of September.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised SOW.pdf | ||
| B870 0511.jpg | JPG image | |
| B-870 LT1.jpg | JPG image | |
| B870 0509.jpg | JPG image | |
| B870 0512.jpg | JPG image | |
| Asbestos_RFIs.docx | DOCX document | |
| B-870 LT5.jpg | JPG image | |
| B870 0510.jpg | JPG image | |
| Asbestos_B870_Map 1.pdf | ||
| Asbestos_RFQ.pdf | ||
| Asbestos_RFQ.pdf | ||
| Atch 1_Asbestos_SOW_30Apr2025.pdf | ||
| Atch 4_Wage Det_22Dec2024.pdf | ||
| Atch 3_ClausesProvisions.pdf | ||
| Atch 2_Pricing Schedule.xlsx | XLSX spreadsheet | |
| Asbestos_RFQ.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 June 2025
30 CES ASBESTOS / LEAD ABATEMENT REQUESTS FOR INFORMATION (RFI’S)
QUESTIONS IN BLACK / ANSWERS IN RED
1. Is there an actual asbestos and lead survey for the project? If so, could this be shared with the contractors bidding?
A1. No, there are no existing usable asbestos and/or lead-based paint surveys that meet the requirements for this project.
2. Are there project site photos available to review? If so, where could these be found?
A2. Photos provided to the Contracting Officer by Jose Hernandez and Corinne Holloway.
3. Is there an active EPA ID # for the project site to allow for proper transportation and disposal of waste?
A3. Yes, there is an active EPA ID #. Coordinate with Jeff Hyder, HW Program Manager, or the Consolidated Collection Accumulation Point (CCAP) for approval of use.
4. Verify the entire scope of work is limited to the abatement and removal of 2,016 square feet of 9"x9" vinyl composition floor tiles and associated black mastic and 2500 square feet of lead based green ceramic wall tiles with mastic adhesive. No other asbestos and/or lead containing materials are included in the scope of work?
A4. The government provided rough square footage of asbestos floor tiles and the green wall tiles that contain lead. The contractor is responsible to thoroughly research and investigate the quantities. The quantities will increase due to including both restrooms to the scope of work. The scope of work is primarily for asbestos and lead abatement of the floor and wall tiles.
5. Upon removal of the lead based green ceramic wall tiles with mastic adhesive is the contractor to leave the wall with just studs. All mortar, backing, etc. will be removed and leaving stud walls only?
A5. If that is the appropriate demolition method for this application then, correct.
6. Contractor will not be responsible for patch and/or paint due to containment (staples, tape, etc.) for removal of asbestos and lead containing materials, correct?
A6. Correct.
7. HVAC will be shut down for duration of abatement activities, correct?
A7. Correct, however the contractor is to confirm the shutdown with the HVAC shop during the AF Form-103 work permit process for scheduling purposes.
8. Power will be provided for the duration of abatement activities, correct?
A8. Correct, however, the contractor is to confirm the power availability with the Electric Shop during the AF Form-103 work permit process for scheduling purposes.
9. Water will be provided for the duration of abatement activities, correct?
A9. Correct, however, the contractor is to confirm the water availability with the Utilities Shop during the AF Form-103 work permit process for scheduling purposes.
10. Restroom facilities will be provided for the duration of the abatement activities, correct?
A10. Contractor is responsible for their own restroom facilities, i.e. porta-potties.
11. 2.1.6 Third Party Industrial Hygiene and Sampling Requirements: Is it required to have a consultant full time, every day while work is in progress? Or just for final clearances upon completion of abatement?
A11. No, it is not required to have a third-party Industrial Hygienist for the entire duration of the project while work is being performed. The third-party Industrial Hygienist is required for the final clearance upon completion of abatement.
2.4.2 Main Base Access: Talks about allowing for delays due to in-place security procedures. What are the expected delays we may encounter in minutes and/or hours?
A12. Unknown on the minutes and or hours it is expected for delays, however, it is the contractor’s responsibility to anticipate delays due to security procedures while gaining access to Vandenberg Space Forces Base.
12. Will the restrooms be included in this abatement project? This will require a revised SOW indicating the change.
A13. Yes, both restrooms will be included in the asbestos and lead abatement process.
13. Is the transition between the green tiles and the floor included in the lead abatement?
A14. Define transition? Is the question referring to removing the red quarry tile cove base that is below the green wall tiles? If there is green wall tile behind the quarry tile cove base, then yes. If there is no green wall tile behind the quarry tile cove base, then no.