PHASE 4A QUESTIONS-ANSWERS.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Vandenberg SFB DWDM Phase 4 Federal contract opportunity
Solicitation number
FA461024Q0018
Issued by
Department of the Air Force Space Command

About this file

This document is a set of Questions and Answers related to a Request for Quote (RFQ) for Dense Wavelength Division Multiplexing (DWDM) Optical Transport Network (OTN) Phase 4 at Vandenberg Space Force Base, California.

The RFQ is a 100% Small Business Set-Aside under NAICS code 334118 (Computer Terminal and Other Computer Peripheral Equipment Manufacturing) with a 1,000 employee size standard. The contract will be Firm Fixed Price per the Contract Line Item Numbers (CLINs) provided. Key details include: racks will be Government Furnished Equipment, on-site Project Manager costs should be spread across labor CLINs, materials will be paid upon delivery, and the contractor will build upon the existing Risk Management Framework package. A pre-proposal conference and site visit will be held on July 23-24, 2024, and quotes are due by August 13, 2024 at 12:00 PM PDT. The RFQ is being issued by the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to Vandenberg SFB DWDM Phase 4, newest first.
File Type Posted
Atch 1 SOW DWDM Phase 4 20240725.pdf PDF
FA461024Q00180001 DWDM Phase 4 Amend 1 20240726.pdf PDF
Atch 3 Technical Performance Questionnaire 20240712.docx DOCX document
Atch 2 BNJ DWDM Phase 4 Redacted.pdf PDF
Atch 1 SOW DWDM Phase 4 20240425.pdf PDF
FA461024Q0018 DWDM Phase 4 20240713.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QUESTIONS & ANSWERS - FA461024Q0018 - VANDENBERG SFB, CA - DWDM PHASE 4A
20240729 1330
NUMBERRFP REFERENCEQUESTIONANSWERS
1SOW, Page 6, Para 2.12 and TABLE 1This refers to additional racks required per Table 1, column A3. We understand there are existing racks from previous efforts and our plan is to use those per SOW requirements. Also per Table 1 in the SOW, it shows racks are GFE. Does this include all racks required? May we assume sufficient racks are available and we are to install GFE racks only?Yes, all required new racks will be furnished by the Government.
2SF1449, CLINSThere is not a separate CLIN for the on-site PM. Should the contractor spread the costs of the on-site PM throughout the labor CLINS or will the Government add a separate CLIN which can be billed based on efforts worked?On-site PM costs should be spread throughout the labor CLINS.
3SF1449, CLINSWill the Government provide payments by CLIN for equipment when delivered and inventoried and subsequently for labor phases by CLIN as completed?Materials CLINS are intended to be paid when all materials for that category (i.e., Core Ring) and CLIN has been received by the Government. Similarly, as labor CLINS are completed, invoices should be submitted.
4SOW, Page 6, Para 2.12 and TABLE 2For spares may we assume the OEM (Ciena's) recommendations for critical spares are sufficient when considering existing and newly required spares as required in Table 2 of the SOW.Yes, the OEMs recommendations for critical spares required for the new equipment installed by this contract are sufficient.
5SOW, Page 12, Para 5 and 5.4Since a DoD SECRET clearance is required for on-site personnel or escort, will the Government provide a DD FORM 254 please? If we have multiple entities performing work, will the Government provide some escorting support for example for power installation if our on-site PM is otherwise engaged with other efforts with this project?Yes,the Government will provide a DD FORM 254 upon or soon after contract award.

The intent is that the Government not be needed for escort duties except where specific access is required that cleared contractor personnel might be able to obtain.

6SOW, Pages 9-10, Para 14For accreditation and RMF activities, may we assume we will build upon the existing RMF package and update artifacts and information that changes due to the implementation of this project?Yes, the Contractor will build upon the existing RMF package and update artifacts and information that changes due to the implementation of this project.
7SOW, Pages 9-10, Para 14The final sentence states "Final payment will be made upon completion of the DWDM/OTN installation and submission of all necessary Cyber Security artifacts." May we consider this to apply to CLIN 0007, CLIN 0016, and CLIN 0028 as they are the CLINS related to accreditation?Yes,what is now the Accreditation and Deiverables CLINS are the accurate application.
8GENERALDue to the complexity of this RFP, will the Government extend the due date by 7 days please?No, the due date will not be extended.
9For Option 3. Can the Government confirm that the power supplies will be AC 120/208v? Table 4 shows AC pluggable power suppy however it shows 24/48v which is typically associated with DC power supplies.The Government requires AC power supplies for Option 3.
10Can the Government provide more detail on the Core Node Split in section 2.16.1? Are all degrees anticipated to move to the new chassis?Some Core Node chassis have all slots in use. The purpose is to balance the number of open slots between the exising and new chassis.
11What client down time can the network sustain during Node Split activitiesThe required downtime will be discussed, agreed to and accomodated as needed.